Jamiescott1
Member
- Joined
- 22 Feb 2019
- Messages
- 1,111
I had completely forgot about this until I just recieved my generic cut and paste reply from gwr complaints department.
On 16th March (I think) I caught the 1556 from Paddington with the aim to connect to the marlow single track branch.
The 1556 was delayed on journey so arrived approx 4 minutes after the Marlow train was due to depart maidenhead.
My argument to gwr was that as the Marlow train has an 18 minute dwell time in marlow before it returns to maidenhead why couldn't it of waited 6 minutes (4 minutes + 2 mins connection time at maidenhead).
There was 16 people wanting to connect onto the marlow train from the 1556 Paddington departure.
Why couldn't the marlow train of waited ?
*date edited
On 16th March (I think) I caught the 1556 from Paddington with the aim to connect to the marlow single track branch.
The 1556 was delayed on journey so arrived approx 4 minutes after the Marlow train was due to depart maidenhead.
My argument to gwr was that as the Marlow train has an 18 minute dwell time in marlow before it returns to maidenhead why couldn't it of waited 6 minutes (4 minutes + 2 mins connection time at maidenhead).
There was 16 people wanting to connect onto the marlow train from the 1556 Paddington departure.
Why couldn't the marlow train of waited ?
*date edited
Last edited:
