185
On Moderation
- Joined
- 29 Aug 2010
- Messages
- 5,709
Hello. Can't see any relevent open threads for this.
Anyone know how CrossCountry have gotten away with running a half hourly daytime service Birmingham to Manchester until 6pm, then a huge, two hour gap in service?
Is this temporary or was the ordinary winter XC timetable supposed to have this huge gap between the 1801 & 2001?
Cheers.
Anyone know how CrossCountry have gotten away with running a half hourly daytime service Birmingham to Manchester until 6pm, then a huge, two hour gap in service?
Is this temporary or was the ordinary winter XC timetable supposed to have this huge gap between the 1801 & 2001?
Cheers.