I was just wondering why Kings Cross Thameslink had to be closed when St Pancras opened. The stations are actually a fair distance apart, certainly further apart than Blackfriars and City Thameslink and I would imagine that Kings Cross Thameslink was actually a good deal more convenient for lots of people - the St Pancras station is a bit out on a limb relly, though good for changing onto other services.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
Because the platforms were too narrow for the growing numbers of people using Thameslink and also too short for the 12-coach trains that will be coming in.
It has no escalators or lifts, so is no use for less able passengers.

Yes, the low-level platforms at StP are a bit away from the Tube but that will change when the new LUL Northern ticket hall opens
 

mackenzie_blu

Member
Joined
14 Nov 2008
Messages
493
Location
Zone 3 - Northern Line
Fact upgrading Kings Cross Thameslink would have cost nearly as much as building St Pancras International. from a customer point of view St Pancras was the only senseble opition. Plus it gives way better connections.
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
Does it? Not to King's cross main platforms 1-8, or the tube lines it doesn't!

It takes no longer to P8 from St Pancras Thameslink than it does to P1 from King's Cross Thameslink. I know, because I've checked it.
And it's a lot safer, because you only have to cross one road.

And as I've already said, it will be quicker to the Tube when the new Northern ticket hall opens
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
It takes no longer to P8 from St Pancras Thameslink than it does to P1 from King's Cross Thameslink. I know, because I've checked it.
And it's a lot safer, because you only have to cross one road.

And as I've already said, it will be quicker to the Tube when the new Northern ticket hall opens

You're right there, I went the long way from Kings Cross to St Pancras as in straight down platform 8, go outside then go though the LUL ticket hall, though St Pancras pass the old MML platforms and down the stairs to the FCC platforms.

Found out later that it was just so much quicker leaving the suburban platforms at Kings Cross and just crossing that one road and you're there at St Pancras.
 

mackenzie_blu

Member
Joined
14 Nov 2008
Messages
493
Location
Zone 3 - Northern Line
Does it? Not to King's cross main platforms 1-8, or the tube lines it doesn't!

Agreed the SSL connection is crap but the mainline connect and with everything thats about to happen to Kings Cross puts the new station at the heart of it. As said the new Tube ticket hall and the Kings Cross concourse will be alot closer to St Pancras than Kings Cross ever could be.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
It takes no longer to P8 from St Pancras Thameslink than it does to P1 from King's Cross Thameslink. I know, because I've checked it.
And it's a lot safer, because you only have to cross one road.

And as I've already said, it will be quicker to the Tube when the new Northern ticket hall opens

Sorry I dont agree. Unless you arrive at Platform 8 in Kings Cross I reckon you have allow at least 5 mins longer to connect between a ECML service and a southbound Thameslink train than you had to when Kings Cross Thameslink was open.
The distance from platforms 1 to 7 to St Pancras Low Level is almost twice that to the kings Cross Thameslink Platforms and the pedestrian flows leaving kings cross station towards St Pancras are very poor.

Prior to St Pancras opening I used Thameslink to east Croydon changing there for my Southern service home. However its now 10 to 15 mins quicker to get the Victoria line to Victoria.
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
Sorry I dont agree. Unless you arrive at Platform 8 in Kings Cross I reckon you have allow at least 5 mins longer to connect between a ECML service and a southbound Thameslink train than you had to when Kings Cross Thameslink was open.
The distance from platforms 1 to 7 to St Pancras Low Level is almost twice that to the kings Cross Thameslink Platforms and the pedestrian flows leaving kings cross station towards St Pancras are very poor.

Prior to St Pancras opening I used Thameslink to east Croydon changing there for my Southern service home. However its now 10 to 15 mins quicker to get the Victoria line to Victoria.

If you're lucky enough to come into P1 and catch a green man at all of the (at least) three sets of traffic lights you have to negotiate, it may be a little quicker. It takes me about seven minutes to walk at a moderate-to-slow pace from FCC platforms at St Pancras to the Info point on the KX concourse, something which I have to do often because I'm assisting less mobile passengers. At my own pace, it takes four minutes.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
Sorry I dont agree. Unless you arrive at Platform 8 in Kings Cross I reckon you have allow at least 5 mins longer to connect between a ECML service and a southbound Thameslink train than you had to when Kings Cross Thameslink was open. . .
It depends on several factors.
I used to love dashing out the east exist of KGX up to the Thameslin stn - if I could. BUT, I also tried it with a friend in a wheel chair and on another occasion, with a bike - I could imagine anyone with suitcases on their way to Gatwick would be equally frustrated.
Very slow and really, pretty much impossible. No lift. and as someone said, short platforms. But I'll miss the place and I DO NOT find the FCC platforms in St P easy or quick to get to. And I resent the poor signage which no longer uses the word "Thameslink" even though we all know that's what we're looking for.
 

williamn

Established Member
Joined
22 May 2008
Messages
1,659
Yes dont like the signage at StP.
It must be very confusing for passgengers who don't know who operates their trains. The departures board is also split up per operator but nothing to point this out, you just have to work it out.

I wrote to point this out but never got a reply.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,238
Location
Yorkshire
The fact we're even having this debate proves that it is very inconvenient! It was a chance to make a fantastic interchange that was undisputed easier from all lines - and it failed. A missed opportunity. :|

Already you see congestion to go upstairs when a busy train arrives. Imagine when 12 car trains arrive every couple of minutes....

Unless they are planning to make build escalators I can see trouble ahead.

There should be escalators and walkways going down to the deep tube lines, in addition to the escalator going up.

Victoria Line to Thameslink must be a popular interchange, given how busy the Victoria line is. Yet that is now infinitely harder than it was before!
 

Tom C

Member
Joined
4 Jul 2005
Messages
549
I was just wondering why Kings Cross Thameslink had to be closed when St Pancras opened. The stations are actually a fair distance apart, certainly further apart than Blackfriars and City Thameslink and I would imagine that Kings Cross Thameslink was actually a good deal more convenient for lots of people - the St Pancras station is a bit out on a limb relly, though good for changing onto other services.

Kings Cross Thameslink was a much better interchange station than St Pancras Intl is for the Underground and isn't that great for Kings Cross mainline either if I am honest.

However, Kings Cross Thameslink was very much neglected in its later years and was far to small to cope with the traffic that was there let alone the additonal traffic that STP gets now BF-SV services are running through. It was getting harder and harder to control the crowds and dispatching trains was getting more and more difficult.

As a former Kings Cross Thameslink veteran it was sad seeing the station closed just to see the Thameslink gone name rather than this Capital Connect crap but sadly it was passed its sell by date and although St Pancras has its faults (LOTS of them) it is an improvement in the long term.
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
The fact we're even having this debate proves that it is very inconvenient! It was a chance to make a fantastic interchange that was undisputed easier from all lines - and it failed. A missed opportunity.
It's a project which is still not complete...
Already you see congestion to go upstairs when a busy train arrives. Imagine when 12 car trains arrive every couple of minutes....

Unless they are planning to make build escalators I can see trouble ahead
And what about the congestion at King's Cross? Where there was no escalators and no lifts? St Pancras gives you three routes up to the concourse, rather than King's Cross's one.
There should be escalators and walkways going down to the deep tube lines, in addition to the escalator going up.
That would be a long convoluted walk from platfrom level. What's wrong with going up to the main concourse, along to the Pancras Road exit and down the escalators there when they open?
Victoria Line to Thameslink must be a popular interchange, given how busy the Victoria line is. Yet that is now infinitely harder than it was before!
See above. As I keep saying, when the LUL have finished the new Northern Ticket Hall, the access to the Victoria, Piccadilly and Northern lines will be much easier and quicker.
St Pancras can't be blamed for that, their end is ready.
--- old post above --- --- new post below ---
And I resent the poor signage which no longer uses the word "Thameslink" even though we all know that's what we're looking for.
FCC stated that the word Thameslink was not be used on any signage.
 
Last edited:

williamn

Established Member
Joined
22 May 2008
Messages
1,659
The new Northern ticket hall wont mean its quicker to get the the actual tube platforms, you'll just enter the station earlier and walk underground rather than overground!
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
The new Northern ticket hall wont mean its quicker to get the the actual tube platforms, you'll just enter the station earlier and walk underground rather than overground!

Er, yes it will, because instead of walking all the way up the St Pancras concourse, and then all the way through the LUL ticket hall to the Pic/Vic barriers you will take the 'diagonal' route under Pancras Road.
Think of Pythagoras!
 

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
Does it? Not to King's cross main platforms 1-8, or the tube lines it doesn't!

I would disagree regarding King's Cross main. Having arrived at St Pancras Int on a 319 yesterday evening, I found it much easier to get to KX than I would have done from KX Thameslink - a much wider platform, escalators rather than stairs to contend with, and only one (rather quiet) road to cross then into the side entrance by platforms 9-11. Coming out of KX Thameslink, I would have had to dodge lots of other pedestrians and cross Kings Cross Road, Pentonville Road and York Way, all of which seem to be permanently busy with traffic.
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
Er, pendtic point here, they wont refer to the service as Thameslink but there are plenty of signage that use the word Thameslink. And the internal stuff complete refers to it as the "Thameslink Route"

I know, but for St Pancras, they were quite specific that the word Thameslink was not to be used, in order to differentiate it from King's Cross. Even though, as you say, they still call it the Thameslink route, and they have City Thameslink & West Hampstead Thameslink stations.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
Er, pendtic point here, they wont refer to the service as Thameslink but there are plenty of signage that use the word Thameslink. And the internal stuff complete refers to it as the "Thameslink Route"

There IS NOT "plenty of signage that uses the word Thameslink" in St Pancras. Possibly none at all! And if a traveller needs signs to help them find their way, then the signs had better identify whatever the traveller is looking for!
If I arrive at KGX knowing that KingsCross Thameslink has moved then I expect signs with the word Thameslink. Simple.
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
There IS NOT "plenty of signage that uses the word Thameslink" in St Pancras. Possibly none at all! And if a traveller needs signs to help them find their way, then the signs had better identify whatever the traveller is looking for!
If I arrive at KGX knowing that KingsCross Thameslink has moved then I expect signs with the word Thameslink. Simple.

That was the point that was being made :roll:
And the reasons why are explained above.
 

Lee_Again

Member
Joined
29 Sep 2007
Messages
691
Location
Stevenage
Where ever the location of the station you'll never please everyone, but as I have said before, the biggest crime for the new station is that it only has two platforms.

The cost of providing the extra faces would have been minimal and the incease in operating flexability would have been enormous.
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
Where ever the location of the station you'll never please everyone, but as I have said before, the biggest crime for the new station is that it only has two platforms.

The cost of providing the extra faces would have been minimal and the incease in operating flexability would have been enormous.

I *think*, and I could very well be wrong here, it's mainly because of the very tight curve at the South end. Any train that was in a platform to the East of the existing Platform A, would face a tortuous route across the pointwork to get out.
Having said all that, with the rebuilding at Blackfriars and London Bridge, would it really be necessary?
 

Lee_Again

Member
Joined
29 Sep 2007
Messages
691
Location
Stevenage
I take your point (EM2) about the rebuilding work, and possibly the southern end problem.

However, the dwell time at St Pancras is quite long compared to other stations in that section. Having the ability to put two units in together could speed up getting the trains out of section, especially if the outside platforms could connect straight on to the ECML connection without having to run in front of a MML service.

I can see trains on the ECML blocking the entrance to Kings Cross if it is held to wait for a train standing in the existing platforms.

Incidently, does anybody know if the layout between Copenhagen and Gasworks is going to be upgraded. At present, there would be conflicting moves between south running trains going to St Pancras and north bound Kings Cross departures. If the exisiting four tracks were moved across one tunnel to the east (in to the spare tunnel) the 'free' tunnel could be used for direct access to St Pancras. There is plenty of space to have a grade seperated junction north of Copenhagen. Thoughts...
 

EM2

Established Member
Joined
16 Nov 2008
Messages
7,522
Location
The home of the concrete cow
The rumour is that once the 319s are gone, dwell times are going to be reduced. However, the door opening system on the 377s is having problems, so the dwell times are actually getting longer!
 

mackenzie_blu

Member
Joined
14 Nov 2008
Messages
493
Location
Zone 3 - Northern Line
Dwell times at St Pancras are high as its a recovery point with extra time built into the timetable. Part of the reason for that is all Thameslink route trains get a PPM twice on its jounery so the timing are padded up to decrease risk of double PPM from a single late runner.

Once the new trains come in and the 319 and 377 are gone average dwell time is supposed to be 90 seconds from doors openning to doors closing.

As for the Thameslink/ECML connection, they aren't fully decided yet how its going to be. But I think the plans should be in the pipeline as its supposed to be finish ahead of 2015 openning date for services. Latest rumour is when 12 trains run through the Core in 2012, some ECML will be among them.

As for signage I thought you meant generally Thameslink wasn't being used, not at St Pancras. Not to mention Thameslink was another companies tradename. And there is still a few Thameslink sign in the Tube part, tho in TfL style. To be honest I thin k this is one point where who ever takes over from FCC should rename the franchise Thameslink and keep the name. Ie NX Thameslink for example. People know the Thameslink name and it should stand out like Crossrail will be doing in ten years time.
 
Status
Not open for further replies.

Top