Work between Waterloo and Surbition to overrun

Status
Not open for further replies.

ushawk

Established Member
Joined
5 Nov 2010
Messages
1,965
Location
Eastbourne
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

9K43

Member
Joined
1 May 2010
Messages
558
To get a possession over run is so easy.
All you need is a rubber band on a track lifting machine to break or a hydraulic pipe to bust on a tamper and the job comes to a stand.
In all my railway time, I have spent nearly every Saturday night/all day Sundays on Ballast trains all over the place. This was all in a nights/days work.
Everything came right when you got paid on a Thursday with the overtime you made at the week end.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
Engineering work between Waterloo and Surbiton at Clapham Junction looks like it will overrun until tomorrow.

Anyone have any idea what work is being done, why its overrun and if its related to the bridge replacement happening on the Victoria lines ?

Of academic interest now it's all over, but as far as the 'rules of the route possesions plan' was concerned there was no actual work being done on the SWML slows, it was part of the possession required for the Pouparts Jn bridge work. When I passed on Monday there was a Kirow rail crane on the up Brighton fast, with its outriggers (legs) extended out over the SWML down slow.

Having closed both lines at that point, the SWT service was affected between Waterloo and Surbiton, but nothing much would be seen happening on the overall route.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
The possesion overan because a track worker was seriously injured on site. Work then had to be suspended for the normal enquiries to take place.
--- old post above --- --- new post below ---
Apparently the guys name was Ben he's 28 and suffered very serious injuries to both his legs in an unloading incident. Hope you make a full recovery Ben.
 

Matt Taylor

Established Member
Joined
31 Aug 2008
Messages
2,362
Location
Portsmouth
The railway bush telegraph is suggesting some serious malpractice with regard to this incident, I sincerely hope that I am misinformed on this matter though.
 