Surely, you could change some of the class 450 sets into a sub set say 450/9, that had 2+2 seating with tables within them, rather than the 2+3 seating they have now. Then those are use on the Waterloo - Portsmouth route?
At the end of the day are the people complaining about not having the 444's on the Waterloo - Portsmouth route, sad on the fact that they now have 2+3 seating without tables and would prefer 2+2 seating with tables or is the problem the location of the doors that they are not at the ends of the carriages in the 450's as they are in the 444's?
Right do you actually have a clue how the service provision bumph as stated by the DaFT(or whoever) works?
SWT have to provide X number of seats from A to B per hour, the only way they can do that is to use the 450s in 12 coach formations on every train, so a few figures for you (using a 350/1 as the best solution possible with 2+2 seating and tables)-
....................................1st/standard(tip up)
4 coach 450/0 (2+3) seats- 0/70, 24/32, 0/61(9), 0/70 so 24/233(9)
5 coach 444/0 (2+2) seats- 35/24, 0/47, 0/76, 0/76, 0/76 so 35/299(0)
4 coach 350/1 (2+2) seats 0/60, 24/32, 0/50(9), 0/60 so 24/202(9)
So a-
12 coach 450/0 gives you 72/699(27)
12 coach 350/1 gives you 72/606(27)
10 coach 444/0 gives you 70/598(0)
If you are serious about using 450s with 2+2 seating you will lose 93 seats per train, what are you going to do with them, the trains are already full and standing up from Haslemere (never mind Guildford) so those 93 passengers have got to go somewhere, suggestions?
Note-
The line is already run at maximum capacity during the peaks (hence some trains being routed via the new line as there is not the capacity to cross at Woking jn) so you cannot run any more trains even if there were any available.