• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Which stations have through platforms with buffer stops on them?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Think the only ones where the rails continue are Kirkby and Ormskirk. Otherwise, there's a fair few ex-through stations that now serve as terminii.
 

will1337

Member
Joined
5 Feb 2008
Messages
613
Location
Laaandaaan
Sheringham has a buffer stop but the line continues over the level crossing to the North Norfolk Railway.

I think that at Ormskirk the rails stop at the end of electrification and there are two sets of buffers.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Highbury and Islington ELL (the old NLL westbound platform) has a through platform leading to a buffer stop slightly beyond, following the recent alterations.
 

andyfrommk

Member
Joined
12 Jan 2011
Messages
202
Milton Keynes Central has buffers on the reversable slow immediatly after the line seperates from the down slow,

Not even space for a single loco looking at it from the platforms.
 
Last edited:

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,254
Location
Yorks
Maybe, but I think the OP means through platforms with buffer stops on them, to which I say:

Platform 1 Hastings.
And Platform 4 at Margate.
 

O L Leigh

Established Member
Joined
20 Jan 2006
Messages
5,609
Location
In the cab with the paper
Well carry on if you like. Personally I don't understand how a platform line can be a "through platform" when there's a set of stops on it.

O L Leigh
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I rather assumed he meant former (or even intended) "through" platforms.
 

miikey

Member
Joined
9 Jan 2011
Messages
79
Ilford has buffers on the bay Platform. Obviously.
Romford, seperate platform. Does that count? :P
 

wintonian

Established Member
Joined
15 Jan 2010
Messages
4,889
Location
Hampshire
Well carry on if you like. Personally I don't understand how a platform line can be a "through platform" when there's a set of stops on it.

O L Leigh

I thought it was me just being thick, but yes I have the same problem.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
Think the only ones where the rails continue are Kirkby and Ormskirk. Otherwise, there's a fair few ex-through stations that now serve as terminii.

The rails aren't joined at either. Kirkby is seperated by a large concrete block built up to the height of the platform. At Ormskirk the rails are seperated by a few feet and at slightly different heights.
 

pendolino

Member
Joined
22 Nov 2010
Messages
737
Does Wimbledon count? There's a set of stops half way down one platform for the tram, but I don't know if the bit beyond the stops is used by trains. Probably not.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Does Wimbledon count? There's a set of stops half way down one platform for the tram, but I don't know if the bit beyond the stops is used by trains. Probably not.

You mean p9/10. Should count: p9 is a bay for trains down to Tooting and the Sutton Loop (FCC) I think, and isn't in use too much, and p10 is now the Croydon Tramlink bay, it was heavy rail for West Croydon (now occupied by the tram), but saying all of this, I think it is physically blocked in the middle by something other than buffers, and was all along.
 

Tufty

Member
Joined
20 Jan 2011
Messages
40
Well carry on if you like. Personally I don't understand how a platform line can be a "through platform" when there's a set of stops on it.

O L Leigh

Are you familiar with Fareham, Kirkby or Ormskirk station's? If so you will know what I mean. If not, imagine two through lines on a regular station with platforms but with one line now blocked by buffers thus preventing a through service (as is Fareham on one line only) Or in the case of Kirkby both through lines have back to back buffer stops preventing a train from making a through journey. However the through journey can proceed by walking from your DMU to the EMU a few yards down the platform past the buffers. phew!
 

pendolino

Member
Joined
22 Nov 2010
Messages
737
You mean p9/10. Should count: p9 is a bay for trains down to Tooting and the Sutton Loop (FCC) I think, and isn't in use too much, and p10 is now the Croydon Tramlink bay, it was heavy rail for West Croydon (now occupied by the tram), but saying all of this, I think it is physically blocked in the middle by something other than buffers, and was all along.

I'll take your word for it, I haven't looked that closely!
 

Bedpan

Established Member
Joined
4 Feb 2010
Messages
1,299
Location
Harpenden
No, Platform 9 is a through bi-directional line used by FCC ( and some Southern trains during the rush hours) - Blackfriars via Tooting in one direction and Blackfriars via the Sutton loop in the other.

Platform 10 is used by the trams at the country end, and as a bay platform for heavy rail (although I can't recall ever having seen anything in it) at the London end. The track for the trams has been raised about 2 feet to compensate for the lower floors on the trams, so that they are ayt platform level.

Prior to Croydon Tramlink (or London Tramlink as its now called) platfornms 9 and 10 were both through lines, 9 being the up line and 10 being the down line. The West Croydon - Wimbledon trains usually used to terminate in platform 9 also.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
Platform 10 is used by the trams at the country end, and as a bay platform for heavy rail (although I can't recall ever having seen anything in it) at the London end.

I have only ever seen one train stabled in there (a Southern 455) about 2 years ago, made me look twice :lol:
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Prior to Croydon Tramlink (or London Tramlink as its now called) platfornms 9 and 10 were both through lines, 9 being the up line and 10 being the down line. The West Croydon - Wimbledon trains usually used to terminate in platform 9 also.

Giving that platform over to the tram system probably seemed a great idea at the time, but I don't think it would happen nowadays. Running twice as many trains round the loop is a NR aspiration once Thameslink is in place, (ie 4 tph Blackfriars to London Bridge) but the present layout isn't too clever for that. It would require 8 calls an hour at Wimbledon, but timekeeping would need to be pretty exact because alternate trains would be in opposite directions.

Is there anywhere else practical to relocate the tram platform - outside the station would probably be a good idea if only to get rid of all those Oyster PAYG questions...
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
Are you familiar with Fareham, Kirkby or Ormskirk station's? If so you will know what I mean. If not, imagine two through lines on a regular station with platforms but with one line now blocked by buffers thus preventing a through service (as is Fareham on one line only) Or in the case of Kirkby both through lines have back to back buffer stops preventing a train from making a through journey. However the through journey can proceed by walking from your DMU to the EMU a few yards down the platform past the buffers. phew!


Although Kirkby and Ormskirk share the same single platform face, the lines are not physically connected to each other so are not through lines despite them having been through lines in years gone by. Kirkby has a large concrete block between the two buffer stops with trains stopping at least 30 feet apart. Ormskirk has around 6 feet between the two sets of rails and the diesel service rails are a little higher than the DC service rails. I agree with O L Leigh though in saying that buffer stops on a through platform stops it being a through platform - Ormskirk even has different platform numbers for the two sides of the stops.
 
Last edited:

David Dunning

Member
Joined
27 Oct 2009
Messages
210
Location
York
I dont think Fareham really counts . If you removed the buffer stop you'd end up down the hole between the two A27 bridges , not on your way to Cosham .
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
I dont think Fareham really counts . If you removed the buffer stop you'd end up down the hole between the two A27 bridges , not on your way to Cosham .

It surely counts if you interpret the original question as referring to platforms originally built as through platforms that now have buffers.
 

David Dunning

Member
Joined
27 Oct 2009
Messages
210
Location
York
ummm i see your point
in which case how about
Gunnislake
Bere Alston
Battersby

However i did read it as situations similar to the Kirkby/Ormskirk layout which originally there was a buffer in the middle of a line between the two systems , and I didnt think that Fareham counted as the line wasnt blocked it was terminated
 

Bedpan

Established Member
Joined
4 Feb 2010
Messages
1,299
Location
Harpenden
Giving that platform over to the tram system probably seemed a great idea at the time, but I don't think it would happen nowadays. Running twice as many trains round the loop is a NR aspiration once Thameslink is in place, (ie 4 tph Blackfriars to London Bridge) but the present layout isn't too clever for that. It would require 8 calls an hour at Wimbledon, but timekeeping would need to be pretty exact because alternate trains would be in opposite directions.

Is there anywhere else practical to relocate the tram platform - outside the station would probably be a good idea if only to get rid of all those Oyster PAYG questions...

I don't think so, no way of building a platform 11 adjacent to platform 10 years ago they built the Centre Court shopping centre adjacent to platform 10 - there is just about room for another track alongside platform 10, but not a platform to go with it.

The only other feasible place would be on the south side of the bridge, which is about 200 yards from the station footbridge which is itself at the south end of the platforms. Unless of course there was room under the bridge itself - I don't know the answer to that one.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Or, think differently- off the reserved alignment at Dundonald Road, and round the loop formed by the A219.
 
Status
Not open for further replies.

Top