Eagle
Established Member
Should point out that CP5 starts in nine months. Pretty much every current project is a CP5 plan.
As there is an election between now and the end of 2019 I don't think we can say for certain that CP5 plans won't get reviewed and revised after the next election.
Also some of the CP5 plans are a bit vague at present. For instance, will North TPE get new or cascaded EMUs and what about the soon to be newly electrified local routes around Huddersfield and Leeds?
Like I said in my later post I was saying what I think they should do if they want to avoid new DMU orders in CP5 not what they will do.
Giving a new area relatively new class 172s on lines that aren't currently high priority for electrification would be an excellent way of getting the general public backing plans for electrification as otherwise users of lines not down for electrification will think they'll just get cast-offs until new diesel trains are ordered.
--- old post above --- --- new post below ---
As there is an election between now and the end of 2019 I don't think we can say for certain that CP5 plans won't get reviewed and revised after the next election.
Also some of the CP5 plans are a bit vague at present. For instance, will North TPE get new or cascaded EMUs and what about the soon to be newly electrified local routes around Huddersfield and Leeds?
As I thought it's a green eyed monster thing. no logic in wiring Snow Hill, we just want your shiny new DMUs!
To re-iterate and expand there is no point in wiring Snow hill lines until the layout and signalling is sorted at Worcester and you can wire to Hereford as there is so much interaction of train crew and rolling stock movements between Tyseley LMD and Worcester LMD to deliver services in the region.
As there is an election between now and the end of 2019 I don't think we can say for certain that CP5 plans won't get reviewed and revised after the next election.
Not necessarily a green eyed monster thing. Those DMUs are needed elsewhere, and since noone seems willing to build new one's, the Snow Hill route might berry most convenient to wire.
The Guardian mentions the A14, the Mersey Gateway (new road bridge east of Runcorn) and HS2 Phase 1 as the transport infrastructure projects 2014-20 to be approved on Thursday.
Somehow I don't think NR's CP5 plans will be changed.
As for the green eyed monster thing I would say that certain posters on this forum had never heard of/took no interest in the Snow Hill lines until the 172s came along. Are there people out there who would prefer nearly new 172s instead of extra routes in their own area being wired for whatever perverse reasoning.
it would be nice if an A14 road upgrade was matched with a Felixstowe-Nuneaton electrification plan.
Mind you, it would be nice if an A14 road upgrade was matched with a Felixstowe-Nuneaton electrification plan.
I love the way people here actually think the general public give a stuff whether there are wires or not. They generally don't unless the wires lead to lower prices through lower running costs (Which they don't) or increased capacity due to newer trains (Which they sometimes do).
Getting super excited about electrification as if its the holy grail of railways is mostly an enthusiast thing. Often it's just something else to foul up the evening commute when there is a problem..
I suggest you research the sparks effect. What your saying is almost entirely false.
Maybe new stations or reopening of old ones, round here there are two big cases being looked at
Soham, Fulbourn or Cherry Hinton not both (Cambridge)
Other projects that are being pushed is the reopening of the March to Wisbech line (less likely to be mentioned)
New rolling stock for Norwich to London
Ely North Junction new track layout (if not already given the green light)
Unlikely that any of that will be announced, ESPECIALLY the opening of the Wisbech line.
Personally I can't see the Snow Hill lines being done without the Chiltern Mainline, and vice versa.
If you did the Chiltern Mainline you'd need to go at least as far as Snow Hill, and you might as well continue to Worcester. And if you did the Snow Hill lines, then because of the electric spine you'd actually have wires from Birmingham all the way up to Aynho, so continuing to Marylebone wouldn't be too difficult.
People suggested in 2009 that a change of government might effect the CP4 plans. In hindsight nothing changed whatsoever, because the 2005 Railways Act would have had to be amended to alter the NR budget settlement.
AIUI that is still the situation now, as the Act hasn't been changed...
Agreed. I think Worcester through to Marylebone is inevitable as it kills two birds with one stone (the high density Snow Hill lines and the Chiltern mainline) but it is going to have to wait a while.
If for the sake of argument it does get completed within ten years, would it not make sense to electrify Worcester to Oxford too?
4 car test runs taking place next week (or the one after, can't quite remember what is for what) so the timing would be convenient...
I suggest you research the sparks effect. What your saying is almost entirely false.
Simply throwing up the wires and replacing like for like (such as a 170 for a 377 or 150 for 318) won't make a jot of difference for passenger use. The so-called 'sparks effect' is the result of major timetable improvements that are usually done in line with electrification - usally faster and more frequent services run by new(er) rolling stock. When the West Coast was electrified in the '50s to '70s, the journey to Manchester was reduced by one hour and an hourly service was introduced for the first time - that was what produced the increased ridership. Similarly, TransPennine electrification will see the Liverpool - Newcastle journey reduce significantly and the frequency of Manchester - Leeds increased.
The best example of a boost in use without the need for electricity is the introduction of the Intercity 125 - often described as the 'saviour of BR'. Contrast that with the electrification of the ECML which turned out to be quite a damp squib...