On Saturday I was on a train from Birmingham New Street to Lichfield City which stopped for an extended period at Shenstone. As time went on there were increasing grumbles in the carriage as people tried to work out what was going on - had something gone wrong? When would we be moving?
Silence from the conductor.
Eventually, we checked RTT and found that the 19 minute stop was scheduled at Shenstone on an amended timetable, the result of having to terminate trains at City instead of running to Trent Valley, because of the problems with the platform at Trent Valley High Level.
The point is - we are savvy and able to do this check and join all the dots together and come to the same conclusion. Many people on the train were not able and were left wondering what was going on.
How much would it have taken for someone to make an announcement, ahead of or at Shenstone, to let people know this was planned? The PA system was working on this particular 323 and in fact, when we moved on from Shenstone and stopped at a red signal approaching City, the conductor actually made an announcement to tell us!
Perhaps they thought they didn't have to announce the delay at Shenstone because it was, in their minds, planned? But how are the travelling general public to know?
To my mind it's just another example of a customer-unfriendly railway. Do we really want to "get back on track"? Because this is not how to do it.
Silence from the conductor.
Eventually, we checked RTT and found that the 19 minute stop was scheduled at Shenstone on an amended timetable, the result of having to terminate trains at City instead of running to Trent Valley, because of the problems with the platform at Trent Valley High Level.
The point is - we are savvy and able to do this check and join all the dots together and come to the same conclusion. Many people on the train were not able and were left wondering what was going on.
How much would it have taken for someone to make an announcement, ahead of or at Shenstone, to let people know this was planned? The PA system was working on this particular 323 and in fact, when we moved on from Shenstone and stopped at a red signal approaching City, the conductor actually made an announcement to tell us!
Perhaps they thought they didn't have to announce the delay at Shenstone because it was, in their minds, planned? But how are the travelling general public to know?
To my mind it's just another example of a customer-unfriendly railway. Do we really want to "get back on track"? Because this is not how to do it.