Wooden Sleepers

Status
Not open for further replies.

Lewis

Member
Joined
3 Dec 2011
Messages
17
Location
Didcot
Local to me N.R. are replacing 10 sets of points over the Christmas period. Brand new wooden sleepers were delivered to the site and when I enquired why I was told that they have to use a wooden sleeper where the points join standard track. Does anyone know why, please?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
The decision as to whether to use concrete or wooden sleepers will come down to the type of S&C and the track category. It is not normal to install wooden S&C on main and secondary passenger lines except where there is a weight issue or there is some other specific reason as to why concrete should not be used.

That said Network Rail have been down-specifying track for a while now, and I understand that they have pretty much stopped installing UIC 60 series rail S&C.
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
There is a requirement to install four timber sleepers between steel sleepered and concrete sleepered track.

Where timber and concrete sleepered track meet at a rail joint or weld the change in sleeper type should be at least two sleepers from the joint in the rail. So if putting new concrete bearer S&C into older timber sleepered plain line you would finish the last new panel with a couple of new timber sleepers.

There may also be an underbridge with only a thin layer of ballast between the underside of the sleepers and the bridge deck. More unusually in a tight circular tunnel it may be nessesary to chamfer off the underside of the sleeper ends.

What they should not be used for is shortended sleepers at catchpits, better to have the manufacturer cut the ends short on some concretes for you so all the sleepers match. Such sleepers were standard items in BR days, but need to be arranged specially these days.
--- old post above --- --- new post below ---
That said Network Rail have been down-specifying track for a while now, and I understand that they have pretty much stopped installing the NR60 CEN60 rail S&C.


Only the smaller sizes, now done in CEN56 vertical on concrete.
 

Lewis

Member
Joined
3 Dec 2011
Messages
17
Location
Didcot
The information that I was given by Colas/Amey was wrong. This morning I met the guy from Network Rail responsible for points and he informed me that the new wooden sleepers were being installed at the entrance to Didcot Railway Centre as part of the new pointwork there. Makes a lot more sense!
 