AndyY
Member
Quite often, when there are engineering works on the Thameslink route and the central London section (St. Pancras Thameslink - Blackfriars) is closed, trains terminate at St. Pancras upper level and often cannot call at Kentish Town despite still passing through the station. Does anybody know the reason please?