Well it doesn't look like Barrow is going to be electrified either, so send the Scotland services via Wigan and revert the rest of TPE North West to the pre-2007 pattern. Sorted.
Even when I lived in Leeds I never knew anyone who used the Heysham ferries, I thought they were mainly based on the freight market.
Well it doesn't look like Barrow is going to be electrified either, so send the Scotland services via Wigan and revert the rest of TPE North West to the pre-2007 pattern. Sorted.
From the Isle of Man, the daytime Heysham boat is the only year-round passenger vessel, and when I've used it, the train has always had a reasonable number of people on it. I'm sure a few use it through to Leeds (I have once in the ten-odd times I've used it), but it's real purpose is to get to Lancaster.
Up until a few years ago, there were two trains to Heysham, the first (if I remember rightly) leaving at 1246, which was a much more attractive proposition than waiting around for an hour until 1315 with nothing but a practically derelict ferry company and a nuclear power station for company! That said, I appreciate it's hardly the most essential connection NT make each day in terms of passenger numbers.
...but this then means Lancaster gets three or four trains every two hours to Manchester (compared the hourly service pre 2007), because there's both the TPE service via Wigan and the "old" service via Bolton.
--- old post above --- --- new post below ---
Cheers

Not sure where the offence comes from (or your comment about the lack of tourist attractions around here)...
There are only two direct services from Manchester Airport/ Manchester to Windermere, the 09.29 and the 16.00 (Monday to Thursday).
Let me clarify matters. The comment to which you refer was that of my wife...not I. She was responding to your posting #16 in which you stated:-
Either wire the Windermere branch or forget having direct Manchester services. ... she took your statement as being somewhat of an ultimatum.
The 0929 direct service is the one used and there are direct return services later in the day which means opportunities for a stay of 6 hours in which to do all that we require.
Barry Doe once commented that a mid-afternoon departure he was on from Windermere (a 185) carried more in First than it did in Standard! (7 people inc. himslef in First and 6 in Standard!)
...but this then means Lancaster gets three or four trains every two hours to Manchester (compared the hourly service pre 2007), because there's both the TPE service via Wigan and the "old" service via Bolton.
The EMU service between Manchester and Scotland is set to be every 2 hours initially but may be increased to hourly and have portion working to/from Liverpool in the future.
Logic should then be to completely reinstate the old calling patterns, don't forget that VXC ran between Lancaster and Manchester every 2 hours as well calling only at Preston and Bolton:
1tph Manchester Airport - Blackpool (TPE EMU)
1tph Manchester Victoria - Blackpool (Northern)
1tph Manchester Airport - Lancaster (Barrow/Windermere alternating) (TPE 'Classic')
1tp2h Manchester Airport - Scotland (Glasgow/Edinburgh alternating) (TPE EMU)
If you send the Scotland services via Wigan you could keep the Preston - Hazel Grove services as well, Windermere regains its regular service to Manchester and there is a net increase in capacity between Preston and Manchester. The 185s freed up with Blackpool electrification could then be used to strengthen Barrow/Windermere services, everyone's a winner![]()
If the Windermere line were to be electrified, Manchester Airport could not obtain any benefit from it until the Manchester - Bolton - Euxton junction line was fully electrified. This would allow for the electrification work to Windermere to be carried out in time for this to happen. Can I ask two questions here:-
(1)...What length of time would be needed to complete the electrification works to Windermere?
(2)...It has recently been suggested that the time completion date for the Manchester to Euxton Junction electrification works has been brought forward. If this is the case, what now is the projected year for full completion of these works?
I agree.
Not sure where the offence comes from (or your comment about the lack of tourist attractions around here)...
Since Barrow is unlikely to be wired up in the foreseeable future, is there [any need/ any point/ is it fair] to wire Windermere?
Exactly the point I made a page ago
There's no point in wiring Windermere if Barrow isn't being done.