However, I must say that I am a bit sad that this unit looks like it will be a write-off. The Coradia fleet is small enough (27 before this incident), and as a fan of these units, I'm gutted.
I'm no fan of 175s either, very boring looking trains and not particularly special to travel on either (but better in some respects than some trains). However, since the only likely alternative is a class 150 (since ATW refuse to use their LHCS without government funding) turning up on a long distance service the loss of this 175 will mean very inappropriate rolling stock.I'm not particularly fond of the 175s, to work on or indeed to use as a pax. I hope 175002 can be repaired. Don't fancy working a 150 to HHD any time soon!!
Could you clarify that statment please? The way I've interpreted it, you are a train driver for ATW and parked (stabled) the train you were driving at Whitland at the end of your shift and signed off work. However, this clashes completely with the information I've gained from this and other rail fourms that the only stabling point for trains and staffing depot (sign on/off point) for ATW drivers west of Swansea is Carmarthen.I was working out of Whitland last week, and whilst waiting for the taxi after stabling the train, the crossing went down for what turned out to be a pair of trains from either direction.
ATW apparently ran a shuttle service from Clarbeston Road to Milford Haven because of the line blockage. Does anyone know if one line was cleared so they could get a unit in and out of the far-west or was the unit running the shuttle the one that would have been at Fishguard to run the 09:56 at the time of the crash and was hence trapped west of Whitland? If so, and given my ealier point that, to my knowlage, there's no staff depot west of Carmarthen, does anyone know what arangments were made to staff the train and stable it overnight?
