KashmireHawker
Member
Unless it came from a demand by the Secretary of State, I imagine the chances are somewhere between 0 and 1%.I very much doubt that.
Unless it came from a demand by the Secretary of State, I imagine the chances are somewhere between 0 and 1%.I very much doubt that.
That assumption of extracted revenue, rather than growing rail use and increasing overall revenue, is one even ORR didn't buy into.Much as we all loved the original Wrexham and Shropshire service, it is gone and this proposal was and always ahs been utter madness. It was never going to be approved, nor should it have been. Extending even 1 or 2 trains Avanti a day to Shrewsbury also makes no sense and is a poor use of scarce resources. Its a simple 1 change service now which is perfectly adequate. The proposed service was only ever viable using extracted revenue.
The taxpayer is not being asked to pay for the new service, the existing service will continue to cost the same to operate, just it will have different opportunities to attract fare revenue.Why should the taxpayer pay extra for this service to succeed when its just not needed. As someone said, Crewe is often the quickest way and so improve connections there, which are not great, give or take a few tight connections.
Worth pointing out, and I freely admit i'm not sure if it's just Lumo (ECML), but my understanding was that new OAOs paid a higher track access fee, to more faily cover access and maintenance of the line... as I say, I'm not sure if it's just the ECML Lumo service that this applies to... but I know it was mentioned either in the press or to do with a track access request to the ORR.That assumption of extracted revenue, rather than growing rail use and increasing overall revenue, is one even ORR didn't buy into.
Open access is about 0.5% of fare revenue, if introduce new route will hopefully gain some new customers. Yes some might switch, but that frees up seats elsewhere which if existing operators yield management is working will then fill those vacated seats.
The taxpayer is not being asked to pay for the new service, the existing service will continue to cost the same to operate, just it will have different opportunities to attract fare revenue.
That assumption of extracted revenue, rather than growing rail use and increasing overall revenue, is one even ORR didn't buy into.
The taxpayer is not being asked to pay for the new service
I believe an 805 went to Shrewsbury Once... I'll see if i can find the photoAvanti actually have the 805s for the route, as the fleet was ordered when Shrewsbury had a through service with 221s.
However, the DfT will have instructed Avanti (during Covid) to cut the Shrewsbury extension off to save money, and that stance hasn't changed.
I wouldn't put it past DfT to reinstate the service once Avanti is gone next year.
It's still often quicker changing at Crewe, anyway (thanks to TfW).
It’s normally policy to clear them for all possible routes. We even tested 745s here in East Anglia on the Southend Victoria branch although there is next to no chance of using them on it.I believe an 805 went to Shrewsbury Once... I'll see if i can find the photo
A spokesperson for WSMR said it was "disappointed" by the decision, "especially after the effort we've made to overcome the concerns raised by statutory consultees over the past two-and-a-half years".
"Improving connectivity is a driver of economic growth and productivity, and WSMR would have unlocked much-needed educational, leisure and work opportunities for communities between north Wales, Midlands and London corridor.
"Since our application was submitted in March 2024, we have received overwhelming backing from local people, businesses, councillors and MPs, who all recognise the urgent need for this improved connectivity. We are very grateful for this support."
HS2 will open up capacity on the southern WCML but under current plans, not the northern WCML though.HS2 isn't the saviour here, either, just because it might free up some space when it opens (physically and logistically) doesn't mean every bid on the WCML will suddenly become available!
I was going to ask that but assumed I'd missed the obvious flaw. Rolling stock aside of course.Surely an extension of a few Birmingham semi fasts a day might work?
Would running via Bescot be enough to avoid capacity issues, or is there too much going that way, through Wolverhampton and (especially pre-Midlands Rail Hub completion) New Street unless avoiding there?HS2 will open up capacity on the southern WCML but under current plans, not the northern WCML though.
First of all, the goal should be to make the rail network less London-centric, not more so. If a place is not at (or on the way to) a convenient point to terminate trains from London, then most of the time a well-timed connection with a train that does make sense to run through to London is the better solution.I agree, even if it is immensely disappointing.
The fact in 2026, a whole county can’t have a single direct rail service down to the nation’s capital, should be a source of the most immense shame and absurdity for all those bods sitting in swanky offices in Whitehall.
Let’s see if Avanti coming into public ownership or future timetable reconstructions as suggested in the letter by the ORR makes any difference.
I am sadly not holding my breath…
What an odd comment.First of all, the goal should be to make the rail network less London-centric, not more so.
Indeed. We have a London centric network because the UK is a highly centralised country centred on London.What an odd comment.
By “less London-centric”, presumably you mean that people’s journeys to where they actually want to go (ie London) are harder, but making journeys to other major cities easier?
Making the rest of the country better-off does not mean we need to disadvantage rail links into London.
They don't exist. Under the current (and next) timetable, every Wolverhampton to Euston service after 07:00 starts at Crewe or further north, and the same goes for every Euston to Wolverhampton service arriving before 20:00.then I'm fairly confident that the Avanti service terminating at Wolves every hour
That's not what's meant by London-centric. I'm specifically thinking of the many journeys avoiding London, most of which are currently made by car, that require a long and expensive detour via London to be done by rail at the moment. The few operators that do provide this service (XC, EMR, TPE) are ridiculously low on capacity.By “less London-centric”, presumably you mean that people’s journeys to where they actually want to go (ie London) are harder, but making journeys to other major cities easier?
A frequent 1-change option is always going to be a better use of capacity than 4 trains a day to the end of every branch line. With a decent quality transfer at a station (accessible and reliable) the only downside is just a feeling of minor inconvenience, though I suspect it's less convenient when one of the 4 direct trains get cancelled (fully or in part) with there being no convenient alternative.Making the rest of the country better-off does not mean we need to disadvantage rail links into London.
Well then I guess it wouldn't work as well, though London-Scotland via Birmingham services don't have much through travel anyway so reworking it into 2 services (London-Shrewsbury and Birmingham-Scotland) wouldn't be that unpopular, even if it does require HS2 phase 1 to get the paths required for it. Good thing there's a 15-20 minute same platform transfer at International then.They don't exist. Under the current (and next) timetable, every Wolverhampton to Euston service after 07:00 starts at Crewe or further north, and the same goes for every Euston to Wolverhampton service arriving before 20:00.
The direct services from London to Wolverhampton are slower than a change at Stafford although the latter is often more expensive.They don't exist. Under the current (and next) timetable, every Wolverhampton to Euston service after 07:00 starts at Crewe or further north, and the same goes for every Euston to Wolverhampton service arriving before 20:00.
16.Network Rail stated that it currently did not support any application seeking to use additional capacity on the WCML South fast lines. All the proposed paths had conflicts against the base timetable, which Network Rail stated would have significant impacts on other services and service patterns across the geography.
17.Network Rail expressed particular concern that WSMR’s plans would use firebreak paths and could be accommodated only with significant retiming of other services in the same area. Other concerns Network Rail cited related to adverse impacts on network performance, on overall network resilience and services, on punctuality and reliability across the affected routes, and on congestion issues at key junctions and high utilisation areas of the network.
There is also a list of oppositions to WSMR's proposals:31. In June 2026 WSMR provided additional evidence it had commissioned. We have considered this carefully for consistency with the report we commissioned externally. Our view is that the WSMR report does not demonstrate the proposed WSMR timetable can be robustly accommodated within the existing timetable structure. Our external report reinforces our concern that using the WSMR proposed paths would further increase risks to resilience and performance unless the wider timetable is reviewed and rolling stock assumptions are resolved.
32. The WSMR evidence submission proposed that additional capacity exists on WCML and describes that an alternative timetable is possible to create further available capacity. A significant timetable recast is being considered by industry on the WCML, but it is not sufficiently progressed for anyone to reach conclusions as to whether it might unlock additional capacity.
33. We consider a timetable may theoretically be constructed for WSMR’s services. However, in applying our duties, we need to consider whether the application is Page 7 of 12 implementable, compliant with industry rules, resilient within the current structure, and acceptable for existing users under both normal and disrupted conditions. Our external commissioned analysis on the WCML South supports our assessment that the route is already highly constrained by the current timetable structure, and this is consistent with the evidence Network Rail provided and assessments of current performance on WCML. Therefore, we consider that WSMR could not be accommodated at present without a substantial detriment to users of the line.
London TravelWatch's concerns are also mentioned under the appendix for Lumo's application.• London TravelWatch expressed concern with the proposals, particularly Concerned about Euston capacity and congestion and how station capacity will be managed.
• Transport for Wales (TfW) expressed concerns about capacity, revenue abstraction, stabling and maintenance of rolling stock, and staffing.
• West Midlands Trains (WMT) did not support based on concerns about performance, fleet maintenance, revenue abstraction, SRTs and dwell time, and timetable validation.
• CrossCountry Trains (XCT) did not support because of concerns about performance and the vagueness of timetabling information provided.
• AWC firmly opposed the proposal because it assumes that there will be a greater amount of capacity available than is the case. It also cites HS2 implications and concerns over viability of the assumed paths in the application.
WSMR objected to the proposals and particularly argued that its own proposals should be accommodated instead. WSMR objected on grounds of capacity, performance and power supply, and argued that decisions should be considered on the best use of capacity in a wider social/economic sense. WSMR viewed that AWC’s proposals should not be given preferential treatment by Network Rail.
More expensive just looking at Avanti? Without checking, I'd still expect LNR Stafford to London tickets to be more than Wolverhampton to Euston due to flexible ones being valid via Wolverhampton, but not much more.The direct services from London to Wolverhampton are slower than a change at Stafford although the latter is often more expensive.
A point I think I've made before is that a service reversing at Crewe might work better for Shrewsbury in theory, but we're not in that constraint-free world. There's also three London journeys from Wellington and Telford for every five from Shrewsbury, which wouldn't be well-served via Crewe.Unsurprising then that railheading at Stafford is a popular option, and a useful pointer to as why through services via the West Midlands failed - Repeatedly.
How feasible would a Shrewsbury-intermediate stops-Oxley Chord-Stafford-Trent Valley-Euston be?The direct services from London to Wolverhampton are slower than a change at Stafford although the latter is often more expensive.
Unsurprising then that railheading at Stafford is a popular option, and a useful pointer to as why through services via the West Midlands failed - Repeatedly.
Virgin (I think?) proposed that. Wasn’t it also to combine with another service at Stafford?How feasible would a Shrewsbury-intermediate stops-Oxley Chord-Stafford-Trent Valley-Euston be?
The trundle around Oxley chord and the reversal at Stafford would hurt it.How feasible would a Shrewsbury-intermediate stops-Oxley Chord-Stafford-Trent Valley-Euston be?
It's a shame that the Wellington - Stafford line no longer exists as that would have provided a direct route from Shrewsbury and Telford (the town not Central station pre se) that would avoid the West Midlands conurbation and the need to reverse at either Stafford or CreweVirgin (I think?) proposed that. Wasn’t it also to combine with another service at Stafford?
Rejected for performance reasons I think?