redcaboose
Member
I regularly travel between Salisbury & Luton.
Sometimes I will ticket this by purchasing two advance tickets; SWR SAL-WAT & EMR STP-LUT. I use the bus to travel between WAT & STP (I have a bus pass), and always allow a minimum of 90 mins for this connection.
I have to book this as two journeys, but do this at the same time and collect CSST's from a machine, usually well before the journey date. It's done on a single booking reference, paid for in one transaction, and the tickets all come out together.
My question is this: if the first train is delayed to the point that I miss the second, can I then get the next available train, or do I need to buy a new ticket for the second leg?
It's not happened yet, and if it's looking tight, I might just use contactless on the tube to try to save a few minutes, but I'd like to know what I need to do if it did.
Sometimes I will ticket this by purchasing two advance tickets; SWR SAL-WAT & EMR STP-LUT. I use the bus to travel between WAT & STP (I have a bus pass), and always allow a minimum of 90 mins for this connection.
I have to book this as two journeys, but do this at the same time and collect CSST's from a machine, usually well before the journey date. It's done on a single booking reference, paid for in one transaction, and the tickets all come out together.
My question is this: if the first train is delayed to the point that I miss the second, can I then get the next available train, or do I need to buy a new ticket for the second leg?
It's not happened yet, and if it's looking tight, I might just use contactless on the tube to try to save a few minutes, but I'd like to know what I need to do if it did.