northwichcat
Veteran Member
From Northern Rail's Twitter feed
If that is accurate and they will have the extra EMUs in operation by this December I assume the only options are:
1. Taking on stored 317/7s available immediately.
2. Subleasing 323s from LM (323s are the only EMUs that Manchester based crews sign so can be introduced with no prior crew training.)
Northern Rail said:currently in discussion with the DfT on the implications of providing electric trains to operate by Dec 2013
If that is accurate and they will have the extra EMUs in operation by this December I assume the only options are:
1. Taking on stored 317/7s available immediately.
2. Subleasing 323s from LM (323s are the only EMUs that Manchester based crews sign so can be introduced with no prior crew training.)