CockneySparrow
Member
Looks like Shippea Hill, Lakenheath, Brandon and Thetford boxes are going to be demolished this weekend :cry:
Looks like Shippea Hill, Lakenheath, Brandon and Thetford boxes are going to be demolished this weekend :cry:
Once all the stuff on the ground is installed the actual transition period can be very quick. But yes, demolished is probably the wrong word. Decommissioned is probably better.
It is my understanding that the commissioning works for the new infrastructure on the western section of the line involving Shippea Hill - Thetford boxes is scheduled for today. I hope that all is going to plan.
To have even considered demolition today would have provided an unnecessary (my opinion) distraction.
But not necessarily in Network Rail's view. The boxes on the North Warwickshire Line went in the blink of an eye, pretty much as soon as the interlockings and levers were removed in October 2010. The closure of the line to trains was a distinct advantage for the contractors demolishing Henley-in-Arden, see http://www.petertandy.co.uk/North Warwickshire Line/Henley_Demolition.jpg and the same would apply, due to proximity of the tracks, to those being decommissioned today.
Network Rail does not like leaving empty vandal magnets standing around if if can help it.
Please correct me if I am wrong. Isn't this the same signalling earmarked for GN/GE Joint Line upgrade.:roll:
All appears to have gone to plan except Croxton AHBs (Thetford-Harling Road) will have to remain on 'local' control for the rest of today. Some delays as a result.
thought they have only done the Ely to Thetford stretch so far, if that's the case what's the barriers between Thetford and Harling Road got to do with it
The section between Thetford and Harling is now controlled by Cambridge. They supervise Croxton AHB which was previously supervised by Thetford SB.
Not at the moment they don't, hence why it is being manned. One of a number of issues that have come to light since the start of service today.
There is no hiding from the fact that a certain infrastructure company is an absolute shower and shouldn't fix things that aren't broken...
The boxes are still there but decommissioned. There are issues with the level crossings and a few other bits. Cambridge now control Ely-Thetford with Harling Road as the fringe box.
If its not broke sure as hell smash it lol
--- old post above --- --- new post below ---
One would have thought NR would have either kept the boxes in service until they were 100% certain the barriers were working, or the second option would have been to run a few trains along the line Sunday 19th under Cambridge PSB, that way they would have found the issues earlier
--- old post above --- --- new post below ---
Do you know when the boxes are dissappearing
More problems/delays last night/this morning with a signal showing
blank due to a design fault.
GB said:...and now a poor old driver has a cat A spad on his record becuase of it.
The signal was showing black due to a design fault (wired as a three aspect signal but it is infact a two aspect signal) with the preceding signal showing single yellow and as such it is stated the driver should have been expecting to stop at the signal.
Bit harsh IMO.
Not at all, its still perfectly safe.