Invariably Network Rail.Who pays for the lineside clear up operation for these irregular services? Is it money well spent?
Invariably Network Rail.Who pays for the lineside clear up operation for these irregular services? Is it money well spent?
take it you are not a fan of steamers then?
I would love to know the reasoning behind your comment, as others have said, it isn't the railtour operator's fault the lineside fire happens, again, it is the lack of time, care and money put into taking care of lineside infrastructure and vegetation. If you look at old photos of some famous locations you will see a lack of trees and hedges, if you compare those old photos to now, there are trees everywhere. This only comes about due to a lack of either Money and time or just care for such matters.
also if you don't mind me asking, are you a regular commuter by train? only asking because this will help me to understand your perspective better.
In which case, we should just scrap all main line steam operations.
Either they pay the costs required to allow them to run without setting fire to everything or they should not be permitted to run.
We can't afford to go cutting back all this vegetation for a handful of steam operations, additionally there are the wildlife implications to consider (railway ground is now effectively one of the most extensive nature reserves we have).
Invariably Network Rail.
In which case, we should just scrap all main line steam operations.
Either they pay the costs required to allow them to run without setting fire to everything or they should not be permitted to run.
We can't afford to go cutting back all this vegetation for a handful of steam operations, additionally there are the wildlife implications to consider (railway ground is now effectively one of the most extensive nature reserves we have).
Not always...though i may be proved wrong. NR have to pay for external fires (i.e. not caused by the railway); though i see in this instance West Coast Railways are disputing the blame - citing the amount of recent lineside fires that have taken place when no steam loco was operating.Don't the operators have to pay track access charges. Are they not enough to cover the costs?
Don't the operators have to pay track access charges. Are they not enough to cover the costs?
Frequent small fires!
At least around Factory Lane/Skew Bridge embankment and cutting South of Preston.
Jeff
would anyone have noticed the reduction in traction?
But back then residents along the line didn't kick up a fuss to the local council/MP/newspapers every time tree-felling took place!:roll:
it is hardly ridiculous that the network is not cleared of vegetation to the same levels. For day to day diesel and electric operation it simply isn't needed. To suggest that Network Rail spends large amounts of money on the resources to clear the banks just so a small number of kettles can run is ridiculous.
They are storing up problems for the future - cutting down trees once they have become large needs skilled personnel, and expense, as well as damage to structures embankments! Having a train equipped with flails etc, and a a few guys with strimmers / brush cutters has in my opinion be cheaper in the long run.
Does NR still run the weed killer trains anywhere now
Indeed, but 'cheaper in the long run' is a somewhat alien concept on the modern railway.
They would, when it stopped moving. Kettles are terrible in low adhesion.
The problem with steam is that the force is applied very unevenly making wheel slip much more likely than with diesel of electric traction.
Not quite right.
It was certainly an alien concept in the days of BR, under strict financial controls and a Government who thought railways were a historical legacy.
But now, whole life costing (to use it's proper name!) is pretty much a requirement of the submissions NR makes to the ORR in funding determinations.
Vegetation removal is, however, a tricky one. But in some places there are now trials going on with total fence to fence devegetation in year 1, followed by annual strimming thereafter to determine its cost effectiveness. Failry big trials in some locations (like 45 miles of route in one area).
How the hell do NR manage to spend 10-20k per mile clearing vegetation? Do they use weedkiller made from gold dust?! This is why the system costs so much to run nowadays, the ludicrous and utterly crippling cost of doing even the most basic things.
!
Large trees can cause a fair amount of ground movement. This is partly due to the water they drink. In a dry spell they can cause the ground to sink, as the sub/ soil dries out.
Don't plant them close to your house!
Structures will large numbers of trees on them are now at equilibrium with the trees in place.
Attempting to remove them will lead to all sorts of problems.
This isn't weeds. It is trees. Get a quote for a tree surgeon to take down a 20 foot tree in your garden. Including disposal. Then mention you have another 200 like it. And he has to do it on Sunday mornings or over night. Then tell him his staff have to be trained in trackside safety, and various other competences. And that there is only one place he can get access to the railway and he has to transport all 200 trees there when cut down. And he has to leaflet drop any neighbours weeks in advance.
If the bill is less than £10k you have the contract!
Which is why BR took the approach of preventing trees growing to any size in the first place.
Having been out this afternoon, in part doing veg surveys, there are an awful lot of trees that are well over 19 years old....
Having been out this afternoon, in part doing veg surveys, there are an awful lot of trees that are well over 19 years old....