There was a piece on Newsnight tonight about HS2's prospects.
It was reported that "the DfT and the Treasury has lost confidence in HS2 Ltd as a delivery company".
The political demand is to redefine the delivery vehicle to be more in tune with northern/midlands needs, and to reorient the project accordingly with new terms of reference.
The suggestion is that the Integrated Rail Plan, far from being ready to publish, is causing a major re-evaluation of the project and its purpose, and its links with NPR.
I presume all this relates to HS2 Phase 2b (west and east legs) and not Phase 1/2a (London-Birmingham-Crewe) which are already approved.
Indeed, when the latest delay to the IRP was announced, my first conclusion was that the govt was still arguing about what is to go in it.The suggestion is that the Integrated Rail Plan, far from being ready to publish, is causing a major re-evaluation of the project and its purpose, and its links with NPR.
HS2 Ltd now has two roles:There was a piece on Newsnight tonight about HS2's prospects.
It was reported that "the DfT and the Treasury has lost confidence in HS2 Ltd as a delivery company".
The political demand is to redefine the delivery vehicle to be more in tune with northern/midlands needs, and to reorient the project accordingly with new terms of reference.
The suggestion is that the Integrated Rail Plan, far from being ready to publish, is causing a major re-evaluation of the project and its purpose, and its links with NPR.
I presume all this relates to HS2 Phase 2b (west and east legs) and not Phase 1/2a (London-Birmingham-Crewe) which are already approved.
I expect that Hs2 is not being billed for the main line station.
Not sure where you get that idea from. HS2 are doing the work, it’s in their budget.
It does actually get back to the Original Poster's question, about costs, the way that estimates constantly skyrocket with no seeming reason why they are doing so, especially where the scope is not changing. Either the initial estimators do not have a clue, or there are all sorts of changes etc being slipped in. When Mark Wild, head of Crossrail, says that Crossrail was too gold plated * and thus too difficult [ Crossrail chief advises HS2 boss to keep designs simple | New Civil Engineer ] , and when the principal staff from the one are moving on to the other, then there's a major concern.There was a piece on Newsnight tonight about HS2's prospects.
It was reported that "the DfT and the Treasury have lost confidence in HS2 Ltd as a delivery company".
The political demand is to redefine the delivery vehicle to be more in tune with northern/midlands needs, and to reorient the project accordingly with new terms of reference.
The suggestion is that the Integrated Rail Plan, far from being ready to publish, is causing a major re-evaluation of the project and its purpose, and its links with NPR.
I presume all this relates to HS2 Phase 2b (west and east legs) and not Phase 1/2a (London-Birmingham-Crewe) which are already approved.
It's all very well to blame the management team of HS2 Ltd for the project's ills, but they were appointed and their terms of reference set by Conservative ministers.
That's true, and HS2 Ltd was set up by Labour in January 2009 (with cross-party support for the scheme).HS2 is, ultimately, a Labour project - the project specification that led to this mess was largely decided before 2010?
The Conservatives have been in power for 11 years. At some point they need to step up and take responsibility for their decisions. I know it's traditional to blame previous governments but pointing fingers at Labour this far down the line is really stretching it.HS2 is, ultimately, a Labour project - the project specification that led to this mess was largely decided before 2010?
Fair point! I subsequently discovered it is possible to download PNG of the graphs from Transit Costs, so here is table 4, 5 and 10. On the site you can mouseover to show more data, and most of the scatter graphs are useless without that feature.Unfortunately the website you linked to won’t load properly for me so I can’t judge. What I do know is that the cost of HS2 ‘per mile’ is significantly affected by Euston, OOC and Birmingham Curzon St, the first two of which are an order of magnitude more expensive than their cousins at St Pancras and Ebbsfleet respectively, because their scope of work is similarly larger.
4. Cost/km, projects grouped for each country, in order of the cost based on the cheapest line
Here, we see the range of costs within each country, and the colors show the tunnel percentage for each project. We show unknown tunnel % as 0%.
Costs/km stay within a consistent range for some countries such as Spain, Germany and South Korea, whereas they vary quite a bit in Turkey, Italy, China and UK. The tunnel percentage raise the costs as expected, in France, Spain, Italy, South Korea and Austria. (We lack tunnel % data for most of the Chinese lines, but the lines that are mostly elevated aren’t the most expensive, in the Chinese case.)

5. Average cost/km per country (with tunnel %)
Here are the countries ordered by costs, based on the weighted average cost of the projects in our database. The colors represent the weighted average of percentage of tunnel for the projects in each country, and the number of projects our database covers per country can be seen by hovering over each bar. We show unknown tunnel % as 0%.
Based on this and the following chart, we can tell that percentage of tunnels and elevated sections raise costs to some extent. Austria, South Korea and Japan build a lot of tunnels. Netherlands, Taiwan and UK don’t but are more expensive (but Taiwan builds elevated). On the other hand, Switzerland and Norway build tunnels, but their km costs are low.

10. A Heat map of costs per country in years
This chart shows how costs per country have changed over time. Colors indicate the square root of the Cost/km in $ M.
Each square represents the start of one or more projects in that country, and if there is more than one, the cost seen when hovering on it is the weighted average km costs of the projects that started that year.
In this chart we see that costs increased over the years for almost all countries, while Turkey, Spain and France were able to keep their costs lower. Looking at their most recent projects in our database, Japan and UK saw significant increases in their costs.

Yes, except the top job in DfT was always a Conservative (Philip Hammond/Justine Greening/Patrick McLoughlin).As between 2010 and 2015 we were governed by a coalition, can we blame the Lib Dems as well as Labour and the Conservatives![]()
HS2 really makes no sense if it only links London and Birmingham. Of course east-west cross-Pennine links need to be massively improved (if anything "NPR" isn't ambitious enough) but Phase 2 of HS2 is needed to link everything together.
HS2 has never been solely about linking London and Birmingham, no matter how the HS2-anti brigade try to plant the idea. Even phase 1 would be expected to remove the long distance services north of Birmingham served by the WCML South thus freeing up capacity
Though this creates a bit of an issue when phase 2 comes in, what do you do about places like macclesfield, stockport, wilmslow etc? do you continue running some trains to crewe on HS2 and then Manchester on the classic lines? do you serve those places using the classic WCML? do you take away those places direct services to London?HS2 has never been solely about linking London and Birmingham, no matter how the HS2-anti brigade try to plant the idea. Even phase 1 would be expected to remove the long distance services north of Birmingham served by the WCML South thus freeing up capacity
Though this creates a bit of an issue when phase 2 comes in, what do you do about places like macclesfield, stockport, wilmslow etc? do you continue running some trains to crewe on HS2 and then Manchester on the classic lines? do you serve those places using the classic WCML? do you take away those places direct services to London?
Whilst hyperloop is silly, I have some sympathy with the conception of rather than trying to build a tree like hybrid high speed/classic network, we should just build a very high speed metro style system.The irony is that often the "alternative" pushed by those opposed to HS2 is hyperloop which would only link those two.