Quote:
It is also very likely the Port of Liverpool will have additional flows of bulk freight in the next few years as some existing facilities are converted to handle the flows all of which are likely to move by rail placing further pressure on the Chat Moss route.
Please tell me how you work that out? The traffic is already there but no one wishes to use the rail facilities hence why there is and especially NO intermodal / liner services in / out of the port. Some FOC's would like to operate these trains but there is no demand for them or not financially viable enough to make a complete liner in/out of the port. One of the reasons for this, is that any containers currently arriving / departing Port of Liverpool are being transported by road via the M57/A5300 to/from Garston FLT or Stobarts Terminal at Widnes. You may not realise this but "coal" rail traffic to/from the port is scheduled to drop off sometime in the future as it is planned to come from Scotland as well as possibily more from E/Port too. So the reality of the situation, is remarkably the Port is losing rail traffic and not actually gaining any.
Read the Peel Ports plans as a whole and you will note the idea of moving containers especially is via water to/from the Port to/from other locations especially on the Manchester Ship Canal. The new larger ships for the new river terminal will replace some of the existing flows already using Royal Seaforth Terminal. Yes there will be some new traffic but not as great as Peel Holdings are telling.
As I've said before, take some of Peel Holdings marketing statements as just publicity to make them look "friendly" to the outside world along with saying the "right" words to gain extra funds they need for particular projects.
Dont get me wrong I wish to see new rail flows in and out of the Port and I really hope it does happen but the current vibes etc suggest otherwise. Sorry
.
To clarify a number of points as follows.
1. There are no intermodal (ie trains carrying containers) out of Seaforth for several reasons,
a) It is widely accepted within the shipping industry that rail/road deliveries and vice versa are not competitive under 100 miles, which due to Liverpool's geographic position means much of it's natural hinterland is best served by road. As a result only Scotland and the South West fall well outside this area.
b) Most container shipping lines operating into Seaforth operate into other UK ports so can position or reposition empties to either Felixstowe, Tilbury or Southampton and shortly London Gateway. Forget Thamesport, because as of next month the port will have no deep sea vessels calling at the port.
c) Due to EU competition rules the shipping lines all have separate haulage tariffs for each different UK Port, usually based on round trip back to the same port, which keeps the cost competitive with a shipper/consignee wishing to handle the movements themselves, although there are exceptions.
d) The majority of container traffic through Seaforth is destined for, or originates in North America a market which traditionally has never been a big user of rail transport in the UK, probably due to the rules that the lines have to follow to comply with their tariffs which are strictly monitored by the US authorities.
e) Freightliner, used to operate a service to and from Seaforth which was tripped to Garston, mainly for Scottish cargo. However, they withdrew the Seaforth train because the daily volume was not consistent to make the trip economical, although they still accept bookings for it and absorb the shunt movement by road to Garston.
2) When the riverside container opens (Liverpool2) the terminal will at least double the container capacity of the port, and more importantly will allow considerably larger vessels to operate into the port. Present limit is Panamax size or about 4000 teu dependent on tides and cargo deadweight. Liverpool2 will offer at least 14000 teu which will enable vessels from the Far East and Asia to call at the port. Of course some of these vessel calls could replace some of the traffic that currently moves on feeder vessels from Antwerp, Rotterdam, Le Havre and Southampton, but Peel will also be looking to attract new users as well developing the terminal into a hub with feeder vessels operating to other smaller ports in the Irish Sea. However, these 14000 teu plus vessels are unlikely to be involved in the North Atlantic trade as the main US Ports on the East Coast and Montreal are unable to handle them for several more years at least. Seaforth will also remain open and some of the container facilities will be upgraded. The introduction of larger vessels will inevitably alter the way some inland destination are served as it will simply not be possible to handle the increased volume by road on the existing road network, even with a planned new bypass to link the terminal to the motorway network. As a result, it may be some locations further afield may be better served by rail/road combination, but it is all a question of the shipping lines attracted to the terminal and their volumes. I also agree that Peel will continue to promote and gain revenue the feeder service up and down the Manchester Ship Canal and they are presently formulating plans to develop the site of the former Bowater Paper Mill into a freight village as well as planned facility Acton Grange Warrington both of which will be rail linked in addition to the existing facility at Irlam. To be fair the feeder on the Canal really is only viable when there importer or exporter is located alongside the Canal and has sufficient volume as the additional lifts to road vehicles and shunts soon negates the cost advantages over a direct road delivery over this distance.
3) As far as bulk flows are concerned, Peel are presently extending the animal feed facilities at Seaforth which will sheds and/or berths elsewhere in the port to be redeveloped to handle other bulk products. In addition the channel between Gladstone Lock and Seaforth is currently being widened to reduce the risk of damage to the increased number of bulk vessels that will be using the port. These bulk vessels up to a maximum of Panamax, (about 63000 tonnes) size will be capable of carrying all sorts of product from grain, coal, scrap, biomass etc to several refurbished berths in the port, whilst other bulk vessels will use the Langton Lock to access existing facilities to the south as far as Canada Dock which also could have it's rail connection restored.
4) As far as LBT coal berth at Gladstone Dock /Fiddlers Ferry movements is concerned, the last I heard was the terminal is leased by EON from Peel and as a result EON have to pay the operating costs even if no ship uses the facility. For this reason, the terminal has, in the past, often handled coal for other power producers so the terminal is certainly not dependant on Fiddlers Ferry as the only outlet. Ellesmere Port is restricted to the size of ship that can navigate the Manchester Ship Canal, which means a length of about 170 mtrs with a beam of 21 mtrs, and a draft of 8 mtrs. This is considerably smaller than the size able to enter Langton or Gladstone lock on the Liverpool dock system. Ellesmere Port might therefore only be used for specific grades of fuel to burn or mix with other products to reduce carbon emissions.
5) I agree any marketing information by any organisation is almost certainly likely to contain a certain amount of hype, and whilst Peels plans may look to include elements of this, they are based on what they perceive the market requires based on some considerable research. Only time will tell if this research was right.