When a road is built over/under a railway line

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CarterUSM

Established Member
Joined
4 Jan 2010
Messages
2,495
Location
North Britain
The M74 extension is currently being constructed from the centre of Glasgow to the south east of the city, this has, amongst many other things, involved placing huge steel beams over the railway at eglinton st junction and also over the Ayr line too. Many notices have been issued with regards to this from a distraction point of view, i.e. do not watch them working when you should be watching the line ahead. It has resulted in little or no disruption to the railway whatsoever, though I think much work is done at night also. On a slightly related note, some high rise flats were recently demolished next to the queen st-falkirk-edinburgh line at around the cowlairs area, they were blown up at around 2 or 3 in the morning to minimise disruption to the railway!
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
There's recently been two new bridges built crossing the line south of Cambridge. The bridge beams and decks were installed during weekend closures.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Practice is to construct the new underbridge alongside the track in advance.

The track is removed and the underpass is excavated, and the bridge is slid into position.
 

j0hn0

Member
Joined
20 Jan 2009
Messages
563
Location
St Albans, England
I think that the (useless) contractors hired to build the Rugby relief road should be asked this question.

The bridge over the trent valley line is the one I am talking about
 

royaloak

Established Member
Joined
11 Oct 2009
Messages
1,389
Location
today I will mostly be at home decorating
Practice is to construct the new underbridge alongside the track in advance.

The track is removed and the underpass is excavated, and the bridge is slid into position.

Am I right that on a few occasions a temporary bridge has been built beside the old one, the track slewed over, a new bridge built on the site of the old one and the track put onto the new bridge on the old alignment.

Now I am sure I have seen this somewhere (ECML?) but cant remember where.
 

moonrakerz

Member
Joined
10 Feb 2009
Messages
870
When the A350 bypass round Chippenham was built a few years ago, the road had to pass under the main line to Bristol, which is on a high embankment.

The new (under)bridge was built in the field alongside the track. As soon as the last train had passed on Christmas Eve, the track was lifted, a huge section of the embankment was cut away and the new bridge slid into place.
The line was out of use for 72 hours, 48 of which were train free anyway.

Very impressive to see how it was done.
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
I know they replaced the A38 sliproads into plymouth by building the new ones on temp supports, demolishing the old, building the permanent supports, then moving each sliproad into the final position over a weekend. Each sliproad was about 400m...
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,103
Location
Near where the 3 ridings meet
Am I right that on a few occasions a temporary bridge has been built beside the old one, the track slewed over, a new bridge built on the site of the old one and the track put onto the new bridge on the old alignment.

Now I am sure I have seen this somewhere (ECML?) but cant remember where.

Bingley bypass is an example of this.
A temporary alignment was built then track slewed over / relaid on to it.
Old alignment removed, new bridge built and then track relayed and temp track removed.
 

ailsa

Member
Joined
7 Dec 2009
Messages
100
Location
The land of crop circles and white horses
Am I right that on a few occasions a temporary bridge has been built beside the old one, the track slewed over, a new bridge built on the site of the old one and the track put onto the new bridge on the old alignment.

Now I am sure I have seen this somewhere (ECML?) but cant remember where.

This was done on the Chiltern line near Bicester when the ring road was built. Steel piles were driven into the embankment and the ground alongside. The space between them filled in, and the track moved to one side. Then the new concrete bridge was poured and left to set. After this the track was moved back across onto the new bridge, and the remaining embankment demolished. IIRC the longest closure was a weekend.
 

MrC

Member
Joined
20 Nov 2009
Messages
218
Another example is St Cross Tunnel between Winchester and Shawford which is having to be replaced due to gauge enhancement along the route. First a complete new footbridge was built to take pedestrians and service cables etc which the old tunnel used to carry. Now a new bridge deck is being built over the top of the old tunnel to carry the road and, when this is complete, the new bridge will be reopened to road traffic while the old tunnel is dismantled around it. When all is complete the new footbridge will be removed.

For info see http://www3.hants.gov.uk/roads/hampshire-roadworks/winchester-stcross-roadworks-2010.htm and some good pics at http://www.flickr.com/photos/foilman/4464040185/
 