231 for Tame Bridge Parkway and 779 for Wolves.What's that compared to say Tame Bridge Parkway? Considering if given the option to drive to a station most would probably pick one with a more frequent service.
231 for Tame Bridge Parkway and 779 for Wolves.What's that compared to say Tame Bridge Parkway? Considering if given the option to drive to a station most would probably pick one with a more frequent service.
Out of the two I can see Willenhall being the most popular (based on location) however with only an hourly service it faces an uphill battle over the frequent buses for anybody wanting to head to Wolverhampton.
231 at Tame Bridge.What's that compared to say Tame Bridge Parkway? Considering if given the option to drive to a station most would probably pick one with a more frequent service.
That's because it was never 'Performance Time's.< 3.5 > Performance Time has magically become two station calls with the pass times for Darlaston Jn and Portobello Jn per WTT.
I think Darlaston might be used a bit more to Wolverhampton. Mostly by people who live the Walsall side of Darlaston (for me it’s not really Darlaston could be called Walsall South or something similar) or even Walsall (particularly the south side), but yes most traffic from both will be in/out of Birmingham I’d imagine.Few people will jse it to go to Wolverhampton, the bus is too easy and for many people free. It will be used for going to Birmingham, and to other places north with connections in Wolverhampton.
I am very well aware of why the time was in the schedule, hence my choice in describing the change as magical in explaining what had changed, and highlighting that it was planned by pointing out that the WTT timings of the mandatory timing points before/after the stations had not required any amendment.That's because it was never 'Performance Time's.
It was padding on the WTT for the future stops at those stations. There was padding on the old New St - Crewe service for those stops too!
The train is also free for many people within the West Midlands, as their pass covers train, bus, and tram.Few people will jse it to go to Wolverhampton, the bus is too easy and for many people free. It will be used for going to Birmingham, and to other places north with connections in Wolverhampton.
And lack of revenue protection outside of Birmingham city centreThe train is also free for many people within the West Midlands, as their pass covers train, bus, and tram.
Actually not true. I have had my pass checked by the guard on trains from Selly Oak into Birmingham. I always get my ticket or pass checked if I travel on Avanti coming in from Sandwell and Dudley. I don't know if they still do but Cross Country always used to check tickets out of New Street as there was always a crew change there. Recently coming from Worcester to Rowley Regis as I got off the train a Revenue Control Team stepped onto the train which was heading into Birmingham.And lack of revenue protection outside of Birmingham city centre
Train testing under way on new Birmingham rail line
Final testing is being carried out at five new railway stations in the West Midlands before they open their ticket barriers to passengers.
Stations at Willenhall and Darlaston in the Black Country will open on Thursday 19 March.
And three Birmingham stations - at Moseley, Kings Heath and Pineapple Road - will open on Tuesday 7 April as the Camp Hill Line is brought back to life.
It was closed in 1941 during World War Two, because of a shortage of coal, and never reopened.
On Monday, trains were travelling between Birmingham New Street and Kings Norton via the three new Birmingham stations as work is completed at the locations.
Nice to see that the BBC is keeping up with the local news. These training/test trains have bee running for several weeks. The only difference today is that they have a 4 car unit whereas most days they have had a 2 car unit running.![]()
Train testing under way on new Birmingham rail line
The Camp Hill line is opening to commuters from early April.www.bbc.co.uk
Train testing under way on new Birmingham rail line
Final testing is being carried out at five new railway stations in the West Midlands before they open their ticket barriers to passengers.
Stations at Willenhall and Darlaston in the Black Country will open on Thursday 19 March.
And three Birmingham stations - at Moseley, Kings Heath and Pineapple Road - will open on Tuesday 7 April as the Camp Hill Line is brought back to life.
It was closed in 1941 during World War Two, because of a shortage of coal, and never reopened.
On Monday, trains were travelling between Birmingham New Street and Kings Norton via the three new Birmingham stations as work is completed at the locations.
Cross city has had revenue protection teams onboard and at the barriers at new street much more often recentlyI watched a video recently and Five Ways was the only station on the Cross City Line which recorded a fall in the number of tickets sold last year. This was put down to a clamp down on 'Short Faring' i.e. people just buying tickets from Five Ways in order to get through the barriers at New Street although they had travelled from further out.
They only reported it because it was press event with the transport sec and Mayor being onboard....Nice to see that the BBC is keeping up with the local news. These training/test trains have bee running for several weeks. The only difference today is that they have a 4 car unit whereas most days they have had a 2 car unit running.
Ticket checks is incredibly rare on WMR in my experience.Well that is impressive . Every time I’m in the West Midlands the only place I see on train ticket checks is the TFW Wales trains between Brum and Wolves
Mine almost always get checked when i’m travelling on the Nuneaton - Leamington service, but I digress.Ticket checks is incredibly rare on WMR in my experience.


Willenhall: https://www.orr.gov.uk/sites/defaul...ation-orr-authorisation-letter-2026-03-18.pdfThis authorisation is for the placing in service of changes at Darlaston Station, which includes:
• Two 105m platforms with canopies
• New platform canopies and furniture
• A footbridge with lifts and covered access stairs
• Lighting, signages and station information including customer information systems, public address systems.
The authorisation is defined by the following limits.
Darlaston Station PBJ 10M 010Ch
This authorisation is for the placing in service of changes at Willenhall Station, which includes:
• Two 105m platforms with canopies
• New platform canopies and furniture
• A footbridge with lifts and covered access stairs
• The second entrance with stair and lift between Platform 1 and Bilston Street Bridge
• Lighting, signages and station information including customer information systems, public address systems.
The authorisation is defined by the following limits.
Willenhall Station PBJ 11M 010Ch



Presumably there will be a rail replacement bus.I was planning to take the 1626 from New Street but it’s been cancelled (along with the 1326 which presumably is the same unit and crew)
I've never understood why they put the tactile paving on the far side of the yellow line. If the objective is for people not to cross the yellow line, surely they will also want blind people not to cross it either. As it is at the moment, a blind person will already have crossed the yellow line before encountering the tactile paving. The solution to my mind is to incorporate the tactile paving into the yellow line itself.View attachment 200628
Welcome to Darlaston
View attachment 200629
I've already been told to stand behind the yellow line (twice!) - I suspect I get the award for first person to be so told!
There's plenty of people stood around in hi viz, but interestingly the only one who seems bothered by yellow line "incursions" is the one in yellow who looks like contract security (who's probably been told that crossi6the line immediately results in death...)
Me again. Welcome to our world on the Shrewsbury line. Train crew problem my XXXX.Presumably there will be a rail replacement bus.
It's probably a conflict of design standards? I'm not familiar with the standards involved, but I wouldn't be surprised if one standard says "tactile paving should be 0.5m from the platform edge" and another standard says "the yellow line must be 1m from the platform edge" (distances made up for illustrative purposes).I've never understood why they put the tactile paving on the far side of the yellow line. If the objective is for people not to cross the yellow line, surely they will also want blind people not to cross it either. As it is at the moment, a blind person will already have crossed the yellow line before encountering the tactile paving. The solution to my mind is to incorporate the tactile paving into the yellow line itself.


There's plenty of people stood around in hi viz, but interestingly the only one who seems bothered by yellow line "incursions" is the one in yellow who looks like contract security (who's probably been told that crossi6the line immediately results in death...)
What's with them having 105m platforms ?The ORR Authorisations for both stations were published to the website this morning or overnight, the decision dated yesterday. Is this a record the shortest gap between ORR approval and opening to passengers?
Darlaston: https://www.orr.gov.uk/sites/defaul...ation-orr-authorisation-letter-2026-03-18.pdf
Willenhall: https://www.orr.gov.uk/sites/defaul...ation-orr-authorisation-letter-2026-03-18.pdf