When will something be done about the Whitby branch ?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
Most probably done in anticipation of the strident "let's open all old branch lines" brigade campaign to reopen the former Devon and Somerset Railway link at Morebath Junction Halt...:p

I would have thought that the 'Tivvy Bumper' would be a better candidate for reinstatement.
 

Harpers Tate

Established Member
Joined
10 May 2013
Messages
2,052
That block section needs to be broken up, one way or another.
Yes, it does - at Grosmont Junction, I'd suggest. Indeed, it's a pity resources weren't there to do that at the outset of regular NYMR services.
Ideally, of course, it would also be far more automated/mechanised, removing the need for protracted pauses while traincrew work groundframes and so on.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
Yes, it does - at Grosmont Junction, I'd suggest. Indeed, it's a pity resources weren't there to do that at the outset of regular NYMR services.
Ideally, of course, it would also be far more automated/mechanised, removing the need for protracted pauses while traincrew work groundframes and so on.

Yes, I find it surprising there's not a break in block section there already.

Given the traditional nature of the signalling, surely it must be possible to recondition some equipment from elsewhere on the network, at not too much cost !
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,969
Location
Airedale
Quite, but the question remains, what happened to passengers apparently dumped at Grosmont (probably not very many), and if the train was terminated there how did the more numerous passengers out of Whitby proceed to Grosmont and beyond?

The train showing as leaving Whitby on RTT barely had time to stop, let alone connect to other carriages at Grosmont.
Belatedly: it is shown as starting at Grosmont. I wonder if pax from Whitby were carried on a delayed NYMR train or bussed? (Sorry, realise on Sundays it is the last train of the day - very odd to turn it short then!
Edit: yesterday the 1600 ex Whitby was cancelled throughout according to RTT, leaving unit and crew at the terminus! I imagine that's not quite the whole story....

That block section needs to be broken up, one way or another.
For this to be of any use, squeezing in an extra teatime train, you'd need a block post at Sleights (otherwise the NR train would sit at Glaisdale for 10min to allow the NYMR to fit between, because of the journey times).
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
Belatedly: it is shown as starting at Grosmont. I wonder if pax from Whitby were carried on a delayed NYMR train or bussed? (Sorry, realise on Sundays it is the last train of the day - very odd to turn it short then!
Edit: yesterday the 1600 ex Whitby was cancelled throughout according to RTT, leaving unit and crew at the terminus! I imagine that's not quite the whole story....


For this to be of any use, squeezing in an extra teatime train, you'd need a block post at Sleights (otherwise the NR train would sit at Glaisdale for 10min to allow the NYMR to fit between, because of the journey times).

Yes, Sleights would be the ideal place.

It would be interesting to know the full story of the cancelled 16:00 yesterday !
 

Skipness

Member
Joined
18 Dec 2015
Messages
200
Location
North Yorkshire
On the news today thatSirius Minerals is having to scale back its progress because of a lack of finance. This is the company that is providing financial support for the expansion of the Esk valley timetable from the December change. (see my post from Sept 7th)
 
Last edited:

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,750
On the news today thatSirius Minerals is having to scale back its progress because of a lack of finance. This is the company that is providing financial support for the expansion of the Esk valley timetable from the December change. (see my post from Sept 7th)
The funding is due through a Section 106 Agreement. That agreement will specify how much must be paid and when eg commencement on site, commencement of operations. The amount due is small in comparison to the overall costs of the mine project.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
Interesting article in Modern Railways this month, on the changes to the Whitby branch that have been undertaken and are planned.

It confirms fifth and sixth trains (at the start and end of the day) for the December timetale change. It also addresses the issues with adding the seventh and eighth trains in the middle of the day (which would be more useful for those visiting from outside). It seems to be suggesting either a loop or changes to the signalling system i.e. shorter block sections. Either way they say it will be 2-3 years before anything concrete happens on these.

The piece doesn't really address the overcrowding on the current services that I and others on here have experienced. If it is going to be 2-3 years before the extra trains, they're goinf to need to do something about it in the short term.
 

70014IronDuke

Established Member
Joined
13 Jun 2015
Messages
4,083
Interesting article in Modern Railways this month, on the changes to the Whitby branch that have been undertaken and are planned.

It confirms fifth and sixth trains (at the start and end of the day) for the December timetale change. It also addresses the issues with adding the seventh and eighth trains in the middle of the day (which would be more useful for those visiting from outside). It seems to be suggesting either a loop or changes to the signalling system i.e. shorter block sections. Either way they say it will be 2-3 years before anything concrete happens on these.

The piece doesn't really address the overcrowding on the current services that I and others on here have experienced. If it is going to be 2-3 years before the extra trains, they're goinf to need to do something about it in the short term.

Hmmmm. I suspect any introduction of trains 7 and 8 will depend a lot on the impact of trains 5 and 6 on attracting traffic?
The problem, I fear, is that the line is simply too slow to make any real impact on Whitby + intermediate stations to Teeside commuter flows. A new loop or reduced block sections would certainly help capacity, but I wonder if a steady programe of track upgrading to allow, say, a +10 mph speed increase where possible would be a better use of funds in the long term? (I confess I'm sitting in an armchair as I type - and I'm all speculation here. I would love to see the line develop, but I've never used it myself.)
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
Hmmmm. I suspect any introduction of trains 7 and 8 will depend a lot on the impact of trains 5 and 6 on attracting traffic?
The problem, I fear, is that the line is simply too slow to make any real impact on Whitby + intermediate stations to Teeside commuter flows. A new loop or reduced block sections would certainly help capacity, but I wonder if a steady programe of track upgrading to allow, say, a +10 mph speed increase where possible would be a better use of funds in the long term? (I confess I'm sitting in an armchair as I type - and I'm all speculation here. I would love to see the line develop, but I've never used it myself.)

I don't think the length of the line is the problem - there never seems to be a shortage of end-to-end traffic.

The new train in the morning is more for Whitby residents than incommers, so will have little bearing on visitors to the town. An additional train at the end of the day might increase the popularity of the route with visitors though.
 

70014IronDuke

Established Member
Joined
13 Jun 2015
Messages
4,083
I don't think the length of the line is the problem - there never seems to be a shortage of end-to-end traffic.

The new train in the morning is more for Whitby residents than incommers, so will have little bearing on visitors to the town. An additional train at the end of the day might increase the popularity of the route with visitors though.

I don't think anyone, anywhere believes any significant population of Teeside will be rising at 04.15 to catch the new train TO Whitby. It will run more days than not largely as ECS, I'd bet.

The question is, how many from Whitby and intermediate stations will rise catch the first train into Teeside (or beyond)? As an overall journey of 90 minutes (or so), I fear not very many. But I hope I get proved wrong. Perhaps if good, and secure connections are made at Darlington, it may prove attractive to some long-distance passengers.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,110
Location
Redcar
I don't think anyone, anywhere believes any significant population of Teeside will be rising at 04.15 to catch the new train TO Whitby.

Not gonna lie but I do wonder how often it will have even a single passenger and whether Northern will need to issue those automatic defibrillators to their conductors to help them recover from the heart attacks caused by there being a passenger on board.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
An hour later and the occasional walker might get a cheap hotel in Middlesbrough and an early start, but not that early!
 

AndyHudds

Member
Joined
17 Jun 2012
Messages
601
I don't think anyone, anywhere believes any significant population of Teeside will be rising at 04.15 to catch the new train TO Whitby. It will run more days than not largely as ECS, I'd bet.

The question is, how many from Whitby and intermediate stations will rise catch the first train into Teeside (or beyond)? As an overall journey of 90 minutes (or so), I fear not very many. But I hope I get proved wrong. Perhaps if good, and secure connections are made at Darlington, it may prove attractive to some long-distance passengers.

Are Northern just paying lip service here, introducing a train with no connections for long distance travel at the other end and is there a commuter market from Whitby in to Teeside? Then just waiting for it to fail to say 'we told you so'?
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,110
Location
Redcar
Are Northern just paying lip service here, introducing a train with no connections for long distance travel at the other end and is there a commuter market from Whitby in to Teeside? Then just waiting for it to fail to say 'we told you so'?

Local user group have been campaigning for years for a train that arrives into Middlesbrough before 9am for people to use to access the job market or onward travel earlier than the current 1015 first arrival into Middlesbrough).

Whether or not there's any actual demand for a service that leaves at 0633 and arrives at 0756 I think is up for debate. Perhaps if it was more like an 0830 arrival (so around 0700 off Whitby) it might have more prospect of success but this was the only time that they could find that would work with the restrictions around Nunthorpe.

Personally whilst I think it will have a few users but I doubt it'll be particularly well used but the usergroup got their wish. After a fashion...

Funding is via North Yorkshire County Council and the Sirius Minerals development so as long as that lasts the service will last. Whether it continues after that is anyone's guess.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,483
Location
Sheffield
Local user group have been campaigning for years for a train that arrives into Middlesbrough before 9am for people to use to access the job market or onward travel earlier than the current 1015 first arrival into Middlesbrough).

Whether or not there's any actual demand for a service that leaves at 0633 and arrives at 0756 I think is up for debate. Perhaps if it was more like an 0830 arrival (so around 0700 off Whitby) it might have more prospect of success but this was the only time that they could find that would work with the restrictions around Nunthorpe.

Personally whilst I think it will have a few users but I doubt it'll be particularly well used but the usergroup got their wish. After a fashion...

Funding is via North Yorkshire County Council and the Sirius Minerals development so as long as that lasts the service will last. Whether it continues after that is anyone's guess.

A pity the precarious financial position of Sirius may soon remove one leg of the finance. Noting how popular a 6.15 departure has become for early commuters from Sheffield to Manchester (taking 50 minutes) I wouldn't totally discount use of this 6.33 train, nevertheless over 80 minutes from Whitby to Middlesbrough at that hour sounds a somewhat masochistic journey. More useful as it gets towards destination.

The outrun will be one on which bets may be taken as to where any passenger joins. Knowing how hard the user group has worked to get more services I hope I'm wrong.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,110
Location
Redcar
A pity the precarious financial position of Sirius may soon remove one leg of the finance.

Indeed! I'm not quite sure on what terms the money has been handled. Whether it's all been handed over up front per project funded or whether it was expected to be disbursed over time. If it's over time...

Noting how popular a 6.15 departure has become for early commuters from Sheffield to Manchester (taking 50 minutes) I wouldn't totally discount use of this 6.33 train, nevertheless over 80 minutes from Whitby to Middlesbrough at that hour sounds a somewhat masochistic journey.

Yes I wouldn't rule it out but if you live in Whitby and are not planning on working in the town you probably already have a car (heck even if you are you probably have a car anyway) in which case Middlesbrough is only about a fifty minute drive away. Okay in winter it's a tough slog over the moors so maybe the train wins during the few weeks when there's snow but for the other fifty weeks of the year that's an hour quicker round trip to/from home and it's from your front door and back again...

As you say the usergroup have campaigned hard for this but I'm just not convinced that it's actually going to end up being used all that much. Even when it gets closer to Middlesbrough we're not talking about numbers over small country villages of people until you hit Nunthorpe. And they'll all have cars...

That being said from Nunthrope it might actually do quite well once word gets around. Departing at 0742 allows it to fill a gap between the 0720 and the 0820 by providing an arrival into Middlesbrough at 0755.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
Well, it's a good sign that they're doing something.

I'm not sure how much of an outward market there is from Whitby, but it will be good for people who want to spend the whole day away.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Apologies if well answered before...
How unrealistic is the obvious crayon improvement of cutting off Battersby - ballpark cost and gains?
Gradients look like they could be an issue (especially if you want a tight curve) and if the curve can’t be too tight you might have to replace the LC with a bridge. Could you lose the loop without replacement elsewhere to save costs without ruining timetabling?
I guess the big question would be whether it would save enough time to make a difference?
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,969
Location
Airedale
That being said from Nunthrope it might actually do quite well once word gets around. Departing at 0742 allows it to fill a gap between the 0720 and the 0820 by providing an arrival into Middlesbrough at 0755.
I note that the 0720 is retimed 0642 as part of the alterations - the whole thing being done within existing stock diagrams.
How unrealistic is the obvious crayon improvement of cutting off Battersby - ballpark cost and gains? ....
I guess the big question would be whether it would save enough time to make a difference?

It might save 5 minutes, which on its own does very little.
Losing the crossing opportunity would particularly affect the new commuter train and the morning school train, though that might be manageable.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,110
Location
Redcar
I note that the 0720 is retimed 0642 as part of the alterations - the whole thing being done within existing stock diagrams.
Oh so it is. The danger of having too many tabs running RTT at the same time!
 

Glenn1969

Established Member
Joined
22 Jan 2019
Messages
1,983
Location
Halifax, Yorks
The potash mine operators are in financial trouble already. Take it that means the associated rail improvements will no longer be happening?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
Well, if the Potash funding is under question, there needs to be a plan B.

I would suggest 153's for summer strengthening.
 

4-SUB 4732

Established Member
Joined
7 Jan 2018
Messages
2,150
One thing we can all be sure of is Whitby always having a dreadful service. Moreover, Whitby must surely want quicker links towards Leeds, Manchester, London and elsewhere and depositing people in Middlesbrough after an excruciating journey makes the train so unattractive it keeps passenger numbers down and therefore appears to dull the case for investment.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
The potash mine operators are in financial trouble already. Take it that means the associated rail improvements will no longer be happening?
And that is before embarking on a 35 mile tunnel to Middlesbrough. It would be quicker to tunnel just to Whitby and take the stuff out by rail as at Boulby. If it is difficult tunnelling under the Esk, reopen Larpool Viaduct and part of the former Hawsker branch to as near the mine as possible.
That would mean a transformation of the route as regards infrastructure to take 2 or 3 freight trains a day.
 