swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,274
smelter is long gone !
Do you mean out of use? By sheer coincidence I drove past on the way to Druridge bay a couple of days ago, the site still looks like it always did, even if shut?
smelter is long gone !
The smelter closed last year and demolition will commence this summer.Do you mean out of use? By sheer coincidence I drove past on the way to Druridge bay a couple of days ago, the site still looks like it always did, even if shut?
The smelter closed last year and demolition will commence this summer.
Massive opencast mine planned near Druridge Bay
17 Jul 2013 08:42
Proposals have been unveiled by Banks Mining for a massive new opencast coal mine near Druridge Bay in Northumberland
http://www.thejournal.co.uk/news/north-east-news/huge-druridge-bay-opencast-mine-5117230
Many thanks for this link.
I'm with you, regards supporting the Tees Valley Metro. But think there is a need to maybe extend the line to Guisborough (most of the trackbed is still there). Guisborough is a much bigger place that it was in 1964, and again Guisborough appears to growing towards Nunthorpe, so a station at somewhere like Pinchinthorpe will eventually be in the middle of an extended Guisborough. I realise Nunthorpe Parkway is meant to cater for the likes of Guisborough and Stokesley passengers, but the way the area around Nunthorpe, Guisborough, Great Ayton & Stokesley are developing , I can see Nunthorpe parkway being swamped in years to come.While supporting the Tees Valley Metro I wonder if developing the direct connection between Teesside and York and then to Leeds would be a better growth driver than the connection to Darlingtron.
John
While supporting the Tees Valley Metro I wonder if developing the direct connection between Teesside and York and then to Leeds would be a better growth driver than the connection to Darlingtron.
John
I'm with you, regards supporting the Tees Valley Metro. But think there is a need to maybe extend the line to Guisborough (most of the trackbed is still there). Guisborough is a much bigger place that it was in 1964, and again Guisborough appears to growing towards Nunthorpe, so a station at somewhere like Pinchinthorpe will eventually be in the middle of an extended Guisborough. I realise Nunthorpe Parkway is meant to cater for the likes of Guisborough and Stokesley passengers, but the way the area around Nunthorpe, Guisborough, Great Ayton & Stokesley are developing , I can see Nunthorpe parkway being swamped in years to come.
Also, as a further enhancement, seeing as Thornaby and Middlesbrough are due to be interchange stations between the two lines (Darlington-Saltburn, Hartlepool-Nunthorpe), it would be good to see someone like Grand Central serve Thornaby and Middlesbrough once or twice a day, giving Middlesbrough a direct link to London once again.
Personally, I was somewhat disappointed last year when Grand Central announced the extra service from Kings Cross that only went as far as Hartlepool. I think it would have been a good opportunity to test the water so to speak, and instead of going from Eaglescliffe to Hartlepool, it could of gone from Eaglescliffe to Thornaby and Middlesbrough. Sunderland and Hartlepool would still have had four Kings Cross trains a day, But Middlesbrough would have gained one.
The cost of an extension to Newbiggin would be too high for the cost benefit ratio so would never happen unfortunately.
Regarding the operation of the line, at one point there was an analysis of tram-train operation - by ordering trams at the same time as the Tees Valley Metro tram-trains through economies of scale however, in the light of the economic situation, I suspect this will now never happen.
I also think Guisborough need its own station not just access to a parkway station up th road.
I also think Guisborogh need its own station not just access to a parkway station up th road. There is a trackbed of a railway which I think used to run on to Brotton that runs close to the center of Guisborough that could be used to build a new Guisborough Station which could combine the virtues of being central while having space for a parkway. With the building of James Cook Hospital station the line needs more trains anyway.
If you look at the map, building a new rail connection crossing the Tees between Port Clarence and the Eastern side of Middlesborough station would allow GC to serve Middlesborough AND Sunderland and dramatically cut times between Hartlepool and Middlesborogh.
I love the idea of diverting that service to Middlesbrough.
I also think Guisborogh need its own station not just access to a parkway station up th road. There is a trackbed of a railway which I think used to run on to Brotton that runs close to the center of Guisborough that could be used to build a new Guisborough Station which could combine the virtues of being central while having space for a parkway. With the building of James Cook Hospital station the line needs more trains anyway.
If you look at the map, building a new rail connection crossing the Tees between Port Clarence and the Eastern side of Middlesborough station would allow GC to serve Middlesborough AND Sunderland and dramatically cut times between Hartlepool and Middlesborogh.
I also think Guisborogh need its own station not just access to a parkway station up th road. There is a trackbed of a railway which I think used to run on to Brotton that runs close to the center of Guisborough that could be used to build a new Guisborough Station which could combine the virtues of being central while having space for a parkway. With the building of James Cook Hospital station the line needs more trains anyway.
If you look at the map, building a new rail connection crossing the Tees between Port Clarence and the Eastern side of Middlesborough station would allow GC to serve Middlesborough AND Sunderland and dramatically cut times between Hartlepool and Middlesborogh.
Whilst I agree that continuing the line through to Brotton, and linking it up to the Boulby Potash line would be idea, there's no getting past the fact that three quarters of a mile of trackbed between Hutton lane and Pinchinthorpe looks like it has been built on, so unless your saying demolish the houses, I can't see how the full length can be re-instated.Rather than stopping at Pinchinthorpe I would keep on going but up the old line to Brotton and stopping on the bridge over the road wich is pretty much due south of the old staion site.
Thois wouold be mich more central and still give space for car parking.
John
Whilst I agree that continuing the line through to Brotton, and linking it up to the Boulby Potash line would be idea, there's no getting past the fact that three quarters of a mile of trackbed between Hutton lane and Pinchinthorpe looks like it has been built on, so unless your saying demolish the houses, I can't see how the full length can be re-instated.
Having never walked the old trackbed route in the Hutton Village area, I'm sure how many houses are on the trackbed, but looking at Google maps, its the only area where the old trackbed is not clearly visable. If there are only 1 or 2, then yes it might be possible to demolish them, but if there are more, it becomes more of a problem.
I only meant use that trackbead as far as Guisborough, not all the way to Brotton>![]()
I would guess al the trackbeds we could use have ceased to be designated as railways so the if houses are in the way it might be as well to divert the line. I think the same happened with the Tyne and Wear Metro extension around the Pallion area.
This is the area I meant.
John
I did think that was where you meant. It just south of the original Station(which was just north of the Cricket pitch in the picture), and is the idea location. The problem is how to get the line there in a cost effective way.
If you look a little west, just off the view you have captured.(Sorry I don't know how to capture an image off Google maps).

But as a quick, easy and relatively cheap solution, a parkway station between Pinchinthorpe and Hutton Gate might be the way to go, for now. There would be nothing to stop it becoming a through station at some time in the future depending on demand, and how much money is available for any extensions to the system.
Has there ever been any consideration to reopening the line through to the former terminal station of Newbiggin-by-the-Sea. In a Bradshaw 1950 timetable (Table 74) that I saw some time ago, there was quite a regular service from Newcastle (Manors).
It's busy. Combined with the X20 & X22, there are seven buses an hour between Ashington and Newcastle - which is the primary corridor for the three routes.What is locally thought of the Arriva Northumbria X21 service from Newbiggin to Newcastle ?
It's busy. Combined with the X20 & X22, there are seven buses an hour between Ashington and Newcastle - which is the primary corridor for the three routes.
Evening and Sunday services - which for a long time were hourly - now run every 30 mins.
With a journey time of 45 mins (off peak) to 60 mins (peak) - or 40/50 mins on the X20 - it will be tough for any rail connection via Northumberland Park that involves having to change to Metro to get into the city.
Locally, many people would prefer a connection that was an extension to the Metro, rather than one which involved a change to heavy rail.
It's busy. Combined with the X20 & X22, there are seven buses an hour between Ashington and Newcastle - which is the primary corridor for the three routes.
Evening and Sunday services - which for a long time were hourly - now run every 30 mins.
With a journey time of 45 mins (off peak) to 60 mins (peak) - or 40/50 mins on the X20 - it will be tough for any rail connection via Northumberland Park that involves having to change to Metro to get into the city.
Locally, many people would prefer a connection that was an extension to the Metro, rather than one which involved a change to heavy rail.
I really do hope that the ABT line is reopened to passenger services (using heavy rail) as I for one would use the service on a daily basis. Currently, if I want to get into town (Haymarket being the only destination available) it takes around 50 minutes for me to get there using the X10/11 service from Newsham in Blyth.
I can, however, drive to Cramlington rail station and be in Newcastle Central Station within 17 minutes of boarding the train, or Manners station - to the east of the city - within 13 minutes. I for one, don't want to be dependent on using a car, but currently I feel I have no choice.
The ABT line is a fully-functioning freight-line and while it will cost £millions to build stations etc., I believe it will pay for itself in time and help to reduce congestion on our roads.
Not only will the line help to link Northumberland with Tyneside, it will also give Southeast Northumberland the vital link to other National Rail services that it needs.
Fingers-crossed it get the go-ahead.
Just a thought but how about a Tram Train from St James's Via monument and Manors then connecting onto the ECML and then Blyth and Tyne with the next stop being Northumberland Park. The new Connection between the Metro and ECML would take some money but it would mean the service was fast into Newcastle city Centre.
John
Err, so are you suggesting a link to the East of Manors where the Metro runs alongside the ECML before climbing onto the Byker viaduct? I know there is some junction work there to allow T&W metros to run from Gosforth Depot-Jesmond Jcn-Manors-East of Manors where the driver changes ends to head back through Manore to St.James.