Work Restarts on Brussels RER

Status
Not open for further replies.

TheSeeker

Member
Joined
15 Feb 2016
Messages
314
Location
Braine-l'Alleud
http://www.dhnet.be/regions/brabant/rer-le-brabant-devra-attendre-2026-5abbc83fcd709bfa6b0baadd

Work has restarted on two lines of the Brussels RER after a three year gap. Especially frustrating on my line, Brussels <-> Charleroi as so much of the earthworks, new bridges and stations was already mostly complete and has been slowly falling in disrepair. Graffiti and weeds growing through new platforms.

At one point it was suggested that the new track bed, already in place between Braine l'Alleud and Waterloo be used as a cycle path!

The section that passes through Flanders before reaching Brussels will take more time to restart as the planning permission and construction permits have expired.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

duesselmartin

Established Member
Joined
18 Jan 2014
Messages
2,155
Location
Duisburg, Germany
The division in Belgium seems to be a constant hinderence. Oddly enough, Belgium build a little used high speed line frome Liegé to the German border.

But planning and building in Germany are also two seperate things. Look at the feeder line from Germany to Basel (for the Gotthard tunnel). God knows when that is done. Or the extension of the Betuwe route from the Netherlands into Germany, again hinderence on the German side.
The Fehrmanbelt tunnel to Denmark, start of work for 2022 is also again in doubt.
 

317666

Established Member
Joined
4 Sep 2009
Messages
1,775
Location
East Anglia
I've been visiting Belgium once or twice a year for the past four years, and noticed that the section between Brussels and Ottignies didn't seem to be making much progress over those four years!
 

TheSeeker

Member
Joined
15 Feb 2016
Messages
314
Location
Braine-l'Alleud
I noticed some activity around Linkebeek and Moensberg this morning. Contractors back there fitting railings, it's been a very long time with no activity at all.
 
Last edited:

MarcVD

Established Member
Joined
23 Aug 2016
Messages
1,241
Financial means will be dedicated to the Ottignies line first, and on this line, tracklaying restarted already.
 