I am looking to book a training course where I will have to go to London Bridge from East Croydon. I have heard that route has very bad disruption because of the enginnering works. When will they finish?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
In about 4 years or so? Around about the end of 2018.

Not that long really, it'll come round before you know it, like leap years, the next World Cup or the next Olympics...
 

sarahj

Established Member
Joined
12 Dec 2012
Messages
1,897
Location
Brighton
A passenger once asked me., late at night 'when will the engineering works on the Brighton Mail Line end?'

My reply, 'this lot, on friday, but really for the whole line. never'

And then added, 'the day they stop, is the day you start to worry'
 

maniacmartin

Established Member
Fares Advisor
Joined
15 May 2012
Messages
5,438
Location
Croydon
I commute via East Croydon into London Bridge. I usually arrive into LBG between 07:30 and 07:45 in the morning, and depart from LBG between 18:30 and 19:00 in the evening. This is probably not quite the times you will be travelling, however I will offer my observations.

Things seem to have stabilised at LBG following the culling of the West Croydon stoppers and some timetable tweaks. At the times I travel, you can usually get a seat if you are prepared to walk to the country end (which is the end with the main ticket office at East Croydon), and avoid the long-distance trains to/from the south coast. Brighton trains are particularly busy. Avoid Brighton, Bognor Regis, Littlehampton etc trains, and aim for Uckfield, East Grinstead, Horsham or Caterham/Tattenham Corner trains.
 
Last edited:

CNash

Member
Joined
30 Dec 2010
Messages
336
I happened to be at City Thameslink on the 5th of January, and figured I'd just catch a train to London Bridge from there instead of walking to Cannon Street, my usual station. I asked the gateline staff if trains were still running to London Bridge - his response was "Oh yes - your next train is in about three years! We have a seat for you over here if you'd like to wait..."
 

samogers

Member
Joined
20 Feb 2014
Messages
173
Location
Swansea
Brighton trains are particularly busy. Avoid Brighton, Bognor Regis, Littlehampton etc trains, and aim for Uckfield, East Grinstead, Horsham or Caterham/Tattenham Corner trains.

Do NOT board Uckfield trains, they are unbelievably overcrowded
 

EbbwJunction1

Established Member
Joined
25 Mar 2010
Messages
1,771
Location
Newport, South Wales
You may think that you've got it bad .... but the Boston Central Artery/Tunnel Project (CA/T), known unofficially as the "Big Dig" took twenty five years to complete!

Initial planning began in 1982, with ground works starting in 1991. It was scheduled to be completed in 1998, but wasn't finally completed until 2007. When I was there in 1997 (it was already well over due and massively over budget then!), I sw a sign which said:

"Rome wasn't built in a day .... if it had been, we'd have hired their contractors!"

I'm sure that London Bridge won't take that long ... or (having read this topic) am I?

:)
 
Status
Not open for further replies.

Top