Quite often, when there are engineering works on the Thameslink route and the central London section (St. Pancras Thameslink - Blackfriars) is closed, trains terminate at St. Pancras upper level and often cannot call at Kentish Town despite still passing through the station. Does anybody know the reason please?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,392
Quite often, when there are engineering works on the Thameslink route and the central London section (St. Pancras Thameslink - Blackfriars) is closed, trains terminate at St. Pancras upper level and often cannot call at Kentish Town despite still passing through the station. Does anybody know the reason please?

There aren't any platforms there on the fast lines and the block potentially covers the lines with platforms.

For track layout see http://www.opentraintimes.com/maps/signalling/spc1
 
Last edited: