zwk500
Veteran Member
It wasn't a failed line - it was actually covering its operating costs (or close to it), and something like 60-70% of the traffic from Uckfield was southbound. As it happens, the line from Lewes to Uckfield opened before the connection from Uckfield to London. BR even applied to parliament for funding to keep the line open via Hamsey - Oh what might have been! It was a perfect storm of a flood damaging the viaduct, political pressure on the railways to cut costs, and the pressure from ESCC for the insane relief road through the town centre (subsequently abandoned, of course, and leading to the Bypass tunnel through Cliffe hill and the vast gouge out of the downs south of the town).I admire your attempt to battle the "We Must Re-open Everything" argument with logic and practical examples at ground level of why this will be significantly more complicated than just sticking down a couple of miles of track from Uckfield to Lewes...
I just don't think that *evidence* has much success in dampening the enthusiasm that some people have for rebuilding some failed line from fifty years ago (based on various threads on here) - always worth a try thought!
Even today, reopening the line would have substantial benefit to Brighton, Lewes, Uckfield and beyond. The problem is, as you say, that it's more complicated than just sticking down 10 miles of track where there happened to be a railway half a century ago. There is a technically feasible route of c.12-15 miles that would connect 30,000+ people in 3 towns all scheduled for development, and those towns with Brighton. But it's a brand new route so will have explosive planning and development costs, and almost certainly a public inquiry. It also requires substantial intervention at Brighton, redoubling and upgrading of the Uckfield-Hurst Green section, and paths through the rebuilt East Croydon. In the scenario we are now in of limited opportunity for investment, there are better places for the government to put its money in.
A tempered-crayon proposal (i.e. one that is theoretically possible) is to reinstate Tunbridge Wells-Eridge and Lewes-Uckfield via Ringmer, and you would run 1tph Brighton-Uckfield-London (Calling Falmer, Lewes and Uckfield then all stations), 2tph Brighton-Uckfield-Tunbridge Wells West (all stations from Brighton), accepting that you'll never get more than the current 1 path per hour through Croydon, and Extend the SE Tunbridge wells terminators round the corner to West, where you would sweep away Sainsbury's & Homebase to rebuild a 3-platform 12-car station. The theoretical line even leaves the Lavender line untouched (in one option), although there's no way of reopening Tunbridge Wells to Eridge without sacrificing the SVR. Thank god it'll never have the business case to move forward....If we go full croyons, and build the following connections:
How many people would use a half hourly Brighton to Gillingham service?
- Lewes - Uckfield
- Eridge - Tunbridge Wells - Paddock Wood
- Cuxton - Rochester
It's possible that a standalone branch to Ringmer, from Glynde, and extension of the Brighton-Lewes all stations has a better BCR than Lewes-Uckfield.