Unless there is a detailed technical specification, how do you properly define the requirements or test that the train meets the requirements?
Sending a test train through Dawlish is not going to prove anything if there is no storm. And even if you wait until there is a storm, Will that storm be representative of the conditions you want the train to operate in?
I would suggest that a test rig should have been made, using the same high pressure, high volume water pumps that firefighters use. To spray water with the same salt content as sea water over the test train. And there should be multiple hose outlets, spraying water at multiple different angles.
Then the test train should go through/past the test rig at various speeds, including at walking speed, and multiple times in both directions. And with the train being turned so that both sides are tested, or the test rig set up to spray from either side.
That I think would be a reasonable attempt at simulating the conditions At Dawlish.
Sending a test train through Dawlish is not going to prove anything if there is no storm. And even if you wait until there is a storm, Will that storm be representative of the conditions you want the train to operate in?
I would suggest that a test rig should have been made, using the same high pressure, high volume water pumps that firefighters use. To spray water with the same salt content as sea water over the test train. And there should be multiple hose outlets, spraying water at multiple different angles.
Then the test train should go through/past the test rig at various speeds, including at walking speed, and multiple times in both directions. And with the train being turned so that both sides are tested, or the test rig set up to spray from either side.
That I think would be a reasonable attempt at simulating the conditions At Dawlish.