Given that from HS2 where it exits the chiltern AONB to Didcot Parkway is under 50 Km it would make sense to just build a short spur to West of Didcot Parkway by passing all the capacity constraints on the GWML at a much lower cost.
You could build the new trainshed wirh a flat "green" roof, laying the, erm, topsoil back on top ....It is not the first time that a cemetery has been moved to enable a railway line to be built.
Not at all. If you terminate the long trains at Old Oak Common, you don't have to touch Euston at all. That's £2bn saved on the station and £1.6bn saved on the tunnel from OOC to Euston already.
And you don't have to build HS2 phase 1 or phase 2A either![]()
Build a surface station at Old Oak Common, connected to the WCML fast lines, with 10 x 795m platforms. Include platforms to the Elizabeth Line (perhaps two EL stations close together to save walking).
I understand HS2 OOC is being constructed in an 800m box for £1.7bn, and you're always saying (e.g. HS2 Piccadilly) that stations below ground cost far more than stations at the surface. Your £10bn is 6 times that, so I'd be interested to see where your figure comes from?That station group looks like it’s going to be costing the thick end of £10bn
Sure. There's no need to add a capacity on the WCML now that HS2 is being built. I just had the diagram and the numbers already in my head to show what could have been done instead.[HS2 is] being built now, so you don’t save anything
I understand HS2 OOC is being constructed in an 800m box for £1.7bn, and you're always saying (e.g. HS2 Piccadilly) that stations below ground cost far more than stations at the surface. Your £10bn is 6 times that, so I'd be interested to see where your figure comes from?
I thought there was a cemetery being moved for HS2?No, but has there been a recent case of an active cemetery being removed?
I thought there was a cemetery being moved for HS2?
Here's what I would do, but some of it probably isn't necessary if I'm honest. New alignment from London to Reading and maybe Didcot East, with an dive-under/flyover at Didcot East leading to a new pair of fast tracks added to the Didcot-Oxford line which would be used by GWR fast and Cross-Country services. Possibly build a branch to Newbury to provide a frequent local service to the smaller stations while the fasts take the new line. Or you could 4 track Reading-Newbury, as well as include the short line to bypass the 70mph restriction just after Bedwyn. Would the Western Approach to Heathrow line be built as well? Maybe some services could run via Heathrow?Simple answer is no, but there are some short cutoffs aligned for high speed with flying junctions that would be useful. In some cases a third reversible centre track might be cheaper solution.
1) Old Oak to Heathrow airport junction (to allow semi fast trains to use busy current tracks)
2) Didcot to Swindon West, there was some 4 tracking at either end and near Challow, but really needs a third track throughout
3) Near Marlborough and Savernake, where all sorts of branches used to exist and the main line is very slow and curvy having been bodged out of local lines
Realigning the GWML is entirely infeasible, the entire line is effectively surrounded by towns that have sprung up thanks to the line, realigning it, unless you’re planning of sending the entire thing underground, would not be financially possible, and would cause huge economic damageNew alignment from London to Reading and maybe Didcot East,
What I'm suggesting is a new line. The sections that probably need capacity relief are London-Reading, Didcot-Oxford and possibly Reading-Newbury. Didcot-Wootton Bassett could be a candidate for 4-trackingRealigning the GWML is entirely infeasible, the entire line is effectively surrounded by towns that have sprung up thanks to the line, realigning it, unless you’re planning of sending the entire thing underground, would not be financially possible, and would cause huge economic damage
Yeah, what I’m asking is where is the new line going? The area between Reading and London is heavily built up already.What I'm suggesting is a new line. The sections that probably need capacity relief are London-Reading,
100% tunnel I would imagine.Yeah, what I’m asking is where is the new line going? The area between Reading and London is heavily built up already.
London Paddington to Reading is 54 km as the crow flies, which is nearing world record levels anyways, not to mention the lack of any kind of hills meaning you have to tunnel down quite far as well, and the river and associated water table significantly complicating things.100% tunnel I would imagine.
It'll probably end up having a lot of tunnels like HS2. I mean, most of HS2 is in tunnel going out of London. I don't know how feasible adding 2 extra tracks between Old Oak Common and Heathrow Airport Junction would beYeah, what I’m asking is where is the new line going? The area between Reading and London is heavily built up already.
Removing such a major cemetery would never happen now, but it's the sort of thing the Brunels would have been happy to proposeThere was. The St James Cemetery at Euston.
To put it into context, this was a cemetery from the 18th and 19th century (last burial in 1853), occupied about 11,000 sq m of space, and took a couple of hundred archaeologists 3 years to carefully exhume the bodies contained therein, and re-inter them at Brookwood cemetery.
Kensal Green Cemetery, conversely, is still active and is almost 30 times larger. It also contains the remains of, amongst many other luminaries, IK Brunel, Marc Brunel, Phillip Hardwicke, and Joseph Locke.
I’ll leave it for others to ruminate on whether building what would be by far the biggest station in the country (and possibly the world?) there would be realistic.
I would think a tunnel from west of OOC to west of Airport Junction would be the simplest way. Possibly tunnelled to beyond Slough, with some additional semi-fast Crossrail services to there using the current fasts (maybe to Windsor) - but that might be too far. You could retain HEx easily if that was desirable - stick it onto Crossrail with an Ealing call maybe.What about converting the GW fasts to a 230kmh ERTMS operation between Paddington and Didcot, with 6 tracking to Airport Junction, as the capacity constraints mostly end there. 6 tracking doesn't look too difficult, though there may be problems around West Ealing and Ealing Broadway.
I certainly think either going via the major cities on the South Coast or via Oxford is preferable to a routing via Reading.When I've contemplated this in the past I've wondered if you skip Reading and run direct from London to (for example) Salisbury when you then split to serve Bristol/Cardiff, Southampton, and Exeter/Plymouth.
How much new track you need beyond that is open for debate, but probably not a load.
Swindon-Oxford-Old Oak Common is only 7-8km longer as the crow flies than Swindon-Reading-Old Oak Common. At 320km/h that is about 90 seconds worth.Going via Oxford if heading to Bristol and the SW seems nuts.
As for the SW, I would think that well-served from a fast new line to Reading and down to Basingstoke / Winchester etc - to fill up the paths - but it wouldn't be tons faster than a fast train from Waterloo.
I can't see that anywhere else would be worth the investment. Exeter being much quicker than today would need a huge investment. Cornwall would be great to have a quicker route in the summer, but highly seasonal.
That woulds be a very magical triangle.Well, not so seasonal anymore, but the chances of HSR to Exeter & beyond are ... small. Birmingham is actually nearer Exeter than London... anyone want to figure out the journey time for HSR to Brum ( presumably with a Bristol stop ) & then back down HS2?
Probably Tavistock if previous fantasy GW discussions are anything to go by…I just can't see where you'd send all these trains.
Exactly how many hills are you planning on either demolishing or tunnelling through for that? Both those lines would have to pretty much be tunnels the entire way, to call that expensive would be an understatement.New 125mph cross-country line to enable fast Cardiff/Bristol to Southampton/Portsmouth services. New 125mph Exeter - Penzance line. All electric of course.
It is highly likely that any new railway lines in the UK will be dominated by tunnel, with a handful of minor exceptions in those truly deep rural locations that are not national parks or AONBs or any other designation.Exactly how many hills are you planning on either demolishing or tunnelling through for that? Both those lines would have to pretty much be tunnels the entire way, to call that expensive would be an understatement.