Manchester Piccadilly and Kings Cross have a habit of leaving ticket gates open, I can only imagine they do it to ease congestion. Not once at stations like Liverpool St or Paddington have I ever seen open ticket barriers in all my 10 years of using those stations. Is it to do with ToCs or Network rail?
The last three times I've boarded a train at Paddington the barriers were opened due to the rush of people. I always arrive at Paddington and look on RTT to see what platform my train departs from, or I look at the arrival board to see what platform it will be arriving into. I then position myself by the barrier to the relevant platform so I can be first onto the train and get a good seat. The platform number than eventually appears on the departure board and boarding is permitted, so I nip quickly through. 9 times out of 10 I'll then look back when I'm up the platform and will see that GWR staff have opened the barriers due to the all the masses of other passengers all scrambling to get onto the platform.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,730
Location
West of Andover
The last three times I've boarded a train at Paddington the barriers were opened due to the rush of people. I always arrive at Paddington and look on RTT to see what platform my train departs from, or I look at the arrival board to see what platform it will be arriving into. I then position myself by the barrier to the relevant platform so I can be first onto the train and get a good seat. The platform number than eventually appears on the departure board and boarding is permitted, so I nip quickly through. 9 times out of 10 I'll then look back when I'm up the platform and will see that GWR staff have opened the barriers due to the all the masses of other passengers all scrambling to get onto the platform.

Paddington is quite good at having the barriers at the main concourse end in operation when having the barriers on the overbridge wide open.
 

Mainsideman

Member
Joined
6 Jul 2018
Messages
254
Location
Croydon
Waterloos barriers are closed from start of service to end of service, approximately 20 hours a day. The longest I am aware off.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,953
Location
London
I am sure they do, and do absolutely nothing about them.

It certainly used to be part of station performance metrics (KPIs and such) pre-pandemic, although not sure it's followed up on much.
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,990
Paddington is quite good at having the barriers at the main concourse end in operation when having the barriers on the overbridge wide open.
At least according to https://www.networkrail.co.uk/wp-content/uploads/2021/08/London-Paddington-Station-Map.pdf, the barriers at paddington appear to be quite a mess, with seperate sets of barriers for 2-5, 6/7 and 10-12, no barriers at all for platforms 1,8 and 9 and the barriers for 6/7 to the overbridge being on the platform, laeving the "country" end of those platforms unbarriered.

I presume the mess is a result of trying to accomodate heathrow express oyster/contactless fares.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,243
At least according to https://www.networkrail.co.uk/wp-content/uploads/2021/08/London-Paddington-Station-Map.pdf, the barriers at paddington appear to be quite a mess, with seperate sets of barriers for 2-5, 6/7 and 10-12, no barriers at all for platforms 1,8 and 9 and the barriers for 6/7 to the overbridge being on the platform, laeving the "country" end of those platforms unbarriered.
Paddington is a bit of a ‘work in progress’, platforms 8/9 have an approved planning application, (Apr 2021), the drawings show P2-14 within one common gated area. P8/9 will no longer be a public thoroughfare.

Is it currently being done? Or yet to start?
 
Joined
9 Dec 2012
Messages
835
Aren't barriers meant to be a security measure as well, what's the point in going to the expense of having them just to leave them open at night when that's when people are most vulnerable to being mugged on board etc.
 

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
Moor Street seems to have the barriers open a lot less often the New Street does!
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,990
Aren't barriers meant to be a security measure as well,
Reducing the number of undesirables on the network is certainly an affect of barriers, but I don;t think it's the main reason for putting them in.

what's the point in going to the expense of having them just to leave them open at night
The point of measures like ticket barriers and penalty fare schemes is to get the "pay when challenged" crowed to actually pay.

Singles in the UK are usually barely cheaper than day returns, so on local services you really only need to "grip" each passenger once on a given day to extract the fare, with a penalty fares scheme in place you probably don't even need that. By the late evening most passengers have paid already, so the return on investment of further ticket checking is likely fairly small
 
Joined
9 Dec 2012
Messages
835
Reducing the number of undesirables on the network is certainly an affect of barriers, but I don;t think it's the main reason for putting them in.


The point of measures like ticket barriers and penalty fare schemes is to get the "pay when challenged" crowed to actually pay.

Singles in the UK are usually barely cheaper than day returns, so on local services you really only need to "grip" each passenger once on a given day to extract the fare, with a penalty fares scheme in place you probably don't even need that. By the late evening most passengers have paid already, so the return on investment of further ticket checking is likely fairly small
But the undesireables are most likely not to have a ticket either or at least the correct one if they know barriers are always open.
By the late evening certainly on the Southeastern metro area it's pretty much a freebie with barely any likelihood of being challenged, checked or issued a penalty fare. I imagine similar on others around London.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,278
They can be - provided there is a video link to somewhere staff are. This is done for some stations' rear exits such as Exeter Central
Yes, but the member of staff still needs to be at the station. What would be much more powerful and allow almost all stations to be gated for longer is someone in a central control room doing that monitoring at multiple stations.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,554
Yes, but the member of staff still needs to be at the station. What would be much more powerful and allow almost all stations to be gated for longer is someone in a central control room doing that monitoring at multiple stations.
I expect that is out of the question due to emergency procedures.
 

Fenchurch SP

Member
Joined
11 Jan 2021
Messages
207
Location
Merstham
Yes, but the member of staff still needs to be at the station. What would be much more powerful and allow almost all stations to be gated for longer is someone in a central control room doing that monitoring at multiple stations.
While paper tickets are still being used you would need somebody to retrieve them when they get stuck in the machine.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,848
Some places can't retrieve tickets if swallowed even now, according to people I know
Not 'can't' but 'won't'. If it's not possible to get tickets back out what happens when the bin is full?
 

johntea

Established Member
Joined
29 Dec 2010
Messages
3,029
While paper tickets are still being used you would need somebody to retrieve them when they get stuck in the machine.

Not just stuck but many barriers still don't even accept the basics!

e.g. I bought a Castleford - Manchester return, which the barriers at Leeds outright reject for whatever reason despite being a perfectly valid (in fact perhaps the only valid!) route, so to break the journey there just to get a coffee on the main concourse or whatever I have to find a member of staff to let me out and back in manually, they still haven't sorted it after many years (a paper based ticket, perhaps eTicket would work)
 

ert47

Member
Joined
28 Feb 2010
Messages
688
Not 'can't' but 'won't'. If it's not possible to get tickets back out what happens when the bin is full?
I'm only familiar with the Cubic E1/E2 gates used around the Southern network (similar machines are used by other TOCs and TfL)

Some older gates have a mechanism that holds the last 5 (or so) tickets before they go into the bin within the gate which makes ticket retrieval easy.

However many of the newer type machines dump all the tickets straight into the bin. They're not always going to end up in the same position every time - which means if the bin hasnt been emptied for a while (many people may have used the gates during the course of the day), it can take some time to locate an errant ticket.

IIRC there was something about the ticket count being messed up if you were to remove the bin in the newer gates.
 

riceuten

Member
Joined
23 May 2018
Messages
939
Not just stuck but many barriers still don't even accept the basics!

e.g. I bought a Castleford - Manchester return, which the barriers at Leeds outright reject for whatever reason despite being a perfectly valid (in fact perhaps the only valid!) route, so to break the journey there just to get a coffee on the main concourse or whatever I have to find a member of staff to let me out and back in manually, they still haven't sorted it after many years (a paper based ticket, perhaps eTicket would work)
I have this frequently, on the rare occasions that the gates are in operation at the weekend in Stevenage. The gates reject tickets that have been bought with a Network Card (I presume to check if you actually have one). But the reality is that the staff are too busy dealing with the fare dodgers and just wave you through. I have my SmartCard programmed to apply a Network Card discount (which it does sporadically) and never get stopped on the rare occasions the gates are operational and there's someone around.
 

43172

Member
Joined
7 Oct 2020
Messages
161
Location
South west England
Not just stuck but many barriers still don't even accept the basics!

e.g. I bought a Castleford - Manchester return, which the barriers at Leeds outright reject for whatever reason despite being a perfectly valid (in fact perhaps the only valid!) route, so to break the journey there just to get a coffee on the main concourse or whatever I have to find a member of staff to let me out and back in manually, they still haven't sorted it after many years (a paper based ticket, perhaps eTicket would work)

I have that issue when travelling to/from Paddington, so much so i'm more surprised when the ticket barriers open without rejecting my ticket. It's also happened at Birmingham New Street, having once had an Exeter to Birmingam International ticket rejected when trying to change platforms. It does happen at other stations every so often but both Paddington and Brimingham NS can be a pain.

I quite often travel to Exeter St Davids, yet apart from the evenings it can be a random guess wether the barriers will be open during the day, sometimes they can be open at mid morning yet other times not.
 

BurtonM

Member
Joined
3 Feb 2014
Messages
975
Location
Manchester
I generally find the gates are closed and in use at Manchester Piccadilly, but they're open occasionally.

However they're completely pointless as everyone knows you can get around them using the lift from the street to P13/14, and just use the overbridge to get to any platform.
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,990
I use that lift from time to time and I rarely see anyone else using it. So either the faredodgers don't know about it, i'm not travelling at the same time as the faredodgers or the risk of being "gripped" by a memeber of rail staff when leaving the lift is too high.
 

Mainsideman

Member
Joined
6 Jul 2018
Messages
254
Location
Croydon
Yes, but the member of staff still needs to be at the station. What would be much more powerful and allow almost all stations to be gated for longer is someone in a central control room doing that monitoring at multiple stations.
This would never work for busy stations..
 

Parallel

Established Member
Joined
9 Dec 2013
Messages
4,508
The barriers at Swindon always seem to be open when I use that station, even with the gateline staff just stood next to them. They seem to be opened whenever a train arrives on Platform 4, probably to mitigate passengers queuing down the stairs. I think they should be moved further out of the subway towards the ticket office/lobby, with potentially a new entry point needed for the ticket office. Either way, the current set up isn't really fit for purpose.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,394
Location
A typical commuter-belt part of north-west England
Since automatic ticket barriers are a subject of this thread, as one who sees North-West England as home territory, why are the banks of barriers at Manchester Victoria station of a different type to those more recently introduced elsewhere in the region? Are there any plans to replace these with the newer versions?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,278
Since automatic ticket barriers are a subject of this thread, as one who sees North-West England as home territory, why are the banks of barriers at Manchester Victoria station of a different type to those more recently introduced elsewhere in the region? Are there any plans to replace these with the newer versions?
They were just the ones which Northern (and East Coast) specified when they had their first wave of gafeline installation. As I recall, they are also fitted at Manchester Oxford Road and Blackpool North (and were fitted at Leeds).
 
Status
Not open for further replies.

Top