(cannot believe I thought Mauve is like a creamy brown)
Whoops! I actually meant to say Peach or Beige. Or something equally difficult to see on white![]()
The Invisible line!
(cannot believe I thought Mauve is like a creamy brown)
Whoops! I actually meant to say Peach or Beige. Or something equally difficult to see on white![]()
Not invisible if you quote it!The Invisible line!
Out of interest when did the Metropolitan Line to Barking get renamed the H&C line ??
Unfortunately refurbished Metrocars have lost this useful feature.Perhaps TFL could do like T&W Metro does and have Black Destinations with the Respective colour as the Background Colour-obviously on the original Northern line you would need to have White on a Black Background.
Out of interest when did the Metropolitan Line to Barking get renamed the H&C line ??
Think I've seen that before, or a similar map - without the Battersea extension. The tube map extract on Wikipedia shows the via Charing Cross line, Battersea included, as golden-brown.
The one used on TfL's publicity, here, still shows both lines as black, although not connecting. I also notice that Battersea is shown as an interchange, but not mentioned what with (one or other of Battersea Park and Queenstown Road, both within walking distance?). Also neither is shown as having step-free access even though it's almost certain that both will :P
Two, was it pure coincidence that both the East London Line and Silverlink were coloured orange before LOROL existed?
One, why was the Nine Elms option chosen ahead of an interchange with the Victoria line at Vauxhall?
"Silverlink" was marked as National Rail and outline black right up until the Overground was invented, was it not?
Eagle:1292403 said:[But it was always orange on the ATOC London Connections and London and the South East maps. (Odd considering what colour their livery was.)
I think Green and Dark Blue were already taken. Not sure who by though, but off the top of my head, probably Thameslink, the services out of Paddington or SouthCentral.
Isn't the plan to gradually segregate the two branches of the Northern Line by the end of the decade? Might we see a new underground line (name)?
I know but then we wouldn't have the issues with the depots and also in the Camden Town redevelopment isn't remodelling the junction included?
It won't be that way round; that would involve everything crossing tracks at Camden Town junction.
The tube map is deceptive; the City branch actually crosses under the ChX branch at right angles at Euston, passes to the west of Mornington Crescent, and then swings round to approach the ChX branch from the west at Camden Town.
Not true. See diagram on this page.
http://www.districtdavesforum.co.uk/index.cgi?board=northern&action=display&thread=6095
Plan is to separate the two halfs to enable more trains as part of the Northern Line upgrade part 2. Currently dependant on wholesale rebuilt of Camden Town. Although Northern Line fleet was ordered with this in mind, additional trains are now being sought in connection to NLE and extra trains for the Jubilee Line to allow for 32tph. As they are similar units with different traction, order is expected to be placed for both as it saves money on the three projects involved.
That diagram is exactly what I described (notwithstanding the incorrect labels, as pointed out in the thread).
For an easier to understand picturelook at the Euston to Camden area on this map.
That diagram is exactly what I described (notwithstanding the incorrect labels, as pointed out in the thread).
For an easier to understand picturelook at the Euston to Camden area on this map.
By NLE you mean Battersea? Good thinking with running the orders together![]()
But the 1995 stock and 1996 stock have different traction systems. Dispite the names the 1995 stock has a more modern traction equipment.
The 1995 stock uses alstom's three phase IGBT oinx
The 1996 stock uses traction equipment derived from the 465 networkers
If the Jubilee Line was to get 1995 stock then there would most probably be different maintinence schemes for the different equipment
Perhaps some clarification is needed as to what you meant by that, as this seems to be the cause of some confusion...that would involve everything crossing tracks at Camden Town junction....
Two questions, if I may.
One, why was the Nine Elms option chosen ahead of an interchange with the Victoria line at Vauxhall?
As well as the answers already given, the main one was (as with Clapham Junction) the additional passenger demand would have made Vauxhall station, and the Victoria Line between Vauxhall and Green Park, dangerously over capacity and was therefore not considered acceptable by TfL.
...and I still maintain that that's not a good enough reason. They should have routed via Vauxhall, built the platform tunnels during construction, and then they would have passive provision ready for when Crossrail 2 opens. Deliberately avoiding making interchanges is verging on the ridiculous.
No it doesn't, but it will relieve the Victoria Line dramatically, that being the other reason given for no interchange (the assumption being that everyone from Clapham Junction, Battersea and Nine Elms would just pile onto the Victoria Line at Vauxhall).Crossrail 2 doesn't propose a Vauxhall station?
Huh? The Victoria Line has been funded for ~50 years nowAnd spending money on a station to connect with another line that has not yet got funding *instead of a station elsewhere that people will use* seems rather odd, too.
...and I still maintain that that's not a good enough reason. They should have routed via Vauxhall, built the platform tunnels during construction, and then they would have passive provision ready for when Crossrail 2 opens. Deliberately avoiding making interchanges is verging on the ridiculous.
What's the point in routing it via Vauxhall when you'd have to shut the interchange in leak due to overcrowding? Same reason why Crossrail doesn't link to Oxford Circus is simple fact that the cheap Victoria Line platforms are too small to handle the traffic. Additional interchange will increase this beyond today's levels to make it unsafe.
What you maintain is fine but officials have the figures that means they don't believe it's a good idea to have it. Unless you want to rebuild the whole station, something there is unlikely to be the money for.