northwichcat
Veteran Member
I'd like to see it wired, don't get me wrong. But you do raise an interesting point about diversionary routes - I see a few lines recommended for electrification because of their diversionary use - even ones with no regular passenger use (like Castleford - York) - how do you do the trade off though?
#toughdecision
I think with a privatised railway the importance of wiring diversionary routes partly depend on the franchise and rolling stock organisation.
Imagine in 2020 we have a TPE franchise that have all electric stock and run the following routes:
* Manchester Airport and Liverpool to Scotland.
* Liverpool to Newcastle via Chat Moss (1/2 hourly)
* Manchester Airport to York (1/2 hourly)
* Manchester to Leeds semi-fast (1/2 hourly)
* Manchester Airport to Blackpool (and maybe Liverpool to Blackpool)
That would cause problems every time a route is closed as it wouldn't allow diversions via Warrington, Halifax, Wakefield etc. and would likely see the operator being like Virgin are at present and insisting on having some DMUs or DEMUs to use on fully electrified routes to ensure they are covered when lines are closed.
If on the other hand services like Calder Vale form part of the same franchise then there's more flexibility for the operator to cover line closures.