Vectorspace
Member
- Joined
- 8 Mar 2011
- Messages
- 32
The 16:33 XC from New Street to Southampton Central was delayed just outside Dorridge today for 25 minutes.
We were told it was due to an emergency on a following train, which then overtook us - it was a Chiltern 168.
We were then overtaken by a container freight hauled by a pair of 66s before we moved off, and then proceeded very slowly to Leamington (because of the freight train).
When I got off at Leamington, the train manager announced that he still had not been given a reason why we were held for the Chiltern train (no mention of the freight)
Does anyone know what was going on on that Chiltern train, and why they let the freight train overtake us too? I can't think of any situation that would require us to be held that long, when an XC Voyager is faster than a Chiltern 128 train anyway - even a medical emergency could have been dealt with by stopping at any earlier station.
P.S. The icing on the cake was the signal failure between Warwick and Leamington, which got the freight train stuck first.
We were told it was due to an emergency on a following train, which then overtook us - it was a Chiltern 168.
We were then overtaken by a container freight hauled by a pair of 66s before we moved off, and then proceeded very slowly to Leamington (because of the freight train).
When I got off at Leamington, the train manager announced that he still had not been given a reason why we were held for the Chiltern train (no mention of the freight)
Does anyone know what was going on on that Chiltern train, and why they let the freight train overtake us too? I can't think of any situation that would require us to be held that long, when an XC Voyager is faster than a Chiltern 128 train anyway - even a medical emergency could have been dealt with by stopping at any earlier station.
P.S. The icing on the cake was the signal failure between Warwick and Leamington, which got the freight train stuck first.