While out walking today I passed Yorton station and noted that the northbound platform is temporarily closed, which made me wonder what is being done to assist passengers during the closure period.

By way of background, Yorton is a lightly used station in Shropshire, sufficiently so that all trains are request only. For a period of over a month (18 Nov to 20 Dec) the northbound platform is closed for the purpose of installing a more "accessible" platform. Trains run (roughly) every two hours between 05.37 and 00.20, and catering for passengers is by providing a replacement coach between Yorton and Wem. Northbound passengers joining at Yorton are directed to use the coach to Wem and join the train there, while alighting passengers need to travel through to Wem, and then board the coach back to Yorton. A couple of things about this situation seem a little troubling, and I wonder if anyone could shed any light on them?

1. This is now the end of Day 10 since the work started, but so far as I can see there is no reason why the platform couldn't have stayed in use for the last 10 days. The photo shows the platform at 4.00pm today, I wonder what is the reason why its needed to be out of use for the last 10 days?

2. I don't know what is the cost of hiring a coach for a day to cover the period of at least 19 hours a day, but if the platform could have been used for the last 10 days, that must be a sizeable unnecessary outlay?

3. Unless I missed something, I couldn't see anything at the station telling passengers that the coach to Wem departs 15 minutes earlier than the train they might have been wanting to catch. This could potentially be very inconvenient for anyone who just misses the replacement coach, especially if they had taken the trouble to look at the available information at the station a day or two earlier.


20241126_153806.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

6Gman

Established Member
Joined
1 May 2012
Messages
9,183
1. This is now the end of Day 10 since the work started, but so far as I can see there is no reason why the platform couldn't have stayed in use for the last 10 days. The photo shows the platform at 4.00pm today, I wonder what is the reason why its needed to be out of use for the last 10 days?


View attachment 170050
I would suspect this is a case of the contractor specifying he needs x days for the work with a substantial contingency for delays or other work. It seems to be a frequent habit among such contractors.
 

alistairlees

Established Member
Joined
29 Dec 2016
Messages
4,379
Perhaps a case of the specifier loading the contract with many punitive clauses for late delivery. It seems to be a frequent habit among such specifiers.
 

Shrop

Established Member
Joined
6 Aug 2019
Messages
1,350
Yes, I can see that contract specifications are likely to come into play, but even for a minibus we're likely to be talking of around £50 per hour, or close to £1000 for a full day. Please correct me if I've overestimated this.
If the contract had been written with sufficient flexibility that trains could have continued to stop until such time as the work actually made it hazardous to do so, then it appears that £10,000 could have been saved on that cost already. For a request stop station that seems a lot to squander unnecessarily in just 10 days, so could this not have been managed better?
 