• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

WHy dont we have Double Deck EMUs in UK?

Status
Not open for further replies.

raildog

Member
Joined
31 Jul 2007
Messages
17
One of the key issues in UK rail is that of congestion and overcrowding in trains.

This can be greatly reduced by using Double Deck coaches.

Weight would be an issue.. but UK unlike other countries has the same tracks for freight and passengers. So Double decks can also be accomodated.

Only issue I see is that of tunnels (Southampton?? Stoke?). But that should not stop double deck EMU's running on lines which can accomodate them..

So why not a DD EMU on UK rail?

- RD
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,840
Location
Rugby
The main issue is that many bridges and tunnels would have to re-built. Overhead wires would also have to be made higher
 

Callufrax

Member
Joined
16 Apr 2007
Messages
145
Location
Sydney, Australia
The main issue is that many bridges and tunnels would have to re-built. Overhead wires would also have to be made higher

Exactly. The OLE would have to be considerably higher - probably by as much as another metre. A 390 is, according to therailwaycentre.com, is 3.56 metres high. French DD coaches, according to Wikipedia, have a maximum allowable height of 4.2 metres - which don't have above-window luggage racks.
 

Ascot

Established Member
Joined
26 Nov 2005
Messages
3,384
Location
Birmingham, UK
Can't think of many high volume intercity routes that has no tunnels or bridges etc.. don't think the Stourbridge line covers high d.
 

Bonemaster

Member
Joined
16 Jan 2006
Messages
323
Location
Coventry

Bonemaster

Member
Joined
16 Jan 2006
Messages
323
Location
Coventry
Basically put, it's a question of cost!

and very limited extra capacity, having travelled on French RER services you can see that half of the coach is full with stairs and at peak times dwell is increased by the time it takes for people to get down the stairs

So to be simple its a question of not only cost, limited extra capacity and longer journey times, however there will be lines and stations where platform lengthening is just not possible, then they may become the only option
 

puziparrot

Member
Joined
10 Sep 2007
Messages
5
Also, a problem highlighted with the 4DDs, is the fact that to give them more room, they made the wheels/bogies smaller, and were prone to cracking. i dont know weather this would be a problem these days. Another reason for withdrawal from service is the complaints of passengers smelling the feet of the passengers above! I have an old set of newsreels on DVD, which i have taken this information from. It is sold by Video 125 if any of you are interested... ;)
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,175
Location
0035
Another problem, due to the fact these units require plenty of staircases, there is not actually that a big increase in capacity of seated passengers. Also, DD trains I've been on in Germany don't tend to have luggage racks due to the maximum height, meaning more space is needed for luggage, thus less seats and standing room.

Whilst I think that any new lines built in the UK should be made to cope with European Double Deck loading gauge, I'm sure it is actually far cheaper, and will deliver a greater capacity increase to add to train lengths up to maximum levels permitted and lengthen platforms past that to possibly include one day 16 car trains (or greater).
 

Oracle

Established Member
Joined
19 May 2006
Messages
1,410
Location
Near Ashurst New Forest Station
If you look up the 4DD Bulleid suburban trains, used doen to Dartford, you will see the problems that were had with loading gauge, clearances, discharging passengers, etc.
 

me123

Established Member
Joined
9 Jul 2007
Messages
8,510
If it were to happen here, basically, it would be a long way away. And I hope it doesn't happen, because single deck High Speed Trains would have a slower speed because of a pantograph sticking up about 2 meters high.

They work well abroad, but won't do here.
 

raildog

Member
Joined
31 Jul 2007
Messages
17
Hmmm.. going by the responses here, it pretty much rules out DD coaches in Britain.

But what may interest you is that Bombardier is said to be designing a new generation of DD coaches and EMUs which could be used in Britain and maybe even used in the Thameslink bid. Maybe they are working on it in Derby right now!!

Argument against DD - Sustainability report wants lighter eco-friendly units in Phase 1 and 2 but does not rule out the possibility of heavier trains in Phase 3 which can happen around 2010 which is the designated year of launch for Bombardiers new gen DD coaches. Maybe Bombardier has a work around for the UK gauge and OLE issues!!

-RD
 
Status
Not open for further replies.

Top