NathanPrior
Member
Does the electricity run out at Ore?
Not as far as I'm aware, although I've only done that bit of the route once
Does the electricity run out at Ore?
Does the electricity run out at Ore?
Does the electricity run out at Ore?
Surely this is a case for bustitution? Lydd has struggled since the days of Silver City Airways.![]()
Yes it does, the line was only electrified as far as Ore, to where South Eastern EMUs run.
As far as my knowledge goes, the land surrounding where the station was is wooded to the south and fields to the north. The former entrance is currently an agricultural crossing - still as inaccessibly rural as ever. It hasn't changed much at all.Can someone assist with a query. Snailham Halt, situated between Doleham and Winchelsea, which was closed in February 1959, is the only station on the Marshlink line to have been closed. Has there been any major changes to the land utilisation of the area where this station was situated since closure was effected ?
Southeastern only run to Ore in the peaks. Southern, however, use it as their EMU terminus all day.
Ore carriage shed was closed circa 1986, any stabling is now done at Alexandra Park sidings and Hastings platform 1 (there is a siding alongside this, but is it even electrified?). I believe. 171s and some 375s reside at St Leonards Depot too. The former depot is now a housing estate: The Sidings.Ore is also where Hastings depot is, or at least carriage sidings.
Ore carriage shed was closed circa 1986, any stabling is now done at Alexandra Park sidings and Hastings platform 1 (there is a siding alongside this, but is it even electrified?). I believe. 171s and some 375s reside at St Leonards Depot too. The former depot is now a housing estate: The Sidings.
Indeed. The existence of the depot was, I believe, the only reason the 3rd rail goes as far as Ore. In purely operational/economic terms, once the depot went it may have made sense to rip up the juice rail and serve Ore solely with through services to Ashford, but I can't imagine that going down too well with the locals...
Speaking of which, which was the last route to be de-electrified but remain open?
The southern stub of the Woodhead saw occasional footex traffic after the wires went but can't think of any others, other than Tyneside branches that were switched to DMU before being converted to Metro and re-energised.
Can someone assist with a query. Snailham Halt, situated between Doleham and Winchelsea, which was closed in February 1959, is the only station on the Marshlink line to have been closed. Has there been any major changes to the land utilisation of the area where this station was situated since closure was effected ?
not a cat in hells chance this line will ever be built :roll:
Not wishing to be pedantic, but it already exists !
I even traversed it by train last December.
pedant - that should read REbuilt!(perhaps improved would be better!)
This is true. Judging by the speed we were going it would need quite a bit of work doing![]()
Whilst I agree about the Marshlink services only being properly overcrowded south of Hastings, I've been on a couple of trains where all the seats were taken between Hastings and Ashford (one on a November Sunday afternoon!). Maybe in an ideal world (minus having three/four cars all the way to Ashford), a 171/7 could attach/detach at Hastings to provide four coaches for the busy stretch to Brighton.Whilst people campaign for better services the reality is that passenger levels are quite low except for leisure traffic in the summer. Even though Three Oaks and Winchelsea have two hourly service these days passengers outside the school trains are pretty rare.
Even though I'm regularly on one of the trains that stops at Doleham I cant remember seeing a passenger alight or board a train there since Thumper days!
The only reason that Marshlink (proper) would be busy on a November Sunday would be either because The Hastings line via Tonbridge is closed for engineering works and people are travelling via Ashford and HS1 to get to London or because there has been a special event where people have come down from London (Rye Bonfire Night).
I often travel back to Portsmouth from Rye early evening on a Sunday, theres a few students travelling back to Brighton but a train departing from Rye with more than 20 passengers would be exceptionally busy.
The entire line is single and has a 20 mph speed limit, and there are no fewer than 14 level crossings between Appledore and Lydd.
Err. Lydd is in the sticks?
Marshlink/HS1 is the fastest route between Hastings and East Coast Mainline, West Coast Mainline, Midland Mainline and Great Eastern destinations and for such destinations it requies the same ticket as is used for journeys via Tonbridge (and so the same price).
Just checked the airfield on google earth. On runway 21 the overrun is only 220 yards before you hit the railway which is not enough really, the taxiway does not look wide enough even for a B737 (its only 16 yards wide), so every airliner would have to backtrack to take off on 21 and if landing on 03 would have a very tight turn around at the far end and backtrack again. For an airfield in the middle I can,t see anyone spending the large amount of money to upgrade the place.