• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Why are the centre platforms at Edgware Road (Sub-Surface) through platforms

A60stock

Member
Joined
26 Aug 2019
Messages
236
Location
London
Is there a reason why the centre platforms at Edgware Road are not bay platforms? They are almost always, exclusively used for terminating trains. How often do through trains use them?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,317
Location
London
Is there a reason why the centre platforms at Edgware Road are not bay platforms? They are almost always, exclusively used for terminating trains. How often do through trains use them?
I believe it is because when Edgware Road was rebuilt in the 1920s it was for a planned extension of the Metropolitan line that split between Edgware Road and Paddington. The plan was cancelled after it was built and presumably they have been retained for flexibility. Not much point paying to resignal them.
 

etr221

Established Member
Joined
10 Mar 2018
Messages
1,602
Short answer - because it was designed, back in the 1920s, it was around a very different service specification, that didn't include lots of (if any) terminating trains. And giving flexibility for future developments.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,677
Location
2 miles and 50 years away from the Longmoor Milita
Is there a reason why the centre platforms at Edgware Road are not bay platforms? They are almost always, exclusively used for terminating trains. How often do through trains use them?
In my twelve years of near-daily use*, I was on some services that used platforms 2 or 3 to / from Baker Street.
It was typically when balancing a serrvice, or occurenxe of a problem with a train already in platform 1 or platform 4.

The rarest, was when a country-bound Met Line service was mis-routed at Baker Street! I was at Edgware Road, waiting for my H+CL train - and a pair of A60/A62 stock, with many confused / annoyed faces inside, rolled into platform 2.
I guess Edware Road was the first possible place to cross it back over for an eastward return; I suspect it was then taken out of service at Great Portland Street, rather than it doing another crossback at Kings Cross.

* I used Edgware Road CL/H+CL station, for commuting, 1998 to 2012 (two years from + to Liverpool Street, then five years from + to West Brompton / Earls Court, then seven years from / to Docklands).
 

Mldaureol

Member
Joined
5 Mar 2023
Messages
21
Location
Humberstone
Is there a reason why the centre platforms at Edgware Road are not bay platforms? They are almost always, exclusively used for terminating trains. How often do through trains use them?

I believe it was because decades ago Edgware Road was not a terminus Station.
The district line service used to run through Edgware Road and terminate at a bay platform at Liverpool St (no longer there).
The circle line was also a true circle running continuously around through out the day.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,691
Location
Nottingham
I believe it is because when Edgware Road was rebuilt in the 1920s it was for a planned extension of the Metropolitan line that split between Edgware Road and Paddington. The plan was cancelled after it was built and presumably they have been retained for flexibility. Not much point paying to resignal them.
There was a plan for a curve east of Edgware Road to join up with the line towards Finchley Road - I'm not aware of any other junction being planned on the Paddington side.

Making the centre platforms bays would create a level route behind the buffer stops (assuming there is enough space there) for people whose interchanges are not across the same island, although this would be at one extreme end of the train so maybe not that helpful.
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,154
Location
JB
No, the junction was planned to the west of Edgware Road, between Edgware Road and Praed Street Junction - @Benjwri is correct.

This archive image of the erstwhile signal cabin shortly after opening shows the planned junction painted out on the diagram.

29116910370_95320b77ac_z.jpg


As mentioned, the station would have handled a higher number of through services had this gone ahead, necessitating a more flexible layout. This was also very much the mantra at the time, and was largely mirrored at Whitechapel at the east end.

The platforms certainly had daily booked workings prior to September 2019, but I haven't recently studied at C&H WTT in depth to confirm. They are incredibly useful 'get out of jail' cards at a busy junction station and crew relief point like Edgware Road, and the SSR as a whole would suffer without them.

I must say there is quite a lot of alternative history in this thread and I would treat much of it with caution. The Liverpool Street bay platform was almost exclusively the domain of fast, locomotive-hauled Metropolitan line services, for instance. 'Top side' District services were generally either part of the combined Met/District Inner Circle or were specials working to/from the District proper. That's not to say they would have never used the bay road, particularly after the end of locomotive hauled services, but it wasn't at all a regular proposition or reason for its use.

Idle speculation is one thing but contradicting the many printed and accurate histories of the Underground is a concerning modern trend - in fact checking my own work I've found a completely invented date for something, which I won't repeat here.

== Doublepost prevention - post automatically merged: ==

In my twelve years of near-daily use*, I was on some services that used platforms 2 or 3 to / from Baker Street.
It was typically when balancing a serrvice, or occurenxe of a problem with a train already in platform 1 or platform 4.

The rarest, was when a country-bound Met Line service was mis-routed at Baker Street! I was at Edgware Road, waiting for my H+CL train - and a pair of A60/A62 stock, with many confused / annoyed faces inside, rolled into platform 2.
I guess Edware Road was the first possible place to cross it back over for an eastward return; I suspect it was then taken out of service at Great Portland Street, rather than it doing another crossback at Kings Cross.

* I used Edgware Road CL/H+CL station, for commuting, 1998 to 2012 (two years from + to Liverpool Street, then five years from + to West Brompton / Earls Court, then seven years from / to Docklands).
Generally speaking such services would have been detrained at Baker Street, and then a convoluted shunting procedure to get the train to reverse inner to outer via the west end Edgware Road. A stock were overlength for the centre roads, and even in days gone by was avoided whenever possible, so I suspect the points immediately to the east of Baker Street were otherwise unavailable. Worth noting that platform 2 is also only accessible to eastbound trains and not from the Baker Street direction. The time scale certainly supports a more disciplined approach rather than some of what happened in much older times.

Return would almost certainly have been empty to Moorgate bay roads and return to the Met from there - there is a wrong-road shunt east of Baker Street (at the time this would also have not required using the above mentioned crossover) but given the delays this would have caused I suspect it unlikely. At the time King's Cross was also a mainline shunt outer to inner to the east of the station, so just as disruptive.
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,691
Location
Nottingham
No, the junction was planned to the west of Edgware Road, between Edgware Road and Praed Street Junction - @Benjwri is correct.

This archive image of the erstwhile signal cabin shortly after opening shows the planned junction painted out on the diagram.
Noted thanks, I assume you refer to the patch to the right of "Road".

This doesn't make a lot of sense operationally though - the extra trains using this route would either have fed straight into the Baker Street bottleneck or would have had to terminate at Edgware Road ... which would only have needed bay platforms ...
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,770
Noted thanks, I assume you refer to the patch to the right of "Road".

This doesn't make a lot of sense operationally though - the extra trains using this route would either have fed straight into the Baker Street bottleneck or would have had to terminate at Edgware Road ... which would only have needed bay platforms ...
It would have gone to Finchley Road, then it was decided that building the Bakerloo/Jubilee line there instead was a more sensible idea
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,506
Location
London
In my twelve years of near-daily use*, I was on some services that used platforms 2 or 3 to / from Baker Street.
It was typically when balancing a serrvice, or occurenxe of a problem with a train already in platform 1 or platform 4.

The rarest, was when a country-bound Met Line service was mis-routed at Baker Street! I was at Edgware Road, waiting for my H+CL train - and a pair of A60/A62 stock, with many confused / annoyed faces inside, rolled into platform 2.
I guess Edware Road was the first possible place to cross it back over for an eastward return; I suspect it was then taken out of service at Great Portland Street, rather than it doing another crossback at Kings Cross.

* I used Edgware Road CL/H+CL station, for commuting, 1998 to 2012 (two years from + to Liverpool Street, then five years from + to West Brompton / Earls Court, then seven years from / to Docklands).

I wasn't quite as regular at Edgware Road but like you went Eastbound to/from Platforms 2 and 3. Never saw A Stock at Edgware Road though. That would have been quite the thing!
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,677
Location
2 miles and 50 years away from the Longmoor Milita
I wasn't quite as regular at Edgware Road but like you went Eastbound to/from Platforms 2 and 3. Never saw A Stock at Edgware Road though. That would have been quite the thing!
@bluegoblin7 has corected (thanks! 8-) ) my memory of platforms' numbering; I guess I meant platform 3 not 2.
As the A stock rumbled its way towards me, from Baker Street CL, I saw the twin headlights and I had a "WTF?!" moment...!

Superb archive photo btw @bluegoblin7 !
 

A60stock

Member
Joined
26 Aug 2019
Messages
236
Location
London
The rarest, was when a country-bound Met Line service was mis-routed at Baker Street! I was at Edgware Road, waiting for my H+CL train - and a pair of A60/A62 stock, with many confused / annoyed faces inside, rolled into platform 2.
I guess Edware Road was the first possible place to cross it back over for an eastward return; I suspect it was then taken out of service at Great Portland Street, rather than it doing another crossback at Kings Cross.
Now this is what I really want to hear more about! So was it in service at Baker Street? I.E. did it call at the H/C & Circle line platforms. If it was mis-routed, they wouldn't have known to take it out of service before Baker Street?

I wonder why that would annoy passengers, unless it caused a delay for trains behind it?!
 

paul332

Member
Joined
9 Nov 2007
Messages
71
Once upon a time trains ran from Edgware Road, using the central platforms, to New Cross / New Cross Gate via the St Mary's curve.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,677
Location
2 miles and 50 years away from the Longmoor Milita
Now this is what I really want to hear more about! So was it in service at Baker Street? I.E. did it call at the H/C & Circle line platforms. If it was mis-routed, they wouldn't have known to take it out of service before Baker Street?

I wonder why that would annoy passengers, unless it caused a delay for trains behind it?!
Lots of insider-insight in post 7. The bottom third of that post, I think answers your q's. :)

Commuters are creatures of habit: same train service, same carriage. It's a bit of a subconscious "comfort-through-routine" behaviour. When that routine gets broken, uncertainty and, for some, frustration and annoyance will manifest within them.

So, for those folk, who had boarded "their" Watford / Amersham / Chesham service, from one of the City of London area stops, their routine is crushed when their service goes west instead of north-west...

No chance of de-training at Edgware Road: as @bluegoblin7 explained in Post 7, A stock was overlength for its centre roads.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,399
Location
Hertfordshire / Teesdale
No, the junction was planned to the west of Edgware Road, between Edgware Road and Praed Street Junction - @Benjwri is correct.

This archive image of the erstwhile signal cabin shortly after opening shows the planned junction painted out on the diagram.

I’ve never really understood the rationale for why this was ever proposed, let alone got as serious as appearing on the signal diagram. Edgware Road isn’t a particularly important station from a passenger point of view, it’s always enjoyed a somewhat inflated status because of its operational location. I can see no benefit at all in running Metropolitan main trains through there. A far more worthwhile scheme would have been finding a way to grade-separate the junction at Baker Street, in fact given all the other schemes LT did over the years it’s somewhat surprising this never got tackled.


29116910370_95320b77ac_z.jpg


As mentioned, the station would have handled a higher number of through services had this gone ahead, necessitating a more flexible layout. This was also very much the mantra at the time, and was largely mirrored at Whitechapel at the east end.

The platforms certainly had daily booked workings prior to September 2019, but I haven't recently studied at C&H WTT in depth to confirm. They are incredibly useful 'get out of jail' cards at a busy junction station and crew relief point like Edgware Road, and the SSR as a whole would suffer without them.

I must say there is quite a lot of alternative history in this thread and I would treat much of it with caution. The Liverpool Street bay platform was almost exclusively the domain of fast, locomotive-hauled Metropolitan line services, for instance. 'Top side' District services were generally either part of the combined Met/District Inner Circle or were specials working to/from the District proper. That's not to say they would have never used the bay road, particularly after the end of locomotive hauled services, but it wasn't at all a regular proposition or reason for its use.

Idle speculation is one thing but contradicting the many printed and accurate histories of the Underground is a concerning modern trend - in fact checking my own work I've found a completely invented date for something, which I won't repeat here.

== Doublepost prevention - post automatically merged: ==


Generally speaking such services would have been detrained at Baker Street, and then a convoluted shunting procedure to get the train to reverse inner to outer via the west end Edgware Road. A stock were overlength for the centre roads, and even in days gone by was avoided whenever possible, so I suspect the points immediately to the east of Baker Street were otherwise unavailable. Worth noting that platform 2 is also only accessible to eastbound trains and not from the Baker Street direction. The time scale certainly supports a more disciplined approach rather than some of what happened in much older times.

ISTR, maybe incorrectly, that Edgware Road could handle 8-car trains until signalling modifications some time around the 1990s when changes were made to address compromised overlaps across the site. Everything was then optimised for 6 cars of C stock, starting signals were moved, and possibly some draw-up signals were added. I have the traffic circular entry somewhere, though in paper form as this was pre PDF days!
 

penfold22

Member
Joined
4 Aug 2026
Messages
7
Location
Baldock
Edgware Road was never designed for 8-car trains - but could handle them under certain circumstances and using certain moves.
During my time as resident signaller, I can recall 3 or 4 such movements (where A-stocks were sent to Edgware Road). They had to be routed through platform 3 (one occasion proved why when it was routed through platform 4 and caused damage to coping stones - I was not on!)

There were several compromised and non-existent overlaps in the area, and until rewiring you could clear most of the shunt signals onto occupied sections - a throw back from steam/loco hauled services running around trains.

In mid 1996 the area was rewired and the aforementioned overlaps and shunt signals were changed, and a number of signals became timed to clear at certain speeds - this is mainly how they achieved the increased overlaps without redesigning/rebuilding the whole area. I was the last person to operate the old system and first to operate the new, and it was quite a culture shock to suddenly not be able to do some of the "quick" moves I was used to - Edgware Road was a pretty fast signal cabin area. It still was post re-wiring, but certain moves were no longer possible.

I believe it was in later years not long before the introduction of S-Stock that the area was again revisited, and a number of signals were equipped with "VSS - Variable Speed Signalling." This was almost like many are used to on motorways, except a little cruder. Dependant on position of levers etc. certain signals showed the T/Op a target speed. The system was very basic, and this speed would be displayed as a "one-shot" and would never update as trains ahead moved off. So in theory a train could approach a signal and be given a "20mph" and could then proceed to sit there for some time and the speed would never update.

As for using the middle platforms, they are generally timetabled for reversing trains, but can still be used to run trains past others - 3 or 4 trains did such a move yesterday evening in fact as we had a couple of minor issues.

One final couple of points - which I always used to give to visitors. The cabin building was the oldest building to have been built for its purpose on the entire combine. Another fact I could never find solid proof on - but I was always told in my earlier years - was that the signal frame and associated equipment were never intended for that location. This apparently explains some of the layout of the equipment which in some areas looks to have been shoe-horned into the cabin. The picture bluegoblin7 has posted makes the cabin look a lot roomier than it felt.
 

etr221

Established Member
Joined
10 Mar 2018
Messages
1,602
No, the junction was planned to the west of Edgware Road, between Edgware Road and Praed Street Junction - @Benjwri is correct.

This archive image of the erstwhile signal cabin shortly after opening shows the planned junction painted out on the diagram.

I’ve never really understood the rationale for why this was ever proposed, let alone got as serious as appearing on the signal diagram. Edgware Road isn’t a particularly important station from a passenger point of view, it’s always enjoyed a somewhat inflated status because of its operational location. I can see no benefit at all in running Metropolitan main trains through there. A far more worthwhile scheme would have been finding a way to grade-separate the junction at Baker Street, in fact given all the other schemes LT did over the years it’s somewhat surprising this never got tackled.
Looking in 'A History of London Transport' (Barker and Robbins) there seem to have been various proposals over the years to relieve the Finchley Road-Baker Street bottleneck, trying to come with a scheme that was practicable and affordable. What was done at Edgware Road was perhaps somewhat opportunistic - 'it is desirable to, and we can, rebuild Edgware Road, an underground link north to the extension might be possible, so we'll make some provision...'. Barker and Robbins quote both West Hampstead and Willesden Green as possible junctions with the extension line, which seem to my mind more practicable than bending back to one at Finchley Road: quite where it would have gone had there been a definite proposal to put before parliament I don't know.

I think the reason for the new link being from Edgware Road was the priority being to relieve Finchley Road-Baker Street, rather then Baker Street itself; and wondering if - had a service plan been drafted (no idea whether one was) - it would been based on 'longer distance' trains taking the new link to join the Circle at Edgware Road, and 'shorter distance' ones still going Finchley Road-Baker Street (with few - possibly none in peak hours - going through to the City). It was these 'shorter distance' services that ended up, under LPTB, being transferred to the Bakerloo, under the New Works project that was the solution (?) to the Finchley Road-Baker Street problem.

The other thing I wonder is, if the link from Edgware Rd had come about, whether Praed Street junction would have been redone in grade separated, three way, form.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,499
Location
Taunton or Kent
That the Circle line stopped being the Circle line will partially explain the current layout not matching service patterns.
 

Top