Fastlane256
Member
Hello,
I am a commuter on SWR. I was wondering if there is any plans to change the network to OLE as it is way more efficient and safer. I assume it would be low priority as they would want to electrify the entire uk network beforehand?
Also, does anyone know the max speed capable on 3rd rail? I would assume 100mph as that is what is on the South western mainline.
== Doublepost prevention - post automatically merged: ==
And if anyone knows any rumoured dates for the 701, that would be amazing. They do seem to be very delayed.
I am a commuter on SWR. I was wondering if there is any plans to change the network to OLE as it is way more efficient and safer. I assume it would be low priority as they would want to electrify the entire uk network beforehand?
Also, does anyone know the max speed capable on 3rd rail? I would assume 100mph as that is what is on the South western mainline.
== Doublepost prevention - post automatically merged: ==
And if anyone knows any rumoured dates for the 701, that would be amazing. They do seem to be very delayed.
