Three car 175's stop there, they have SDO I believe rather than local door entry/exit . Also checked on RTT there was one today, so it's still going on.Only trains with two carrages are stopping at Conwy.
Three car 175's stop there, they have SDO I believe rather than local door entry/exit . Also checked on RTT there was one today, so it's still going on.Only trains with two carrages are stopping at Conwy.
By the time you've typed in "Conw " the National Rail website suggests three stations, so it should be obvious that Conwy has a station. (The others are Conway Park and Glan Conwy).Conwy does come up on the rail websites. However, if you type in the English spelling “Conway" - you get Conway Park. So, we could have a situation where many people would like to go direct to Conway but think it does not have a station.
Post #3.Presumably Conwy's platforms could be extended?
Three car 175's stop there, they have SDO I believe rather than local door entry/exit . Also checked on RTT there was one today, so it's still going on.
Genuine question, what are they meant to do here?This is the sort of thing that bedevills reopenings. Someone looks at it initially, closed, reopen just for local 2-car trains would cost ... £100k (such were the costs once upon a time; don't laugh). Platform for 2 cars just fits nicely, especially as when it opened they were probably 57' long Met-Cams. Local authority chips in, gets done, is quite successful. That should be good. However as this, plus other stations, do well, the trains become overcrowded. Longer platforms? Oh, we'd have to rebuild the road bridge. That's £10m for a start. That the platforms used to go under it is by the by, apparently. Meanwhile we have much longer trains (though apparently with less seats). Maybe we can have more trains, at least? No, that increases the likelihood that we might delay the Avanti. They would charge us for any delay more than the extra fare revenue would be worth. So No all round.
The Eastbound platform possibly, although you might have to get a width derogation to avoid shifting the retaining wall. but any extension of the westbound platform will mean moving the stairs, and probably some quite serious work to the retaining wall to get it to fit, even with a reduced width from that required by the standards.Looks to me like if you lopped some trees you could extend to 3-car, possibly even 4.
Stop twice; once for the front two cars, once for the rear two.Genuine question, what are they meant to do here?
My point was to put the points rather than have an easy and glib solution. It was a similar issue on the DLR here in London. When they initially went from one car to two car trains, the extensions of course went the "easy" way. About £200k each. When they went from two to three car extensions it needed going the "difficult" way now. ten times as much.Genuine question, what are they meant to do here?
The three through platforms at the Junction have capacities ranging from 11-15 20m carriage lengths; Conwy can accommodate 2. Only so much SDO can do!Conwy is staycation central at the moment. It is a genuinely pleasant small town.
If Llandudno Junction wasn't what it is i.e. a junction for Llandudno and Blaenau I would seek to shift the stopping patterns away from there to Conwy.
The class 175 doesn't have SDO, they have local door operation if it's a 3 car but a 2 car fits so all doors are opened with all 2 car units booked to stop at Conwy.Three car 175's stop there, they have SDO I believe rather than local door entry/exit . Also checked on RTT there was one today, so it's still going on.
Both Deganwy and Conwy are currently request stops. From my experience, the train nearly always stops at Deganwy however as there is usually someone waiting to board/alight.Nearby Deganwy is another urban station which is only a request stop. Wikipedia lists both Conwy and Deganwy as request stops, not the most reliable source, and there have may have been changes since the list was compiled.
The MKIVs are getting SDO fitted in the future, as part of their extension to 5 + DVT sets, but I doubt we'll see them stop at Conwy even then.It might be easier when the 197s are in service, as those have selective door opening. Not the Mk4s, though I suppose "local door" could be used.
175s don't have SDO. It's local door or everything on those units, with the exception that on the rare occasions they run in multiple, the trailing unit can be locked out.Three car 175's stop there, they have SDO I believe rather than local door entry/exit . Also checked on RTT there was one today, so it's still going on.
Most of which don‘t actually call into the station bus stop, the more frequent services to Conwy call at one or two different stops on the main road which are not signposted from the actual station!There are already lots of buses, several per hour.
Deganwy passenger figures would be even higher if:Both Deganwy and Conwy are currently request stops. From my experience, the train nearly always stops at Deganwy however as there is usually someone waiting to board/alight.
The Minimum Connection Time at Llandudno Jn is five minutes so journey planners should not be showing itineraries with shorter ones. I'm not familiar with the station but perhaps it could be reducedJourney planners not showing reasonable connections to/from Deganwy and Llandudno at the Junction.
Some trains have 4 minute connections which, of course, is ample as a cross platform connectio at the Junction, but journey planners show on occasions an hour wait instead.
The Eastbound platform possibly, although you might have to get a width derogation to avoid shifting the retaining wall. but any extension of the westbound platform will mean moving the stairs, and probably some quite serious work to the retaining wall to get it to fit, even with a reduced width from that required by the standards.
You don't need the stairs, as there is level access to both platforms.
I can't imagine that all trains that stopped there were fully platformed, but it wasn't regarded as a problem then. Passengers just walked through the train, climbed/jumped down onto the ballast or were over-carried and had to get the next train back.So before its original Beeching closure, did it have short platforms then?
Must admit when visiting Conwy Castle just walked to and from Llandudno Junction station seeing as it wasn't very far. Didn't even think to bother looking at whether there would be trains at a suitable time at Conwy station.
Well the canopies etc have, but more importantly Standards have changed.No and nothing has moved.
I meant as in anything moving that could make the platforms need to be made shorter. The 800 year old arch and the slightly newer tunnel were all there when the original station and longer platforms where there.Well the canopies etc have, but more importantly Standards have changed.