So we're incapable of building a type of DVT to operate with loco hauled services then?
No, but with much of the route constrained with short platforms if new stock were to introduced all vehicles should be passenger carrying.
So we're incapable of building a type of DVT to operate with loco hauled services then?
We have mrk3 DVTs and mrk2 DBSOs. They can go on one end, loco on the other. Granted there aren't many DVTs and DBSOs, but you could make two or three rakes to release 158s from some diagrams to other operators or to have 4-car throughout.DB have a driving trailer vehicle built in to one end of their double decker Regio stock and they attach a loco on the other end. We don't have any UK stock designs which incorporate that.
?????? If we are assuming we already have the locomotives (eg. 68s) then purchasing a fleet of unpowered coaches (including driving trailers) will be nowhere near as expensive as a bi-mode 140mph train with traction motors under most if not all vehicles. If you have to buy the locos as well it could be a close-run thing, depending on train lengths and whether they charge the original price (twice Pendolino) or the newer price on the later extensions to the order (slightly more than a Pendolino) for the IEP.Buying new rolling stock to use with locomotives would likely pay for a fleet of Bi-mode IEPs to operate the service.
We have mrk3 DVTs and mrk2 DBSOs. They can go on one end, loco on the other. Granted there aren't many DVTs and DBSOs, but you could make two or three rakes to release 158s from some diagrams to other operators or to have 4-car throughout.
?????? If we are assuming we already have the locomotives (eg. 68s)
then purchasing a fleet of unpowered coaches (including driving trailers)
will be nowhere near as expensive as a bi-mode 140mph train with traction motors under most if not all vehicles. If you have to buy the locos as well it could be a close-run thing, depending on train lengths and whether they charge the original price (twice Pendolino) or the newer price on the later extensions to the order (slightly more than a Pendolino) for the IEP.
Surly the most sensible option is to build new DMU's to operate on lines like the West Highland, Far North/ Kyle of Lockalsh, Cumbrian Coast, Cambrian Mainline/Cambrian Coast etc. Routes that are unlikely to be electrified in the next 30 years so will need new build diesel stock eventually which could free up 156's/158's for use elsewhere until they are freed up/replaced by electrification.
New build DVTs could have passenger accomadation in them. If you want existing stock, then you want a mrk2 DBSO.I mean the DVT is built in to a passenger carriage so this is what you see at one end opposed to building separate DVTs:
http://upload.wikimedia.org/wikipedia/commons/9/97/DB_Regio_DT_(8063779248).jpg
and this at the other end:
http://www.crashbuffer.com/estcpp1111.jpg
Yes, if you want to replace the whole fleet rather than just release a few 158s.But we don't, we only have 15 Class 68s, you need 12 trainsets at the very least to do Liverpool Norwich, probably more like 13 or 14.
Titanic operational benifits? A fixed formation LHCS set and a fixed formation MU are operationally similar.That is a price of £1.58m, which while feasible will certainly mean that you can't hope to spend less than the IEPs, at which point the IEP's titanic operational benefits will crush you on operating costs, and the drastic reduction in journey time will leave the loco hauled services in the dust.
As far as I am aware an IEP carriage costs roughly ~£2.5m to construct, so hardly 'twice' the Pendolino.
Yes, if you want to replace the whole fleet rather than just release a few 158s.
Titanic operational benifits? A fixed formation LHCS set and a fixed formation MU are operationally similar.
As for cost, you have to remember that IEP is a total train service contract.
The original batch (Great Western fleet) is going to cost twice as much per car per month compare to the lease+maintainance deal on Pendolinos. That crushes the operating cost benifit you would otherwise expect. Even the East Coast IEP fleet, some of which comes at a lower monthly fee, will INCREASE annual rolling stock costs for the franchise by a considerable ammount compared to the current IC125+IC225 fleet.
ALl this talk of getting some new locos to go with some new coaches to go with some new DVTs reminds me of the (Groucho Marx?) quote that ""If we had some eggs we could have eggs and ham, if we had some ham"..
So we're incapable of building a type of DVT to operate with loco hauled services then?
Maybe like a 158, depending on how many carriages you have. Not as quick as an IEP though.So your LCHS set can accelerate like a near fully motored multiple unit?
Sorry, you said 'operational benifits' not just 'benifts', so I thought you were refering to a sub-set of benifits which wouldn't include the things you listed. In fact, either IEP or LHCS would remove the operational benifit of being able to use portion working.Your Class 68 will consume no fuel (and suffer from no diesel engine wear?) between Grantham and Peterborough, no fuel while idling/stabled in Norwich/Liverpool station, no fuel while travelling between Hazel Grove and Deansgate and no fuel between Liverpool South Parkway and Liverpool Lime Street?
With impending electrification and potential minor reroutes of the service the situation gets even more in favour of the IEP, with potentially continuous electric operation between Liverpool and Hazel Grove and between Dore and Nottingham.
Correct, Loco-hauled carriages do not have this issue, but a full loco-hauled set does (passengers can't walk through the loco if you couple two LHCS trains together).Personally I think locomotive hauled stock is better than Railcars because they can be altered in length more easier than the DMU's as the operators can shove extra carriages in the rake if they longer trains as if you couple two DMU's (notably the Class 150/1's/170/185's) or Voyagers together. There is more limitations because there is no corridors in the middle due to the unused cabs which prevents passengers passing through the train. Loco-hauled carriages do not have this issue.
Personally I think locomotive hauled stock is better than Railcars because they can be altered in length more easier than the DMU's as the operators can shove extra carriages in the rake if they longer trains as if you couple two DMU's (notably the Class 150/1's/170/185's) or Voyagers together
More often than MUs. You can tell the unit number of a 2-car 158 from the coach numbers, for example, they almost never run with one coach from one unit and one from another unit, except FirstGW's hybrid 3-car sets.How often did/do loco hauled trains (inc HSTs, for arguments sake) actually alter their carriages?
More often than MUs. You can tell the unit number of a 2-car 158 from the coach numbers, for example, they almost never run with one coach from one unit and one from another unit, except FirstGW's hybrid 3-car sets.
No mention of DVTs in Photohunter's post.
DMUs work well on this route. If there was a surplus of suitable LHCS and locos around that might be an argument for it, but to suggest new LHCS to go with new 68s just because they do on the continent is foolish.
well it's foolish not to read the posts fully![]()
How often did/do loco hauled trains (inc HSTs, for arguments sake) actually alter their carriages?
What "should" operate Liverpool to Norwich? Exactly what is already used on the service.
What "should" operate Liverpool to Norwich? Exactly what is already used on the service.
If i had 10p for everytime i gave the reasons why the current stock is unsuitable and needs replacing i'd have £2.40 now, so i'm not going to repeat myself anymore. Simply refer to my previous posts on the subject.
Mate, that wouldn't work anymore as it is a "classic" set compared with the modern plastic. Nice config and would appeal to the bashers (fans) but probably not so much for the generic passenger, so something more modern looking would be needed here fellaWhat should operate it is a class 37/4 with 4 or 5 mark 2's. If they can get the odd class 50 then even better. Failing that then a 4 car class 158 is pretty good at the job.
. Well I have thought of another "cheapo" replacement train. If there is any left, what about a Class 67 + Class 442 set converted to a remote unit like the Class 438 "4TC" sets were when they were used with 421's and Class 33's? Would make a nice sized train as well as the doors are powered. But the first class compartments would have to go though. Assuming there is still some leftovers stored somewhere. You're welcome! Go buy yourself something pretty.