RAGNARØKR;1268344 said:Electrification west of Exeter will have to contend with this at Dawlish at high tide when the wind is from the south-east. Video
The Ham said:The spare portion then sits in Plymouth for a few minutes while the train from Cornwall comes and joins it
Goatboy said:How do you turn around a unit like that in a few minutes? Presumably by not bothering to clean it after it's journey down from London?
JamesRowden said:My idea for the service pattern (all day):
1tph Paddington-Exeter (semi-fast) (IEP)
1tph Paddington-Plymouth(Train splits)-Penzance (Fast) (222)
Present Journey Times
Paddington-Penzance (5h05m-5h36m)
Plymouth-Penzance (1h56m-2h00m)
Required Stock (in service at peak)
I think that the average of 24-55 minutes (plus any time saved through automatic doors and greater acceleration [when compared to HSTs] minus time taken to split/join sets at Plymouth) to be spent at a terminus might be just enough to clean the train and maintain robustness of the timetable. This would mean that there would be 12 trains at any time operating this service. The present journey time between Plymouth and Penzance of exactly or just under 2 hours fits splitting trains at Plymouth perfectly.
Indeed, you can fly on a business-class only service to New York JFK from City Airport. Although as the plane can't carry enough fuel for the journey and take off (due to the short runway and steep climb), it has to stop at Shannon to refuel.[*] (Travelling the other way, it can fly non-stop.)
[*] With the added advantage that passengers can clear US customs & immigration during the refuelling stop.
If I remind you of my (first) service pattern idea for the 222s (and the IEP semi-fast):
The time spent by the unit at Penzance (and subsequntly Plymouth due to the journey between them being about 2 hours) could be engineered to work well. Based on the timings of the HSTs, an average of 24-55 minutes dwell at Plymouth/Penzance and Paddington is necesary (if 12 trains operate the route). The dwell time could be set as 30 minutes at Plymouth (and Penzance). This would mean that the country-bound service would leave the set at the platform that it stops at and then 30 minutes later the London-bound service would stop at the same platform, join with the set in the platform, and leave for London 30 minutes before the next countrybound service would arrive.
Also my second idea of 2 tph (222s) between Plymouth and Paddington which does not involve splitting produced slightly more capacity than my first.
How do you turn around a unit like that in a few minutes? Presumably by not bothering to clean it after it's journey down from London?
[*] With the added advantage that passengers can clear US customs & immigration during the refuelling stop.
Exeter has the better Wetherspoons, certainly the larger oneI might not be able to talk about airports or the preferences of global busineses, but on the subject of Wetherspoons, I can be relied upon to be pretty definitive.
![]()
The Torbay trains connect with trains to Plymouth, quite a lot of the reason for not having direct trains from Torbay to Plymouth is that it would require a reversal at Newton Abbot and would miss out Teignmouth and Dawlish, makes more sense to run them from Paignton to Exmouth and return instead with decent connections at Newton Abbot for stations to Penzance, which is exactly what we currently have. Having to change trains with a 5-10 minute connection on a local trip from Plymouth to Torquay is no big deal and to the passenger feels nothing like the idea of not having as many direct trains to London...
Exactly - my point is not that Plymouth should get wires, its that if it's decided that it shouldn't then frankly there is no point wiring from Reading to Westbury. That section of line either needs to be done completely (Well, as far as Plymouth) or not at all. Not at all (or 'not in the near future') would seem like the best choice economically
London City Airport is capable of hosting international jet powered flights and is not limited only to turboprops to other parts of the UKIt would soon lose all it's passengers if it was!
Once you have gone as far as Plymouth or Exeter, it can't be that expensive to push for Penzance and eliminate an island of diesel services.
Speeds are low, power requirements are correspondingly low and there are plenty of grid taps available along the route.
You're probably talking about seventy five miles, plus you'd need to do roughly fifteen miles to Newquay too (or cut the popular summer weekend trains from further afield). And what about the other branches?
But if you are going to wire up around a hundred miles of track then there are surely a lot of places elsewhere in the UK with much more frequent diesel services that could be "saved" with that amount of electrification?
Is wiring roughly a hundred miles of Cornish railway better than wiring the same amount of DMU lines around Manchester/ Leeds (say the Harrogate loop, the Southport line and the Warrington Central route)? You could maybe do the Fife Circle and the Stirling triangle? Or Uckfield, Marshlink and the North Downs?
All about the opportunity cost.
Yeah that's the one. It's got a "St Pancras trainshed" sort of a feel to it.The one with the massive window? One of the best that one - none of the Plymouth ones come close

I don't think that the difference in conditions between Dawlish and Saltcoats is that marked that what works for one location wouldn't work for the other. The wires and catenary at Saltcoats still gets a damn good soaking in salt water:You have not seen the pictures/videos of the railway line at Saltcoats then?
Where the waves break over the OLE.
Googling a couple of images suggests that they have installed some sort of continuous covering within the four foot, with ballast still used in the cess and the six foot. I wonder whether it is a form of slab track, or just some sort of protective covering in an attempt to stop ballast being washed out from between the sleepers?Also that video of the Dawlish Sea Wall makes the track look odd? Have they switched to some sort of slab track there?
Is wiring roughly a hundred miles of Cornish railway better than wiring the same amount of DMU lines around Manchester/ Leeds (say the Harrogate loop, the Southport line and the Warrington Central route)? You could maybe do the Fife Circle and the Stirling triangle? Or Uckfield, Marshlink and the North Downs?
All about the opportunity cost.
You're probably talking about seventy five miles, plus you'd need to do roughly fifteen miles to Newquay too (or cut the popular summer weekend trains from further afield). And what about the other branches?
But if you are going to wire up around a hundred miles of track then there are surely a lot of places elsewhere in the UK with much more frequent diesel services that could be "saved" with that amount of electrification?
Is wiring roughly a hundred miles of Cornish railway better than wiring the same amount of DMU lines around Manchester/ Leeds (say the Harrogate loop, the Southport line and the Warrington Central route)? You could maybe do the Fife Circle and the Stirling triangle? Or Uckfield, Marshlink and the North Downs?
All about the opportunity cost.
That's not really a fair choice. In fact, it's closer to the same mistake BR made by not doing the Aberdeen Road when they did the ECML. Worse in fact, because they didn't end up with an hourly diesel service doing 200-odd miles under the wires. Not only does it make poor operational sense, NR come out of it looking silly. Note that I'd also do St Ives, Falmouth, Looe and Gunnislake/Tavistock and all the ones you've suggested.
With Swansea is that there were already a significant number of services terminating at Cardiff and these would have gone over to EMU operation with bi-mode only needed for the 1 tph to Swansea. If you electrify all the gaps in the main XC network east of Exeter and also Newbury to Cogload Junction, you are not going to get many services going over to EMU operation unless you change the service pattern to have a lot more services terminting at Exeter than currently.But people in Plymouth complaining about electrification "only" to Exeter is a bit like the howls of protest in Swansea about the initial plan to "only" electrify as far as Cardiff - even though Plymouth/ Swansea would be no worse off under such a plan, people can't stand the idea of the place along the line getting an improvement that "we" aren't getting.
If the 222s could tilt, that might be a massive improvement. Expensive, of course, but tilt would take lumps out of journey times along there.
But people in Plymouth complaining about electrification "only" to Exeter is a bit like the howls of protest in Swansea about the initial plan to "only" electrify as far as Cardiff - even though Plymouth/ Swansea would be no worse off under such a plan, people can't stand the idea of the place along the line getting an improvement that "we" aren't getting.
It looks like a realistic choice to me - whilst some areas are easier/cheaper to electrify than others, there's only a finite budget, and wiring up one line comes at the opportunity cost of doing a roughly similar length elsewhere.
Spend the money elsewhere and use diesels to Devon and Cornwall.
Does it?
Surely continuing electrification for seventy miles beyond the previous existing project is easier than doing seventy miles somewhere else, for one thing you can likely use the same depots as established for the existing project, rather than having to use new ones.
You can also use the same engineering team without having to pay hardship for relocation, and you can carry on immediately rather than having to pack everything up and move the equipment to the new worksite
There are going to be plenty of electrification projects around the UK in CP5 - I could easily come up with a list of alternative extensions that require about seventy miles of electrification (if you only want seventy, I presume you would run diesels to Newquay or cut the summer tourist trains there?).
Think what an extra seventy miles could bring you in/ around Yorkshire, Lancashire, West Midlands etc - that's the opportunity cost of wiring seventy miles to Penzance for the sake of a roughly hourly service.
It's not the same thing at all - my arguement all along isn't that 'waaa, Plymouth should get wires'. Infact, I think wires to Plymouth is quite correctly a low priority. There are more important places to spend the money. But in thinking this I think exactly the same about wires to Exeter. There is no point in doing Exeter and not Plymouth, so frankly neither should be high up the priority list.
Especially given the issues I've highlighted throughout this thread about the knock-on effects of a further perceived marginalisation of the West of Exeter from the transport network. It's more hassle than its worth to upgrade to Exeter.
Spend the money elsewhere and use diesels to Devon and Cornwall.
It's surely going to be a while yet until electrifying the link between Birmingham and Bristol via Cheltenham is on the agenda? Even if that is done, as well as the "missing links" between Doncaster and Birmingham following MML electrification, you could just re-jig the Crosscountry service: Run Edinburgh to Bristol with electric stock, and have a diesel Manchester to Penzance service: 170 miles under the wires compared to 207 miles without them.If you don't go to Plymouth the XC trains are stuck running under diesel power all the way from Glasgow (potentially).
Electrify from Bristol to Plymouth and leave the B&H to rust away with local trains only.
You'd have to knock at least 25 minutes off the journey time to make the journey time from Paddington to Exeter, Plymouth and Penzance via Bristol comparable with the time via the Berks & Hants. I'm not convinced that electrification alone (of what is already a 125mph route) can deliver that.
Let alone capacity issues...
125 mph between Bristol and Bridgwater is also proposed.
Given the curvy nature of the B&H better acceleration would have a significant effect on journey times there too...