From BBC News: http://news.bbc.co.uk/1/hi/england/west_midlands/8194598.stm

Work on a £598m project to transform Birmingham's New Street station will begin in September.

Engineers will start preparatory work to build a new concourse next to the station in what is currently the NCP Pallasades lower-level car park.

The New Street Gateway Project aims to transform the 1960s-built station into a "landmark, 21st Century transport hub".

The station has been criticised in the past for its outdated concrete look.

Network Rail said passengers would not be affected by the work.

Brighter platforms

The new concourse, expected to be more than three times bigger than the present one and enclosed by a light-filled atrium, is due to open to the public in 2012.

The old concourse will be redeveloped during a second phase of work.

Eventually the station will have brighter and clearer platforms that are easier to reach - with 30 new escalators and 15 new lifts.

A spokeswoman for Network Rail, which is funding the project along with the city council, government agency Advantage West Midlands, and Centro, said it was an exciting time.

City council leader Mike Whitby said New Street would be transformed into a station that would be "the envy of the world".
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

the sniper

Established Member
Joined
4 Sep 2007
Messages
3,498
Is anyone else going to miss the current New Street station a little bit? :oops:
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,726
Location
Milton Keynes
City council leader Mike Whitby said New Street would be transformed into a station that would be "the envy of the world".

so it's going to be crap then?

for a great underground mainline station, you can't beat Kassel-Wilhelmshöhe, straight out of Blade Runner
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
I hope they don't screw it up. NR (or Railtrack) screwed up when they didn't take the option of extra space under the Bullring so I'm hoping that it won't become a hack and bodge job :|

I'll miss the smell of diesel though :)
 

37401

Established Member
Joined
12 Nov 2008
Messages
3,276
Location
Birmingham
Is anyone else going to miss the current New Street station a little bit? :oops:

Yeah big time, I miss how it was standing there with the big "flapper" boards waiting to go off here and there thats how ill remember it
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
I hope they don't screw it up. NR (or Railtrack) screwed up when they didn't take the option of extra space under the Bullring so I'm hoping that it won't become a hack and bodge job :|

I thought the option was room so a third tunnel could be put in ?? wouldnt solve an awful lot, you would still have the same amount of platforms, just more trains trying to get in at once.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
Yea, liked that one. The 'darkness' was New St in my opinion.

The first time I went to New Street was at ~5am one December morning for an hour stopover en-route to London. It was only three years later on a daytime journey from Cardiff to Derby that I realised it's also dark and dingy in the daytime!
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
The dreams of architects are wild and wonderful. That concept drawing is absolutley hideous. I'm glad that both the budget and logical constraints of engineering will reign it in to a functional and better looking structure. Having said that it will still have it's fair share of disasters and dramas and cost about 1.75x if not more.........
 

the sniper

Established Member
Joined
4 Sep 2007
Messages
3,498
Yeah big time, I miss how it was standing there with the big "flapper" boards waiting to go off here and there thats how ill remember it

Your comment made me smile as that's exsactly the same main memory I'll have of the place when it gone, even though the 'flapper' boards hasn't been up there for what, six or seven years?

New Street lost a lot of it's (relatively little) charm when they took down the old departure boards and switched to automated announcements.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,124
Location
Birmingham
I thought the option was room so a third tunnel could be put in ?? wouldnt solve an awful lot, you would still have the same amount of platforms, just more trains trying to get in at once.

It would allow more trains to arrive and depart at the same time which would have avoided queueing at the South end and departing trains being delayed during peak times.
 

37401

Established Member
Joined
12 Nov 2008
Messages
3,276
Location
Birmingham
Your comment made me smile as that's exsactly the same main memory I'll have of the place when it gone, even though the 'flapper' boards hasn't been up there for what, six or seven years?

New Street lost a lot of it's (relatively little) charm when they took down the old departure boards and switched to automated announcements.

Yeah I remember when we went to scotland there was one that carried on flipping for ages :lol: its strange how I can remember stuff like that and the HST bash up there but I cant remember much from school :lol: Rail-Based selective memory
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,655
Platform space is why they queue, nothing to do with the amount of tracks going in there. The best you could have done with another tunnel is seperate the cross city from trains from Landor St or St Andrews. It still doesnt solve any problems of them having to cross in the throat due to platform allocation.
 