Going slightly off topic, in the absence of a rolling stock order is it reasonable to assume that Scotrail have sufficient slack in their EMU fleet to run Barrhead when electrification is complete?
There are certainly spare 380s/385s, but I understand the intention is to use 318/320s.Going slightly off topic, in the absence of a rolling stock order is it reasonable to assume that Scotrail have sufficient slack in their EMU fleet to run Barrhead when electrification is complete?
There are certainly spare 380s/385s, but I understand the intention is to use 318/320s.
Yes, but I believe the standards for DOO routes have been changed since 2012 and new routes cannot have mirrors. There's also been no mention of how they intend to operate the route but the likelihood is that it will be DCO unless ScotRail/TS want yet another dispute with the RMT and potentially ASLEF.Didn't they just add mirrors to Paisley Canal for 318/320 use.
I was going off posts back at the existing of this thread. 380/385s I can see being used, certainly makes more sense when you mention the lack of DOO equipment, but I assumed the Barrhead/EK would be moving to DOO as per the Strathclyde Electric routes.Can't use 318/320s on that route as it's not set up for DOO operation. All new DOO operations require appropriate platform/train CCTV interfaces or onboard DOO cctv cameras/monitors.
The likelihood is that it will be 385s as most of the drivers that work the route currently sign 385s and 380s and Ayr drivers are due to be trained on 385s within the next 12 months.
As noted above, the problem isn't the union agreements but rather that the infrastructure doesn't currently support DOO.East Kilbride and Barrhead would comfortably be covered by the Strathclyde Manning Agreement and move to DOO.
East Kilbride and Barrhead would comfortably be covered by the Strathclyde Manning Agreement and move to DOO.
SMA does NOT guarantee a 2nd member of staff on the train. Downgrading the soon to be electrified Barrhead and East Kilbride routes to DOO under the SMA will greatly reduce access to public transport for persons of reduced mobility.
The Barrhead terminators at present are only hourly, therefore one 3 or 4-car EMU could cover the service, and even if the timetable goes back to the pre-Covid level only two sets would be required, which could well be squeezed from Scotrail's existing fleet. Things will change of course once East Kilbride is wired!
All trains should be diagrammed for a second member of staff, but if that person is not available on an SMA service the train will still run, whereas on a Guard-operated route it will be cancelled and no-one gets a train. It really will be quite ludicrous if a train to Neilston can run, as they have for over 30 years, without a Guard, yet a train to Barrhead, 3 miles away and to be operated by the same stock, cannot.
How did they get away with extending DOO to Edinburgh (via Bathgate) if the agreement only covers former Strathclyde region?East Kilbride and Barrhead would comfortably be covered by the Strathclyde Manning Agreement and move to DOO.
It used to be a rare occasion there was no Ticket Examiner or station staff available to assist on the routes I drive over but it is becoming a more regular occurance where I have no TE and the station is unmanned.
How did they get away with extending DOO to Edinburgh (via Bathgate) if the agreement only covers former Strathclyde region?
Edinburgh-Glasgow is driver door release, DCO potentially gives drivers full control of doors or can be shared with conductors as happens on Greater Anglia for example.. DCO then happened with EnG.
Edinburgh-Glasgow is driver door release, DCO potentially gives drivers full control of doors or can be shared with conductors as happens on Greater Anglia for example.