Network rail said it was repaired and that no one was put at risk. BBC news somewhere posting from phone so cant get it up right now.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

eMeS

Member
Joined
12 Jun 2011
Messages
954
Location
Milton Keynes, UK
Radio York are reporting that another gap, this time a "six inch gap" appeared "near Selby" 3 weeks ago and that trains travelled "at over 100mph" over this gap....

Does anyone know from where the steel for the rails was sourced? UK with full documentation, or some other source...
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
Does anyone know from where the steel for the rails was sourced? UK with full documentation, or some other source...


Most rails for NR are rolled here in Britain it was done at Workington now Corby, with some imported from France, Germany, Switzerland and Italy.
 

lincolnshire

Member
Joined
12 Jun 2011
Messages
884
Most rails for NR are rolled here in Britain it was done at Workington now Corby, with some imported from France, Germany, Switzerland and Italy.

I think you will find its Scunthorpe that replaced Workington, as we if not they seem to be doing a lot of replacement of long welded rails in that are over the past couple of years.
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
I think you will find its Scunthorpe that replaced Workington, as we if not they seem to be doing a lot of replacement of long welded rails in that are over the past couple of years.

True, but in my defence one grim northern town looks much like another to those of us who live down south.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,672
Theres grim parts up north and grim parts down south, thus there are some grim parts of Great Britain. Surely thats the end of that argument?

Hmm, im sure NR could do without these continually going public...
 

dstrat

Member
Joined
8 Apr 2010
Messages
194
How big is the gap that the train has to 'jump' at Newark flat crossing?
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
How big is the gap that the train has to 'jump' at Newark flat crossing?

No bigger than most other crossings, about an inch. You actually get a longer gap at the common crossing on a set of points, that's why some new sets have a swing-nose crossing instead. However, at no point is the wheel tread not supported by something.
 

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
I have never understood why rail joints are made between two cantelevered rail ends, drilled twice (3 times nowadays!) through the web right where the load is greatest. Why on earth are they not made over a support? A timber laid longitudinally parhaps, so that the vicious loading/unloading effect as a wheel passed over the joint would be eliminated. I have watched the delivery rail at a fish-plate joint be depressed by the on-coming load, so that the take-up rail presents a little step or ridge to the wheel, resulting in something like a hammer blow to it. The longitudinal timber I postulate would be equipped with a normal base-plate, then an elongated JOINT baseplate and finally another normal baseplate. This would spread the load, and minimise the tendancy for one rail-head to be depressed below the other. Normal timbering beyond, of course. I remember my "Peco" 00 guage fishplates were little U-section pockets into which the two rail-ends were slid. A 12" to the foot version of this, perhaps?
 