Cutting this out of the "Bakerloo east" thread
District Line: Turn the Uxbridge-Acton part of the Picadilly over to the District (and then severing the connections at Hammersmith/Barons Court, leaving simplified connections at Acton purely for engineering trains).
Four track to Richmond, or terminate the Distric at Gunnersby, allowing the Richmond LO branch to become AC
Metropolitan: Four track to Rickmansworth and then terminate. Turn "fast" lines north of Harrow over to NR.
These together would create a Sub Surface Railway with no interaction with deep tube lines or Network Rail.
Oh, and extend all stations to be able to take S8, convert all the S7s to S8 (with identical layout).
Crazy level SSL: all junctions grade sperated.
Insane level SSL: That, plus an extra pair of tracks dedicated for Circle Line services, back on a simple Circle.
Bakerloo: As well as extending south to Hayes, I'd have it tunnel back underground where the Queens Park sheds are, running west into the "gap" between Uxbridge and West Drayton.
London Overground:
if an outer London freight orbital was constructed, there's be less pressure on the NLL. So, properly four-track from Dalston through to Camden West, but keep it as two seperate pairs of tracks. Run Watford DC services along the southern pair, via the Primrose Hill junction, rather than into Euston, on a higher frequency.
make the Watford DC AC, and extend the wires to New Cross, New Cross Gate and Surrey Canal Road. Where there's a will, there's a way to do so through the tunnels. Rather than sharing tracks into Watford Junction with the met, dive down before High Street, have low level platforms there and at Junction, surface, run to St Albans and tunnel through to terminate at a low level beneath the MML station. Run St Albans-New Cross as a service.
LO to take over Aylesbury (and Chesham)- to go AC. Also Welwyn, Hertford North and East, new terminating services to Harlow, Enfield line, Chingford and more.
Disentangling the Sub Surface lines from one another, and the District from itself, is sadly beyond impractical
District Line: Turn the Uxbridge-Acton part of the Picadilly over to the District (and then severing the connections at Hammersmith/Barons Court, leaving simplified connections at Acton purely for engineering trains).
Four track to Richmond, or terminate the Distric at Gunnersby, allowing the Richmond LO branch to become AC
Metropolitan: Four track to Rickmansworth and then terminate. Turn "fast" lines north of Harrow over to NR.
These together would create a Sub Surface Railway with no interaction with deep tube lines or Network Rail.
Oh, and extend all stations to be able to take S8, convert all the S7s to S8 (with identical layout).
Crazy level SSL: all junctions grade sperated.
Insane level SSL: That, plus an extra pair of tracks dedicated for Circle Line services, back on a simple Circle.
Bakerloo: As well as extending south to Hayes, I'd have it tunnel back underground where the Queens Park sheds are, running west into the "gap" between Uxbridge and West Drayton.
London Overground:
if an outer London freight orbital was constructed, there's be less pressure on the NLL. So, properly four-track from Dalston through to Camden West, but keep it as two seperate pairs of tracks. Run Watford DC services along the southern pair, via the Primrose Hill junction, rather than into Euston, on a higher frequency.
make the Watford DC AC, and extend the wires to New Cross, New Cross Gate and Surrey Canal Road. Where there's a will, there's a way to do so through the tunnels. Rather than sharing tracks into Watford Junction with the met, dive down before High Street, have low level platforms there and at Junction, surface, run to St Albans and tunnel through to terminate at a low level beneath the MML station. Run St Albans-New Cross as a service.
LO to take over Aylesbury (and Chesham)- to go AC. Also Welwyn, Hertford North and East, new terminating services to Harlow, Enfield line, Chingford and more.
Disentangling the Sub Surface lines from one another, and the District from itself, is sadly beyond impractical
