WatcherZero
Established Member
- Joined
- 25 Feb 2010
- Messages
- 10,272
I believe he was correcting the three "theirs" in the precious post.
'Previous'
I believe he was correcting the three "theirs" in the precious post.
Hey I was only explaining to Paul what was going on! :-/
travelling to Manairport/EGCC will be faster by bus, as it is to Eccles from city centre, and you get a seat. I loath yellow M5000 trams.
Getting to the final destination as fast as possible is not the point of metrolink!
Getting to the final destination as fast as possible is not the point of metrolink!
ludicrous
what is the point of it then?
to get you there slower than could be done 20 years ago?
There are some forum members (very much against the idea of anything but heavy rail) who tend to make this point constantly, as a means to ridicule the Manchester Metrolink and also TfGM/GMCA (for their approval of this method of urban travel).
ludicrous
what is the point of it then?
to get you there slower than could be done 20 years ago?
Have you ever considered that there are places people might want to get to between Eccles and Manchester City Centre? Same with the city centre and the airport.
The Eccles line is really for connecting the city to Salford Quays which was and still is poorly served by other modes. Extending the line to Eccles was perfectly logical.
The purpose of the airport line is to connect various districts of South Manchester that are geographically isolated. Since the airport is a massive employer in the area it makes sense for trams to serve it.
I realise that many members of this site can hardly contain their anti-tram bais, but please come up with better reasons why trams are bad next time.
Another reason is spare capacity at the Manchester stations is zero. Moving the Alty, Bury and Rochdale lines has put off the need for expensive improvements in the city centre though travelling to Manairport/EGCC will be faster by bus, as it is to Eccles from city centre, and you get a seat. I loath yellow M5000 trams.
Getting to the final destination as fast as possible is not the point of metrolink!
ludicrous
what is the point of it then?
to get you there slower than could be done 20 years ago?
The tram from Meadowhall to Sheffield City Centre is around double the time of the train service, but the tram is still very busy because it serves places in between. It also covers the city centre much better than the trains do (which is equally true of the Manchester example - it may be faster from Eccles into the city centre by train but not everyone's final destination is Victoria/ Piccadilly Station).
Post-It Notes?those yellow critters everywhere-stationery
Have you ever considered that there are places people might want to get to between Eccles and Manchester City Centre? Same with the city centre and the airport.
The Eccles line is really for connecting the city to Salford Quays which was and still is poorly served by other modes. Extending the line to Eccles was perfectly logical.
The purpose of the airport line is to connect various districts of South Manchester that are geographically isolated. Since the airport is a massive employer in the area it makes sense for trams to serve it.
I realise that many members of this site can hardly contain their anti-tram bais, but please come up with better reasons why trams are bad next time.
Light rail should be in addition to heavy rail not a replacement for it (unsuitable for Altrincham line)
90% of passengers on the Altrincham line travel into central Manchester - and their journeys are now slower and more unreliable than they were 20 years ago
The Altrincham line has always been a commuter route for Manchester - I understand what you say about the Eccles and Airport routes - but this is not the case with Altrincham and I presume Bury
Light rail should be in addition to heavy rail not a replacement for it (unsuitable for Altrincham line)
Very true. It should serve where heavy rail can't feasibly reach - Salford Quays, and places like Didsbury and Ashton via the suburbs; indeed, anything like the Sheffield and Nottingham networks. Unless there are serious problems or substantial benefits then I don't think converting heavy rail is correct.
Do you have evidence for this?90% of passengers on the Altrincham line travel into central Manchester
the problems with TfGM trams is complex; properly designed bus lanes would are suffice, they are cheaper, flexible, quicker off the drawing board (CAD), and competitive. Runcorn is doing alright
TfGM trams are small, few seats, expensive and are relatively slow esp if your commute is let's say Shaw-Manchester, besides in 4 years time Manchester will be a bottle neck with those yellow critters everywhere-stationery, and the tracks will have to be replaced sometime. Oxford Rd station and Victoria station will be as well. The main object is to move people as quickly and cheaply as possible, so in every respect these trams are failures, except on the Altrincham and Bury Lines, and that is why Stagecoach opted out. The old green ones are really very good. I bet that the No 19 bus from Sale to Manchester Airport, and Tenerife! will be faster than one of those yellow critters.
Are journey times really that much slower than in 1991? It takes me about 15 minutes to get from Sale to St Peters square which is closer to my final destination than Oxford Road or Piccadilly and certainly not slow.
How many of those would prefer to walk/bus from Oxford Road or Piccadilly instead of using the tram directly to St Peters Sq, Piccadilly Gardens, Market St, Shudehill or Victoria?
As for the opition trams are slower. How far was the Oldham loop with pacers?
Sometimes they have to change trams when Metrolink decides to terminate a southbound service short at Timperley so passengers for Altrincham don't always get a direct tram service.
My 1 October 1990 Network NorthWest timetable book has the following pattern
Manchester Victoria xx45 xx15
Miles Platting xx48 xx18
Dean Lane xx52 xx22
Failsworth xx55 xx25
Hollinwood xx58 xx28
Oldham Werneth xx02 xx32
Oldham Mumps xx06 xx36
so it used to take 21 minutes all stops, including the now closed Miles Platting. Obviously the half hourly expresses until 2009 were much quicker.
Something's I'm sure BR terminate a train as well, so why add this?
Note to other readers: This means there are more trams than there were trains.Metrolink do it on a fairly regular basis not on a sometimes basis. If there's a southbound tram that's been caught up by a following tram the first one will almost certainly be terminated short at Timperley.
BR weren't trying to send everything to the same platforms at Navigation Road and Altrincham so congestion was less of a problem.
Thanks very much so tram won't be that much slow with extra stops.
Note to other readers: This means there are more trams than there were trains.
PS You haven't answered my original question.