BR might have done it, but it wouldn't be such a shambles. After all, at least some of BR's money would come from tickets and not just government handouts like NR. Last Saturday (23rd December), the only express service that wasn't delayed or failed was a short formed (5-coach) HST to Aberdeen, calling at Stevenage, Peterborough, Grantham, Newark and Doncaster before pulling into York! Usually, it's a straight run.
HS1 route as designed by BR would probably have never happened - there were huge protests against the proposed route and in the end at great risk to themselves Arup designed an alternative route which is the one that got built. Even then there was a lot of pressure for the service to terminate at Stratford to save the huge cost of getting into central London in the same was as some suggest HS2 should terminate at Old Oak Common