I have a question of I was hoping some of the knowledgeable folks on this site might help me with and that is why the trains on the Holborn lines cross from fast to slow where they do.
As I understand it on the UP there are 3 opportunities to cross from Slows to Fasts: Loughborough Junction, Elephant & Castle, Blackfriars; and 2 opportunities to cross from Fasts to Slows: Loughborough Junction, Blackfriars. On the Down It’s the opposite (2 from Slow to Fast, 3 from Fast to Slow).
Now with a background in contingency planning and mitigating risks (But no Rail knowledge) I would have thought best practice would be to switch trains at the first opportunity so if you couldn’t complete the switch for whatever reason you could try again at the next set junction. Therefore optimally trains would change:
On the Up: Loughborough Junction
On the Down: Blackfriars
However, all the Suttons do the opposite and change at Blackfriars on the Up and Loughborough Junction on the Down.
The Sevenoaks Service do change at Loughborough Junction on the UP but on the Down they too change at Loughborough Junction.
The Orpington’s don’t normally need to change lines.
Is there some operational need I’m completely missing? I understand that what I’m calling Blackfriars Blackfriars Junction is South of the Junction with the Metropolitan Curve so conflicting with London Bridge Trains not an issue.
Aside from anything else it would be nice if all trains heading to Catford departed from Elephant from the same platform. It’s a long old trudge from Platform 2 to 4…
NB In the Peaks even the Sevenoaks makes the switch on the UP to the Slows at Blackfriars. But perhaps this is historical as the Beckenham Junctions used to run into Platform 4 at Blackfriars on or around the time the Sevenoaks ran into Platform 3 so this only physically possible by making the switch there. Or for that matter future proofing as they’re supposed to be a through train in the peaks so no switching required….
Anyway grateful for anyone who can help answer
or correct any of the above for that matter
As I understand it on the UP there are 3 opportunities to cross from Slows to Fasts: Loughborough Junction, Elephant & Castle, Blackfriars; and 2 opportunities to cross from Fasts to Slows: Loughborough Junction, Blackfriars. On the Down It’s the opposite (2 from Slow to Fast, 3 from Fast to Slow).
Now with a background in contingency planning and mitigating risks (But no Rail knowledge) I would have thought best practice would be to switch trains at the first opportunity so if you couldn’t complete the switch for whatever reason you could try again at the next set junction. Therefore optimally trains would change:
On the Up: Loughborough Junction
On the Down: Blackfriars
However, all the Suttons do the opposite and change at Blackfriars on the Up and Loughborough Junction on the Down.
The Sevenoaks Service do change at Loughborough Junction on the UP but on the Down they too change at Loughborough Junction.
The Orpington’s don’t normally need to change lines.
Is there some operational need I’m completely missing? I understand that what I’m calling Blackfriars Blackfriars Junction is South of the Junction with the Metropolitan Curve so conflicting with London Bridge Trains not an issue.
Aside from anything else it would be nice if all trains heading to Catford departed from Elephant from the same platform. It’s a long old trudge from Platform 2 to 4…
NB In the Peaks even the Sevenoaks makes the switch on the UP to the Slows at Blackfriars. But perhaps this is historical as the Beckenham Junctions used to run into Platform 4 at Blackfriars on or around the time the Sevenoaks ran into Platform 3 so this only physically possible by making the switch there. Or for that matter future proofing as they’re supposed to be a through train in the peaks so no switching required….
Anyway grateful for anyone who can help answer