• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Wien Hbf and through vs terminus stations

43096

On Moderation
Joined
23 Nov 2015
Messages
18,820
The context here is the HSR era where Poland runs 300km/h EMUs into Germany.
Evidently you missed this bit of my post "If the current method of operation persists"
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The exile

Established Member
Joined
31 Mar 2010
Messages
9,403
Location
Somerset
The context here is the HSR era where Poland runs 300km/h EMUs into Germany.

== Doublepost prevention - post automatically merged: ==



Through / terminus doesn't matter. Single vs different stations does.

What's happening in Florence breaks the connections between high-speed and regional services.

What I'm proposing for Berlin maintains the vast majority of regional connection to all inter-city trains (all north-south regional traffic would hit my alternative Hbf complex and Potsdammerplatz) and have delivered S21 early.
It was you who specified two terminal stations….
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,270
Location
London
It was you who specified two terminal stations….

Co-located with though services.

== Doublepost prevention - post automatically merged: ==

Evidently you missed this bit of my post "If the current method of operation persists"

Which is irrelevant, as austriantrains was talking about a post HSR situation where Poland - Berlin trains become more strategically important.
 
Last edited:

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,802
Which is irrelevant, as austriantrains was talking about a post HSR situation where Poland - Berlin trains become more strategically important.

That was indeed my point. But it should not be forgotten that Berlin Hbf - opened 2006 - was planned in the early 1990s. It is not much use criticizing what was decided 30 years ago based on the world at it is now. Also no use building something which might only work 30-40 years later, as I said before.
 

Top