gsc777
Member
So Chiltern is currently doing great, all things considered, but with the potential for nationalisation in the near future, what are people's thoughts for what should happen.
For me, a strong priority is electrification of the Marylebone—Moor Street line, which could actually have been a better investment, at least in the short term, than the London—Birmingham leg of HS2 (that money could have instead gone towards the Birmingham—Crewe and beyond, which would have been much more useful, but what do I know?). Electrifying the route to Oxford would be useful but it'll depend on what's happening with EWR. Electrifying the route to Aylesbury would be fantastic too, with the Snow Hill lines getting last priority. Seeing electrified London—Stourbridge/Kidderminster/Worcester would be great to see and a great alternative to GWR. The lines in the Midlands (to Dorridge, Stratford etc) are probably last in terms of electrification priority.
This might be a pipe dream but is there any real way to get Aylesbury onto the Thameslink line? Surely there must be space somewhere for a tunnel onto the Midland Main Line or directly into the Thameslink core. Thameslink stopping services from Aylesbury could be a game changer, with Chiltern opting to run fast London—Aylesbury services and services towards Bletchley and Milton Keynes once EWR is complete.
With EWR, do we know if there are plans solidly in place for the Aylesbury connection? If so, it would also be useful to make the lines to Parkway, and between Aylesbury and Princes Risborough, dual-tracked.
It would be cool to see Chiltern become the primary route from London into Birmingham! It could equally take pressure off LNR and Avanti services if Chiltern can match them, relieving the mess that is the WCML.
For me, a strong priority is electrification of the Marylebone—Moor Street line, which could actually have been a better investment, at least in the short term, than the London—Birmingham leg of HS2 (that money could have instead gone towards the Birmingham—Crewe and beyond, which would have been much more useful, but what do I know?). Electrifying the route to Oxford would be useful but it'll depend on what's happening with EWR. Electrifying the route to Aylesbury would be fantastic too, with the Snow Hill lines getting last priority. Seeing electrified London—Stourbridge/Kidderminster/Worcester would be great to see and a great alternative to GWR. The lines in the Midlands (to Dorridge, Stratford etc) are probably last in terms of electrification priority.
This might be a pipe dream but is there any real way to get Aylesbury onto the Thameslink line? Surely there must be space somewhere for a tunnel onto the Midland Main Line or directly into the Thameslink core. Thameslink stopping services from Aylesbury could be a game changer, with Chiltern opting to run fast London—Aylesbury services and services towards Bletchley and Milton Keynes once EWR is complete.
With EWR, do we know if there are plans solidly in place for the Aylesbury connection? If so, it would also be useful to make the lines to Parkway, and between Aylesbury and Princes Risborough, dual-tracked.
It would be cool to see Chiltern become the primary route from London into Birmingham! It could equally take pressure off LNR and Avanti services if Chiltern can match them, relieving the mess that is the WCML.
), and possibly people from places like High Wycombe who would proportionally see a significant increase in journey time to Wembley. However most people don't go there often, and those from further away e.g. Birmingham would probably manage a similar end to end time by using Avanti then the Tube, so I don't think it would be that controversial.