Would "2 trains on the same platform" work in the UK?

Status
Not open for further replies.

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,688
Tender has now been issued, for Manchester Airport station, appears intention is to be able to double stack 6x24m (144m trains) which suggests platforms close to 300m (985 feet) long

I am guessing making provision for two pairs of 6car 195s (do they actually have enough of these ?



P1 to 3 get extended to 300-310m.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

duffield

Established Member
Joined
31 Jul 2013
Messages
3,282
Location
East Midlands
P1 to 3 get extended to 300-310m.
Do we know whether the extensions would be at the buffer stop end or the opposite end? On the satellite photos both ends look somewhat constrained (buildings/roads and track convergence respectively).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,688
Do we know whether the extensions would be at the buffer stop end or the opposite end? On the satellite photos both ends look somewhat constrained (buildings/roads and track convergence respectively).
Country end.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Have any plans been published anywhere? Planning application?

I thought extending the throat required demolition of a small bridge connecting two airport car parks , so I'm surprised it has reached this stage without more info coming out about how it will be done.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,688
Have any plans been published anywhere? Planning application?

I thought extending the throat required demolition of a small bridge connecting two airport car parks , so I'm surprised it has reached this stage without more info coming out about how it will be done.
Its still at least 2-3 years away.
 

Marton

Member
Joined
9 Nov 2008
Messages
665
2 trains at one platform with different destinations is the only way that services can pass at Battersby.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,280
Location
Bolton
Tender has now been issued, for Manchester Airport station, appears intention is to be able to double stack 6x24m (144m trains) which suggests platforms close to 300m (985 feet) long

I am guessing making provision for two pairs of 6car 195s (do they actually have enough of these ?



It would allow two double 185s or 323s to stack with combinations of the others, or two 802s or 397s (and so on).

== Doublepost prevention - post automatically merged: ==

Have any plans been published anywhere? Planning application?

I thought extending the throat required demolition of a small bridge connecting two airport car parks , so I'm surprised it has reached this stage without more info coming out about how it will be done.
I think that it was mentioned obliquely at the same time as other measures were being contracted for, like the new platform at Salford Crescent.
 